Completion, handover and title issuance

Construction completion, technical inspection, key handover and title registration are separate events. They may occur on different dates and trigger different consequences: final payment, transfer of risk, service charge, warranty periods and the ability to dispose of the unit.

Nova Asia AI assistant

Let’s explore this page together

Four dates rather than one

Completion usually means that the developer considers building work complete under a contractual test. Evidence may be a certificate, notice, consultant statement or another document identified in the SPA. The word “completed” does not by itself prove that the buyer has inspected the unit, common areas are ready or all approvals for use exist.

Handover is the unit-specific process: inspection, defect list, acceptance document, keys, access cards, meter readings and physical control. A buyer may be offered possession before all common areas are finished or before a separate title is issued. That sequence may occur in practice, but its legal consequences must come from the contract rather than the possession of keys.

Title issuance and registration are cadastral events recording the private-unit right. The foreign-ownership law makes registration necessary for an agreed transfer of special co-ownership [1]. A paid-up unit and keys do not give a foreign buyer the same position as registered ownership. An occupancy certificate is another distinct instrument: the Construction Law defines it as permission to use, lease or conduct business with a construction [2].

Dates that should not be collapsed

A marketed delivery date is often not the contractual completion date. The advertised date may be indicative while the SPA adds a grace period and a long-stop date. Buyer remedies depend on the contractual structure.

A unit acceptance form is not an occupancy certificate, and neither is a strata title. The first records the buyer-seller handover of a particular unit; the second concerns permitted use of the building; the third records a property right.

Delivery of keys does not automatically determine transfer of risk, service-charge liability or commencement of warranties. Those consequences may attach to a notice, deemed handover, physical access, signature or another event. Every trigger should be extracted from the SPA into one table.

What to check before final payment

Create a chronology schedule covering the advertised date, contractual completion, grace period, long-stop, readiness notice, inspection, rectification, handover, occupancy certificate, title filing and actual registration. For each event identify evidence, responsible party and consequence.

Identify the trigger for final payment. If a unilateral developer notice is enough, the buyer may have to pay before independent inspection or registration readiness. A more controlled structure connects a large balance with verifiable documents, unit access and an agreed defect mechanism.

Before signing acceptance, record unit condition, incomplete common areas, keys, meters, furniture, parking and promised documents. Where title will follow later, the SPA needs a separate deadline, developer action list, cooperation duty, cost allocation and remedy for delay.

Where the risk gap appears

The most serious gap is full payment and key delivery with no reliable registration date. The buyer bears costs and controls the unit physically but remains a creditor under a promise to register title. The longer the gap, the more important retention, security and a defined process become.

A second risk is deemed handover. The SPA may treat the unit as accepted if the buyer fails to attend or sign within a short period. This matters particularly for an overseas buyer: notices, power of attorney, rescheduling rights and valid objections need clear rules.

A third risk is early service charge while shared facilities remain incomplete. Determine whether charges begin on key delivery, notice, occupation or commencement of management and whether adjustment exists where the pool, lifts or other services are not operating.

Documents to check

What this does not prove

Documents to check

Use this checklist for the exact property, parties, documents and transaction date.

GO / STOP tracker0 of 5

What this does not prove

Do not treat the term or document as proof of the following points without separate evidence.

Nothing ticked yet — you are just reading.

Frequently asked questions

Do keys mean the unit is legally mine?

No. Keys evidence physical access, while registered ownership requires a separate process.

When does the warranty start?

Check the relevant warranty and SPA. The Construction Law links statutory construction-contract periods to handover of the construction, but the buyer must confirm applicability and the operative date for the claim.

Related terms

Related NovAsia pages

Sources2
  1. [1] Law on Providing Foreigners with Ownership Rights in Private Units of Co-Owned Buildings, articles 4–15 — Kingdom of Cambodia — 24.05.2010
  2. [2] Law on Construction — Kingdom of Cambodia — 02.11.2019

Sources are printed as text only. We do not publish outbound links.

Glossary material for orientation only. It is not legal, tax or investment advice; check a real transaction with a Cambodian lawyer.