3 bedrooms
3,990,000–
Donkaew Village 19 offers a comparatively straightforward residential idea: detached family houses on individual plots in Don Kaeo, Mae Rim, Chiang Mai Province.
Chiang Mai

From 3,990,000 THBBasis requires confirmation · confirm the date of a current quotation. Current price list, layouts and availability — discussed one-to-one with a project specialist
Photographs from the project’s materials.
Cottage 1, Cottage 2 and Japandi 1 each offer three bedrooms, but only Cottage 2 provides three bathrooms. For a busy household, that extra bathroom may improve daily life more than a few extra square metres. The two-storey Cottage 3 adds a fourth bedroom and much more internal space, at the cost of introducing stairs. The published dimensions describe proposed house models; they are not an as-built survey of a particular address.
Two buyers may select the same house design and end up with different land areas, outlooks and prices. The development’s material includes changing assumptions about base plot sizes, as well as an explicit additional-land charge on its dedicated website. The sensible unit of comparison is therefore the quoted plot-and-house package, not the brochure floor area alone. The plot boundaries and access should be verified against the individual sale documents.
Village 19 has a useful plot-status display, distinguishing land awaiting a buyer from homes under construction and plots already reserved or sold. That visibility should not be confused with independent proof of completion. A chosen unit needs its own build schedule, inspection rights and delivery provisions. The right questions differ between a house that can be physically inspected and a lot on which construction has barely started.
A garden, playground, walking route and staffed security can make a small suburban estate feel more settled. They also have ongoing costs and operational responsibilities. The public brochures do not spell out the resident management structure, fee schedule or long-term funding of security and common-area maintenance. A buyer should see those terms before estimating the cost of ownership or assuming the announced amenities will always operate in the same form.
The launch report and the parent brand’s website both lead to Donkaew 999 Construction, and business directories identify the registered company. That is materially stronger than an anonymous project advertisement. It still leaves open who holds title to the individual land parcel and which legal person will collect deposits and sign the transfer contract. The legal link between the branded development and the specific transaction remains essential.
Donkaew Village 19 offers a comparatively straightforward residential idea: detached family houses on individual plots in Don Kaeo, Mae Rim, Chiang Mai Province. The appeal is a home, a small piece of private outdoor space and parking for two cars, rather than the shared facilities or rental programme of a condominium. Chiang Mai News reported the scheme’s formal launch on 14 March 2026. That launch date identifies the development and its sales history; it should not be mistaken for a completion certificate or a handover date for every house.
The numbered name matters because Donkaew Village is a broader family of developments. Village 19 has its own dedicated website, plot plan and four named house layouts. The developer also markets Village 18 separately, with a different layout range. Agents sometimes group developments under the parent brand, so a buyer comparing quotations should insist on the exact project, plot number and house design. A construction photograph from Village 18 cannot establish the state of a plot at Village 19, even if the sales teams are related.
The latest project presentation shows 69 numbered plots. It says that 68 are for sale and that plot 28 functions as the sales office. Other marketing profiles describe 69 residential units. Those statements are close, but they do not carry identical meanings: a numbered parcel, a house planned for that parcel and a completed dwelling are three separate things. There is enough evidence to describe the estate and its scale, but not to certify the final count of legally subdivided residential titles or assume that every plotted home is ready to transfer.
An unusually useful feature of the published information is the distinction among the standard house types. Cottage 1 is a single-storey, 140-square-metre design with three bedrooms and two bathrooms. Cottage 2 keeps the same bedroom count but offers 154 square metres and three bathrooms. Japandi 1 is a separate, single-storey, three-bedroom option of 146 square metres with two bathrooms. Cottage 3 is the larger, two-storey choice, with 215 square metres, four bedrooms and three bathrooms. All four designs advertise parking for two cars. These are meaningful differences in how people can use the house, not merely alternative façades.
Land size is less uniform than the glossy overview may suggest. The older project page links individual designs to plots of 50 or 55 square wah. A contemporary launch article refers to a 52–64-square-wah offering, while the dedicated website advertises a 50-square-wah starting lot for Cottage 1 and additional land at an extra cost. This looks like the kind of variation that can arise between launch packages, plots and later sales campaigns, but the public sources do not establish a single reconciliation. The binding figure for a buyer is the area on the chosen parcel’s title and sale agreement, not an average from a project profile.
At launch, the announced entry prices were THB 3.99 million for Cottage 1, THB 4.15 million for Cottage 2, THB 4.99 million for Cottage 3 and THB 3.99 million for Japandi 1. The developer’s current public presentation still displays the THB 3.99 million entry point. Those figures can help a buyer frame the comparison, but they are not confirmation that a particular plot is still available on those terms in November 2026. A different site area, construction upgrades, finish specifications and contract allocations could change the payable amount. The sales website also contains finance illustrations and promotional language, which should not be treated as a bank-approved loan or a contractual promise of fees being waived.
The advertised common areas include a landscaped garden, a walking area and a children’s playground. The developer promotes round-the-clock security; operational details have not been independently verified. What the sources do not establish is the full operating framework after residents move in: which entity maintains the internal roads, who employs security staff, when the common amenities are delivered, how costs are divided and whether the management arrangements can change. For an owner-occupied estate, such details often shape the day-to-day experience as much as the floor plan does.
The business behind the launch is named as Donkaew 999 Construction Company Limited in local coverage, and the official Donkaew Village site identifies the same company in its contact information. A Thai business-data provider records company registration number 0505559010435, dating from 2016. This provides a credible trail to an identifiable operating company. It does not tell us whether that company owns every parcel in Village 19 or whether the buyer’s contract will be signed by a different project entity. Those are document-level questions, especially important where a wider development brand has involved more than one corporate vehicle over time.
The setting is in Mae Rim rather than central Chiang Mai. The developer quotes indicative journeys to Nakornping Hospital, Mae Rim shopping and the city centre, with travel times expressly dependent on traffic. In practice, the location is easiest to assess through ordinary routines: school drop-offs, work journeys, supermarket visits and the condition of the last part of the road to the estate. A household expecting to drive most days may regard the detached-house format as a fair trade-off. Someone relying on a walkable central neighbourhood should not assume that a short promotional drive-time estimate translates into comparable convenience.
Build progress appears to vary by plot. The project publishes an updating plan with different states for plots available, under construction, reserved and sold. That is more informative than a single label saying a scheme is “off plan”, yet it still does not prove legal completion, utility connections or delivery readiness for a specific property. No independently verified handover schedule for each house was available in the materials reviewed. A completed show home is useful to inspect finish quality, but it cannot substitute for the construction specification and completion evidence relating to the particular house being purchased.
A foreign buyer needs to separate ownership of a building from rights over the underlying land. Thailand generally restricts direct land ownership by foreign individuals, subject to narrow statutory exceptions. A registered lease or a separately documented building right may warrant consideration for a specific transaction, but neither has been established for these sale plots. This is a detached-house development, not a registered condominium offering a foreign ownership quota. Until the parcel title, proposed counterparty and registrable rights have been examined, the phrase “house and land” in a listing should be read as a description of the domestic-market package, not as a transferable ownership promise to every nationality.
For a family planning to live here, the main decision is whether the particular design, plot, travel pattern and eventual maintenance arrangements make sense together. The investment case is less defined. We found no project-specific evidence supporting a rent forecast, occupancy assumption or guaranteed return, and the ability to operate short stays cannot be inferred from a house listing. The choice should be evaluated on actual purchase and running costs, the legal right obtainable, realistic completion timing and the likely buyer pool for eventual resale. That gives a much more dependable basis than treating the lowest advertised price as a complete investment calculation.
The smallest floor plan is designed for a household needing three bedrooms without stairs. Two parking spaces are advertised. The developer page associates it with a 50-square-wah starting plot, whereas the March launch coverage used 55 square wah; only a plot-specific quotation can resolve that difference. Final fixtures, finishes and surveyed dimensions should be set out in the contract.
Its value is less about exterior styling than the third bathroom, which can change how a shared family home works. The official design page lists two parking spaces and a 55-square-wah plot. The launch price was a starting quotation, not a fixed price for every location within the estate or a promise of identical materials and extras.
The larger, two-level model adds a fourth bedroom and significantly more interior space. That could allow a study or guest room without taking away a family bedroom, although buyers should inspect the actual floor allocation and stair layout. Public material varies on the starting plot size. The published launch figure is a reference point, not an executed offer.
The Japanese-Scandinavian-inspired appearance is a design choice rather than a different ownership product. The published specification remains a conventional three-bedroom detached house, with two bathrooms and parking for two cars. Buyers should compare its room arrangement and chosen plot directly against Cottage 1; the similar headline price does not make the packages legally or physically identical.
The four standard designs are supported by the developer and launch coverage. Plot sizes differ across the published material, from 50 or 55 square wah for specific examples to a 52–64-square-wah launch range; the current site also prices additional land separately. Check the actual plot, specification and price before relying on any of these figures.
Each option includes a factual reason for the comparison. Price and availability are confirmed for the selected unit.

Same property type and a close price anchor

Same property type and a close price anchor

Same property type and a close price anchor

Same property type and a close price anchor
6 amenities
Address / landmarkDon Kaeo, Mae Rim, Chiang Mai 50180, Thailand
The map loads from OpenStreetMap on request.
The circle shows the project’s approximate location; we confirm the exact address and the plot boundaries when you get in touch. © OpenStreetMap contributors.
Temperature, rain, sun and wind month by month for the surrounding area.
NASA POWER · 2001–2025 · area-wide climate averages, not a daily forecast. Rain bars show mm/day. Sun line is solar energy, not a count of sunny days.
Regional climate reference for Chiang Mai; the project location has not been established by this weather grid.
Select the months you expect to stay to compare their long-run climate averages.
Select one or more months.
Climate: NASA POWER, 2001–2025 area averages; solar energy is not sunny-day count. Tourism: observed months for Chiang Mai province, not seasonal norms or this property’s rental occupancy.
Regional climate reference for Chiang Mai; the project location has not been established by this weather grid.
Chiang Mai province · September 2026
Foreign visitors and hotel room occupancy in the province
Thailand Ministry of Tourism and Sports · Ministry of Tourism and Sports · preliminary monthly province figures, not this property’s rental occupancy.
Thailand · published price index, historical data
2015-01 — 2026-08 · Bank of Thailand · 2011=100. Regional housing index, not villa transaction prices or this project’s return.
A short route from daily-life questions to market evidence. Selected for this project’s location and stage; these pages do not verify the project itself.
Build your scenario from the published facts and your choices on this page. Not a rating or a return promise.
Choose a goal; your selections in the widgets below will appear in the summary.
No conditions selected yet. Start with fit criteria, everyday places or the months you plan to stay.
Prepare a request around published unknowns and your conditions. Nothing is sent automatically.
The date belongs to an editorial record, not every individual fact. It does not verify a reviewed contract, legal clearance, current price or unit availability.
Price basis · DiscrepanciesLandmarks around the project, from open maps (OpenStreetMap):
Distances are straight-line from the project, not walking routes — the real route is longer. © OpenStreetMap contributors.
3,990,000–
Primary sale
from 3,990,000 THB
4,990,000 THB
Guides based on published asking prices. Confirm availability and the price of a specific unit before purchase.
Asking rents at other buildings and developments.
45,000 THB /month
70,000 THB /month
The starting amount is the published project price. Adjust the sliders to compare scenarios.
Compare your current inputs with a lower occupancy and higher share of running costs. Set the changes yourself; this is a stress test, not a forecast.
| Year | Gross rent | Running costs | Cumulative net rent | Property value | Total |
|---|
8% potential gross rent, 65% occupancy, 20% running costs and 3% price change are editable examples, not a forecast. Taxes, financing, transaction fees and resale terms are excluded. Occupancy and costs apply to rent, not to the property value.
Enter your own expenses. No market averages are assumed.
Blank fields are unknown, not zero. This is not a full ownership budget: taxes, loan payments, transaction costs and unexpected repairs are excluded unless you include them yourself.
Change rent, occupancy and costs above; public benchmarks are reference points.
The property bar is net rental cash flow divided by purchase price, before tax; it excludes price growth. US Treasury yield is in USD. Inflation shows purchasing-power erosion, not a separate investable return. Risk, taxes, liquidity and currency differ. US CPI source
Under construction. Handover date to be confirmed.
Before reserving, confirm the handover timeline and contract payment terms.
Verified details and questions to settle before reserving.
5 key facts confirmed; 7 more to verify before reserving; checked 2026-10-29.
This is not a project rating.
Tick what describes you — we will show whether this may be a fit. Honest, without gloss.
Your selections are not saved anywhere. This is a decision aid, not an assessment.
Best for: A three-bedroom household that prefers single-storey living and parking for two vehicles, with a meaningful choice between two- and three-bathroom plans.; Owner-occupiers whose daily routines already suit Mae Rim and who are prepared to drive rather than rely on a central, walkable Chiang Mai address.; A larger family seeking a fourth bedroom, a study or more separation between activities; Cottage 3 offers that possibility, subject to its detailed floor plan.; Buyers comfortable evaluating an individual plot and construction contract instead of expecting a finished, standardised condominium transaction.; may not suit: Someone requiring a guaranteed move-in date without reviewing an individual home’s construction status and handover documents.; A foreign national expecting an ordinary, unrestricted personal freehold title to both the house and its Thai land plot.; Residents whose lifestyle depends on walking to most destinations in central Chiang Mai and who do not intend to drive.; Buy-to-let investors looking for an evidenced short-stay operating permission or a guaranteed rental yield; neither has been established here..
A short, project-specific list. We request these from the developer and go through them with you before any payment.
This keeps the open points in one place. A missing or disputed fact is not treated as a conclusion.
From 3,990,000 THB — Basis requires confirmation · confirm the date of a current quotation. The price and availability of a specific unit are confirmed with the developer before reservation.

Mark Erometskiy
Thailand property expert (Pattaya, Phuket and Bangkok), co-founder of Bomi Home. Will help with the unit, ownership, stage and terms before you decide.
Ask about Donkaew Village 19 →Send the project name, a link or a written offer. We can match the exact property, seller, title route, stage and current unit terms before you decide.
Informational, not a public offer or personal investment, legal or tax advice. Price, availability, payment terms and guaranteed-return/buyback conditions are confirmed per unit with the developer and their contract.