3 bedrooms
6,700,000 THB
Habitat Wongwaen – Sankamphaeng is a low-rise housing development east of Chiang Mai, designed around detached family homes and shared estate facilities.
Chiang Mai

From 4,930,000 THBBasis requires confirmation · confirm the date of a current quotation. Current price list, layouts and availability — discussed one-to-one with a project specialist
Photographs from the project’s materials.
Brand ≠ the legal entity signing your contract. This project may use a separate project company or joint venture — verify the seller and developer for the selected unit.
The documented site mix includes standalone homes, townhomes and a small commercial element near the frontage. That makes the master plan and the position of the selected plot more informative than a headline unit count.
The published three- to five-bedroom designs cover notably different amounts of living space and bathrooms. A buyer can compare how a home would work for children, guests or remote work rather than selecting on square metres alone.
Corporate filings connect the earlier Ornsirin 8 name, a named development subsidiary and subsequent housing operations. This is stronger identity evidence than a copied portal description, while remaining no substitute for parcel-level due diligence.
Pool, gym, park and guarded access are marketed as community facilities. Their long-term value depends in part on the rules, funding and quality of maintenance, none of which follows automatically from a facilities list.
Historical financing disclosures include mortgages over development land and procedures for releasing individual parcels. The live title status must be established for the actual house, not inferred from the annual report.
Habitat Wongwaen – Sankamphaeng is a low-rise housing development east of Chiang Mai, designed around detached family homes and shared estate facilities. It should not be assessed like a city-centre condominium or a hotel-managed investment product. The appeal lies in having a house, a separate plot and domestic space that can accommodate changing family needs. That extra autonomy also comes with obligations: upkeep of the building and land, shared community charges, and a more involved title review. A buyer comparing it with an apartment is therefore comparing two very different ways of living and holding property.
The address is more precise than the marketing name suggests. The developer’s 2023 annual report identifies Moo 8, San Pu Loei subdistrict, Doi Saket district, Chiang Mai province, postcode 50220. Sankamphaeng forms part of the project name; it is not proof that the houses fall within San Kamphaeng district. For a family relocating to Chiang Mai, this distinction matters because daily journeys are shaped by the actual access road and junctions rather than the wording of a listing. The location offers an outer-ring-road context, not a walkable Old City neighbourhood.
Ornsirin’s corporate documents provide an unusually useful identity trail. The development previously carried the working name Ornsirin 8, and the 2023 report attributes it to Ornsirin Property Company Limited. This is the project developer identified in that filing, distinct from the wider Ornsirin brand. The 2025 report continues to discuss Habitat Wongwaen – San Kamphaeng in the group’s housing operations. That evidence helps distinguish it from other Habitat properties and from Belive Wongwaen – Sankampang, which appears as a separate development in the group’s own project directory. Similar geography and ownership do not turn two estates into one.
What is being developed also needs careful description. The original programme comprises 269 detached houses, 33 townhomes and four commercial premises positioned toward the front of the estate. Together these account for the 306 units shown by broad project portals. A website counting only detached houses may say 269, without necessarily being wrong. The four commercial units were described as being under design in the 2023 filing; that document cannot establish whether all four have since been built or occupied. The distinction matters when a buyer imagines the traffic, activity and services around the front of the community.
The reported landholding for the project is 84 rai plus 22.5 square wah. This describes the estate as a whole rather than the size of an individual home’s lot. In the earlier corporate schedule, detached-house land allocations vary considerably, so choosing a design does not tell a buyer how much garden, setback or outdoor privacy comes with a particular property. A plot on a quiet internal street will not necessarily feel the same as a plot close to the gate or community facilities. The sales plan and plot-specific survey are more meaningful here than the average impression created by a brochure.
House design is one of the stronger documented aspects of the project. Ornsirin currently publishes both a newer range and its first-phase house plans. The designs are two storeys, with three-, four- and five-bedroom options. The smallest newer house shown is 115 square metres, while the larger established plans reach 268 square metres. These figures describe architectural models, not live stock availability. Buyers should resist treating a published floor plan as an available property or assuming that every house of a named design sits on an identical parcel.
For many households, how the space is distributed will matter more than the headline floor area. A three-bedroom plan can offer a dedicated room for remote work, but the usefulness of that room depends on its dimensions and the family’s schedule. Larger four- and five-bedroom houses may better suit extended families or frequent guests, with the trade-off of more maintenance and furnishing costs. Across the range, bathroom counts vary even where bedroom counts match. Anyone planning for older relatives should inspect what is on the ground floor rather than assuming a large two-storey house is automatically suitable for reduced mobility.
The developer advertises a shared swimming pool, fitness room, clubhouse, central park and a security gate with CCTV coverage. These are estate amenities; the marketing material does not demonstrate that a private pool belongs to each house. The 2025 corporate report also describes solar-powered lighting in the park and rooftop solar equipment at the clubhouse. These installations are a relevant operational detail, but they do not establish lower electricity costs for an individual homeowner or a particular service-charge budget.
Transport is a practical compromise. Ornsirin promotes driving access to shopping destinations, educational institutions, hospitals and the airport, yet published travel-time figures are estimates rather than a reliable prediction for school runs or peak-hour commuting. The estate makes more intuitive sense for someone who is comfortable relying on a car and wants a residential base outside the central bustle. A person hoping to walk to most cafés, services or work destinations should test the actual route before concluding that the broader Chiang Mai label meets their needs.
This is not a development that exists only in future renders. Corporate accounts connect Habitat Wongwaen – San Kamphaeng to housing revenue in 2025, and project-specific insurance records refer to building works on identified plots during that year. Neither fact proves that every planned home is finished or handed over. Third-party portals sometimes describe a ten-month made-to-order timeline. That label is not a signed completion promise, and a buyer should distinguish a resale home with an existing occupant from a new house whose handover date remains contractual.
Pricing requires similar care. On 7 November 2026, the developer’s website displayed an advertised starting figure of THB 4.93 million. It did not specify the date or complete eligibility terms for that offer. Listings on independent marketplaces show different asking prices for individual properties, some of which may be resales. Those amounts should not be collapsed into one official developer price range. A usable comparison needs the exact model, plot area, construction and furnishing condition, the identity of the seller, transfer expenses and any unpaid community fees. An asking price is not a completed sale.
For an overseas buyer, the legal issue is fundamental: ownership of a house and ownership of Thai land are not automatically the same thing. Foreign individuals generally face significant restrictions on direct land ownership, with only narrow statutory exceptions subject to specific approvals. The foreign ownership quota for registered condominium units does not solve a house-and-land transaction. If a seller proposes a registered land lease, rights in a building or another permitted arrangement, the relevant contract and registration documents must establish exactly what rights are created, for how long and on what terms they can be transferred or terminated. Public project descriptions do not establish a universal foreign-buyer structure for these lots.
There is a particularly concrete title question in the group’s 2025 annual report. It records facilities secured against land-title documents associated with the development and describes release of mortgage security as individual houses and plots are sold. That is a historical corporate disclosure as of 31 December 2025, not evidence that any particular home remains mortgaged today. It nonetheless explains why a buyer should insist on a current Land Office check and a clear, document-backed discharge process for the exact parcel being acquired, rather than relying solely on a sales assurance.
Living costs extend well beyond the purchase contract. Maintaining estate roads, the pool, green areas and security requires a functioning management arrangement. We could not verify a current community-fee schedule, detailed ownership of common areas or a project-specific set of rental rules in accessible public materials. Those gaps matter both to an owner-occupier and to someone evaluating long-term rental income. Online rental advertisements show that some properties are marketed to tenants; they do not demonstrate occupancy, net returns or permission for nightly stays. A credible financial model must use actual costs and the rules applying to the selected home.
Habitat Wongwaen – Sankamphaeng is most intelligible as a choice of a specific house within an established, multi-phase suburban estate. The available official information is sufficiently detailed to compare genuine plans, identify the developer and understand the mixed site programme. It does not eliminate the decisions that depend on an individual land title, sale contract or inspection. Before comparing this home with another Chiang Mai development, establish which phase and plot are in question, whether the building exists, how the purchase can legally be structured for the buyer, and what the property will cost to operate. That produces a more useful answer than a generic investment label.
A newer plan with three bedrooms in a relatively compact footprint; inspect actual room sizes and storage before assuming it will suit a larger household.
An earlier-phase design whose main bedroom is advertised with a balcony and walk-in wardrobe; publication of the plan does not establish current stock.
A four-bedroom format that could accommodate a separate study or guest room; garden size and fit-out will still be specific to the listed property.
The developer describes a ground-floor bedroom, a potentially useful feature for multi-generational living; accessibility still depends on the actual layout.
A roomier four-bedroom layout with five bathrooms, better judged by household requirements and upkeep than by floor area alone.
Among the largest models on the published plan list; useful for comparing multi-generational needs, subject to the specific plot and living-space arrangement.
The developer’s 2023 filing describes 33 townhomes near the frontage. Current designs, legal title and availability cannot be inferred from that historical schedule.
These are documented house types, not a live inventory dated 7 November 2026. Built area should not be confused with land area, and older plans may differ from newer phases. Pricing, plot size, handover status and fit-out require a unit-specific offer; the planned commercial units are not being represented as housing.
Each option includes a factual reason for the comparison. Price and availability are confirmed for the selected unit.

Same property type and a close price anchor

Same city and property type; a different area

Alternative project in the same city

Alternative project in the same city
7 amenities
Address / landmarkMoo 8 · San Pu Loei · Doi Saket · Chiang Mai · Thailand · 50220
The map loads from OpenStreetMap on request.
The circle shows the project’s approximate location; we confirm the exact address and the plot boundaries when you get in touch. © OpenStreetMap contributors.
Landmarks around the project, from open maps (OpenStreetMap):
Distances are straight-line from the project, not walking routes — the real route is longer. © OpenStreetMap contributors.
The closest mapped place in each available category.
7-Eleven
Pharma Choice
Ban Pa Sao School
OpenStreetMap · straight-line distances from the mapped project area, not walking routes.
Choose what matters to you and a comfortable radius. A mapped place is not proof of a walkable route.
OpenStreetMap · straight-line distances from the mapped project area, not travel time. “Not mapped” does not mean the place does not exist; verify the actual route and crossing.
Temperature, rain, sun and wind month by month for the surrounding area.
NASA POWER · 2001–2025 · area-wide climate averages, not a daily forecast. Rain bars show mm/day. Sun line is solar energy, not a count of sunny days.
Select the months you expect to stay to compare their long-run climate averages.
Select one or more months.
Climate: NASA POWER, 2001–2025 area averages; solar energy is not sunny-day count. Tourism: observed months for Chiang Mai province, not seasonal norms or this property’s rental occupancy.
Compare nearby arrival points before choosing a route.
Distances are straight-line from the mapped project area, not driving distances or travel times. Airport positions are reference points; the transport stop is from OpenStreetMap.
Chiang Mai province · September 2026
Foreign visitors and hotel room occupancy in the province
Selected visitor-friendly places within 5 km
Thailand Ministry of Tourism and Sports · Ministry of Tourism and Sports · preliminary monthly province figures, not this property’s rental occupancy. Nearby counts are selected OpenStreetMap places, not measured foot traffic.
Thailand · published price index, historical data
2015-01 — 2026-08 · Bank of Thailand · 2011=100. Regional housing index, not villa transaction prices or this project’s return.
Published sale-price references within 5 km, not rental listings or confirmed availability.
Compare the project with nearby alternatives
Approximate project locations and straight-line distances. Sale prices cannot be treated as comparable rent.
A short route from daily-life questions to market evidence. Selected for this project’s location and stage; these pages do not verify the project itself.
Build your scenario from the published facts and your choices on this page. Not a rating or a return promise.
Choose a goal; your selections in the widgets below will appear in the summary.
No conditions selected yet. Select the relevant criteria and nearby places in the widgets below.
Prepare a request around published unknowns and your conditions. Nothing is sent automatically.
The date belongs to an editorial record, not every individual fact. It does not verify a reviewed contract, legal clearance, current price or unit availability.
Price basis · Discrepancies6,700,000 THB
6,800,000–
Primary sale
4,930,000–
Guides based on published asking prices. Confirm availability and the price of a specific unit before purchase.
· Long-term asking rents. Yearly quotes are shown as monthly equivalents. Confirm availability.
21,000 THB /month
80,000 THB /month
The starting amount is the published project price. Adjust the sliders to compare scenarios.
Compare your current inputs with a lower occupancy and higher share of running costs. Set the changes yourself; this is a stress test, not a forecast.
| Year | Gross rent | Running costs | Cumulative net rent | Property value | Total |
|---|
8% potential gross rent, 65% occupancy, 20% running costs and 3% price change are editable examples, not a forecast. Taxes, financing, transaction fees and resale terms are excluded. Occupancy and costs apply to rent, not to the property value.
Enter your own expenses. No market averages are assumed.
Blank fields are unknown, not zero. This is not a full ownership budget: taxes, loan payments, transaction costs and unexpected repairs are excluded unless you include them yourself.
Change rent, occupancy and costs above; public benchmarks are reference points.
The property bar is net rental cash flow divided by purchase price, before tax; it excludes price growth. US Treasury yield is in USD. Inflation shows purchasing-power erosion, not a separate investable return. Risk, taxes, liquidity and currency differ. US CPI source
Verified details and questions to settle before reserving.
5 key facts confirmed; 7 more to verify before reserving; checked 2026-10-27.
This is not a project rating.
Tick what describes you — we will show whether this may be a fit. Honest, without gloss.
Your selections are not saved anywhere. This is a decision aid, not an assessment.
Best for: Households seeking a private, low-rise home rather than an apartment, with documented options ranging from three to five bedrooms and access to estate amenities.; Car-owning residents who value a suburban base and can organise commuting, school transport and shopping around the outer-ring-road location.; Extended families willing to compare ground-floor accommodation, bathroom arrangements and plot placement across the developer’s different plans.; Buyers who appreciate traceable corporate project history and are prepared to carry out proper plot, contract and title checks before committing.; may not suit: Foreign purchasers looking for the familiar condominium foreign-quota route; a house-and-land product requires a fundamentally different legal assessment.; Residents who expect a central, largely walkable lifestyle without relying on private transport.; Yield-driven buyers who require a documented rental guarantee, unrestricted short stays or known annual service costs before reviewing the actual estate rules.; Anyone needing an immediate move-in date without first distinguishing existing resale stock from newly built or made-to-order properties..
A short, project-specific list. We request these from the developer and go through them with you before any payment.
This keeps the open points in one place. A missing or disputed fact is not treated as a conclusion.
From 4,930,000 THB — Basis requires confirmation · confirm the date of a current quotation. The price and availability of a specific unit are confirmed with the developer before reservation.

Mark Erometskiy
Thailand property expert (Pattaya, Phuket and Bangkok), co-founder of Bomi Home. Will help with the unit, ownership, stage and terms before you decide.
Ask about Habitat Wongwaen – Sankamphaeng →Send the project name, a link or a written offer. We can match the exact property, seller, title route, stage and current unit terms before you decide.
Informational, not a public offer or personal investment, legal or tax advice. Price, availability, payment terms and guaranteed-return/buyback conditions are confirmed per unit with the developer and their contract.