1 bedroom
1,990,000–
Le Chamonix occupies a site off Mahidol Road in Pa Daet, in the southern part of Chiang Mai’s main district.
Chiang Mai

From 2,100,000 THBBasis requires confirmation · confirm the date of a current quotation. Current price list, layouts and availability — discussed one-to-one with a project specialist
Photographs from the project’s materials.
Developer material from 2025 describes the development as finished and ready for residents, and resale stock is being advertised. That allows buyers to see how the buildings and common spaces have aged rather than assessing only future promises. Completion of the development should still be separated from the registered status and condition of the apartment being offered.
Both phases appear in the developer’s own history, and published phase records differ in building counts and dates. A buyer gains little from an impressive specification that belongs to another section of the site. The relevant evidence should identify the exact building, its common facilities and its registration documents.
The official plans include one-bedroom apartments around 30 square metres and two-bedroom options close to 50 square metres. That difference can change whether a home accommodates a separate workplace, a child or a long-term guest. Buyers should also look past bedroom labels: two advertised two-bedroom designs have different numbers of bathrooms.
The project was promoted with voice controls, connected devices and electronic locks. These are useful when they still work and can be transferred to a new owner. Before attributing a premium to the technology, an inspection should establish which devices remain, whether the software is supported and who pays when something fails.
ONEP’s project records name Luxury Chiang Mai Land Company Limited as the project owner and show an approved environmental assessment. That is stronger evidence of project identity than an anonymous broker listing. It does not, however, certify a unit’s title, the terms of a resale contract or the availability of foreign-ownership quota.
Le Chamonix occupies a site off Mahidol Road in Pa Daet, in the southern part of Chiang Mai’s main district. Its appeal is quite tangible: low-rise apartment buildings, pools and landscaped communal areas, and homes sized for one person, a couple or a small household. A buyer can walk through an actual building rather than relying on construction imagery. That makes the inspection more useful, not less necessary. The floor, immediate neighbours, condition of the common areas and route to the places you visit each week may matter far more than the finishes in a sales brochure.
The name covers two marketed phases, not one building built on a single day. The developer distinguishes Le Chamonix Condotel from Le Chamonix Condo. Phase 2 was publicly launched in January 2024, while a developer post in July 2025 said the development was finished and ready for occupation. Lazudi separately describes the second phase as completed in 2025. Meanwhile, several consolidated project databases still give December 2021 as the project completion date. Those dates may refer to different stages of the development. For a particular apartment, the relevant dates are the completion and registration history of its own building, plus the actual handover and ownership records.
Published unit counts deserve more attention than a standard project profile suggests. FazWaz and Dot Property describe 276 units in seven four-storey buildings. Lazudi splits the phases into 130 and 146 units, but lists four buildings for each phase. A contemporary developer announcement instead described the earlier phase as three buildings containing more than 118 units. Thailand’s ONEP database also holds an approved environmental impact assessment for Le Chamonix. The accompanying approval letter, as extracted from its public PDF, refers to 284 rooms with a breakdown of 266 residential and eight commercial rooms; even that breakdown does not add up to the stated total. It would be misleading to present any one of these counts as the definitive number of registered apartments without examining the approved and as-built schedules.
The developer is identifiable. LC Land is the operating brand associated with Luxury Chiang Mai Land Company Limited, which the official environmental assessment database names as the project owner. That database also gives the Thai company registration number, 0505562003185. The developer’s own company history describes Golden Selection Real Estate Company Limited as the main sales representative, rather than the builder. This distinction becomes relevant as soon as money changes hands: a resale owner, an estate agent, the project company and the condominium juristic person can all be involved, but they do not acquire the same contractual responsibilities simply by using the Le Chamonix name.
The project publishes its location as 191, Soi Chao Mae Kuan Im, Mahidol Road, Pa Daet, Mueang Chiang Mai, Chiang Mai 50100. It is convenient to describe the property as being near Chiang Mai International Airport, but proximity is not the same thing as a reliable journey time. Anyone working in another part of town should test that trip at the hours they normally travel. The small access road, building orientation and local traffic are also worth seeing firsthand. Pa Daet is not the old walled city or Nimman, and an apartment should not be chosen on the assumption that every popular Chiang Mai district is equally close.
A four-storey layout gives Le Chamonix a different feel from a single tall residential tower. The developer shows extensive water features, landscaped areas, a fitness space and controlled access with security cameras. Project directories also describe shared work or meeting areas and a lounge; promotional material for Phase 2 mentions a clubhouse, sauna and wellness facilities. These are meaningful amenities if they are well maintained and residents can actually use them. An impressive common-area photograph, however, says little about how busy a pool becomes, whether the equipment is operational or which building’s owners pay for its upkeep.
The official floor-plan selection is more varied than the familiar thirty-square-metre one-bedroom apartment. One-bedroom options are illustrated at 29.8 and 34.3 square metres, with an additional 47.06-square-metre one-bedroom layout. Two-bedroom designs are shown at approximately 49.1 and 50.6 square metres, with different bathroom arrangements. Such plans describe advertised designs, not an inventory of homes available today. In a resale purchase, ask for the plan attached to the specific title and compare it with the apartment as it stands, including any changes to internal walls, fitted furniture or access to outside space.
Smart-home equipment is part of the development’s identity. The builder promoted app and voice controls for items such as lighting, curtains and air-conditioning, together with electronic locks and environmental sensors. Those claims explain the original product concept, but they are not a warranty that every device works in an older resale unit. Ownership of installed equipment, compatibility with a new resident’s accounts and the availability of technical support should be understood before treating technology as an extra asset. A conventional apartment with reliable systems can be preferable to a more elaborate setup that no one can maintain.
At the time of this review, FazWaz was advertising a 29.8-square-metre one-bedroom unit at THB 2.1 million and showed listings carrying both Thai-quota and foreign-quota labels. This is useful evidence of asking prices, not proof of a fresh developer release or a transferable foreign-title unit. Listings may be withdrawn, duplicated or repriced. Nor is the cheapest listing automatically comparable with a larger home or a pool-access apartment. The total amount payable depends on the seller’s contract, registered rights, transfer costs, furniture and any outstanding common-area charges.
Foreign condominium ownership in Thailand is possible within the statutory framework for registered condominium buildings. The usual foreign-ownership ceiling is tied to 49% of the aggregate unit area, subject to the current legal rules and the eligibility of the buyer. A listing marked “Foreign Quota” is not the document that settles this. The exact unit title, registration status of the building, current foreign quota certificate and evidence of the purchase funds have not been examined for this dossier. Importantly, an approved EIA addresses environmental assessment; it is not interchangeable with a condominium title deed or permission to sell a particular unit to a foreign individual.
Running costs can look modest next to the purchase price, yet the details matter. FazWaz lists a common-area fee of THB 45 per square metre per month and a sinking-fund contribution of THB 500 per square metre. These figures should be treated as published project information, not as a current statement from the condominium’s management. Existing buildings can revise budgets and payment procedures. The same source describes a no-pets policy and a parking allocation equal to roughly a quarter of the unit count. Both points need current confirmation through the building rules, especially for residents who rely on a car or plan to move in with animals.
The rental case is more straightforward when it starts with a real unit and a realistic tenant profile. Long-stay residents may value an airport-side address, a managed compound and access to a pool or shared work area. Whether they will pay enough to cover an owner’s full expenses is another question. Advertised rents and an aggregator’s yield calculation cannot establish occupancy, repairs, tax or net returns. Nor does the developer’s historic reference to a rental programme prove that an enforceable arrangement is available today. Short stays involve separate building rules and, where applicable, hotel and licensing requirements; an online holiday-rental advert is not permission in itself.
Le Chamonix offers the advantage of being observable: prospective buyers can inspect the actual apartments, common facilities and neighbourhood. It also illustrates why a finished building can still require careful document work. The differing counts and completion dates point to a need for phase-by-phase records rather than a blanket assumption that every listing refers to the same legal inventory. The sensible question is not simply whether the development looks attractive, but whether a particular apartment offers the space, ownership rights, maintenance obligations and daily-life fit that its asking price implies.
One of the smallest plans shown by the developer. Kitchen placement, storage and the separation of the bedroom shape how comfortable it feels; the plan alone says nothing about the current stock.
A roomier single-bedroom format. Its value over a smaller unit depends on the actual room proportions and usable storage, not merely the published area difference.
The developer also displays a larger one-bedroom layout. Its configuration and phase should be checked against the floor plan and title of any actual unit being sold.
Two bedrooms and two bathrooms in a relatively compact footprint. This can help households with different routines, although room dimensions and furnishing constraints still need an individual review.
A second two-bedroom plan with just one bathroom. For a family or shared household, that compromise may matter more than the small increase in total floor area.
These are developer-published layouts, not a live availability schedule. The assignment of each plan to a specific phase and the present resale inventory have not been independently established. Obtain the actual unit plan and title before relying on any dimensions.
Each option includes a factual reason for the comparison. Price and availability are confirmed for the selected unit.

Same property type and a close price anchor

Same property type and a close price anchor

Same property type and a close price anchor

Same property type and a close price anchor
9 amenities
Address / landmark191 Moo 13, Soi Chao Mae Kuan Im, Mahidol Road, Pa Daet, Mueang Chiang Mai, Chiang Mai 50100, Thailand
The map loads from OpenStreetMap on request.
The circle shows the project’s approximate location; we confirm the exact address and the plot boundaries when you get in touch. © OpenStreetMap contributors.
Landmarks around the project, from open maps (OpenStreetMap):
Distances are straight-line from the project, not walking routes — the real route is longer. © OpenStreetMap contributors.
The closest mapped place in each available category.
7-Eleven
Free Medical Clinic
Pimandek Chiangmai School
G's Park
OpenStreetMap · straight-line distances from the mapped project area, not walking routes.
Choose what matters to you and a comfortable radius. A mapped place is not proof of a walkable route.
OpenStreetMap · straight-line distances from the mapped project area, not travel time. “Not mapped” does not mean the place does not exist; verify the actual route and crossing.
Temperature, rain, sun and wind month by month for the surrounding area.
NASA POWER · 2001–2025 · area-wide climate averages, not a daily forecast. Rain bars show mm/day. Sun line is solar energy, not a count of sunny days.
Select the months you expect to stay to compare their long-run climate averages.
Select one or more months.
Climate: NASA POWER, 2001–2025 area averages; solar energy is not sunny-day count. Tourism: observed months for Chiang Mai province, not seasonal norms or this property’s rental occupancy.
Compare nearby arrival points before choosing a route.
Distances are straight-line from the mapped project area, not driving distances or travel times. Airport positions are reference points; the transport stop is from OpenStreetMap.
Chiang Mai province · September 2026
Foreign visitors and hotel room occupancy in the province
Selected visitor-friendly places within 5 km
Thailand Ministry of Tourism and Sports · Ministry of Tourism and Sports · preliminary monthly province figures, not this property’s rental occupancy. Nearby counts are selected OpenStreetMap places, not measured foot traffic.
Thailand · published price index, historical data
2015-01 — 2026-08 · Bank of Thailand · 2011=100. Regional housing index, not villa transaction prices or this project’s return.
Published sale-price references within 5 km, not rental listings or confirmed availability.
Compare the project with nearby alternatives
Approximate project locations and straight-line distances. Sale prices cannot be treated as comparable rent.
A short route from daily-life questions to market evidence. Selected for this project’s location and stage; these pages do not verify the project itself.
Build your scenario from the published facts and your choices on this page. Not a rating or a return promise.
Choose a goal; your selections in the widgets below will appear in the summary.
No conditions selected yet. Start with fit criteria, everyday places or the months you plan to stay.
Prepare a request around published unknowns and your conditions. Nothing is sent automatically.
The date belongs to an editorial record, not every individual fact. It does not verify a reviewed contract, legal clearance, current price or unit availability.
Price basis · Discrepancies1,990,000–
3,790,000–
Guides based on published asking prices. Confirm availability and the price of a specific unit before purchase.
Matched by property type, bedrooms, size, stage and known transaction terms. Each development counts once in the median.
· Long-term asking rents. Yearly quotes are shown as monthly equivalents. Confirm availability.
17,000–
25,000–
Annual rent ÷ purchase price × 100. Published figures are matched within the development by property type, bedrooms and size within 15%. Costs, taxes and vacancy are excluded.
10.86%
The starting amount is the published project price. Adjust the sliders to compare scenarios.
Compare your current inputs with a lower occupancy and higher share of running costs. Set the changes yourself; this is a stress test, not a forecast.
| Year | Gross rent | Running costs | Cumulative net rent | Property value | Total |
|---|
8% potential gross rent, 65% occupancy, 20% running costs and 3% price change are editable examples, not a forecast. Taxes, financing, transaction fees and resale terms are excluded. Occupancy and costs apply to rent, not to the property value.
Enter your own expenses. No market averages are assumed.
Blank fields are unknown, not zero. This is not a full ownership budget: taxes, loan payments, transaction costs and unexpected repairs are excluded unless you include them yourself.
Change rent, occupancy and costs above; public benchmarks are reference points.
The property bar is net rental cash flow divided by purchase price, before tax; it excludes price growth. US Treasury yield is in USD. Inflation shows purchasing-power erosion, not a separate investable return. Risk, taxes, liquidity and currency differ. US CPI source
Completed. Not a render.
Completion year to be confirmed, but the building is up — view it in person.
Verified details and questions to settle before reserving.
6 key facts confirmed; 7 more to verify before reserving; checked 2026-11-09.
This is not a project rating.
Tick what describes you — we will show whether this may be a fit. Honest, without gloss.
Your selections are not saved anywhere. This is a decision aid, not an assessment.
Best for: A single resident or couple looking for a completed, manageable one-bedroom home with access to a pool and gym, provided the location supports their normal week.; Buyers who prefer inspecting an operating residential compound to making an off-plan commitment. The real condition of facilities, common spaces and a particular unit can be compared in person.; A small household that can make good use of two bedrooms in roughly 50 square metres. The different bathroom arrangements are worth weighing before settling on a plan.; An owner considering conventional long-term letting and willing to model vacancy, repairs, management, fees and taxes without assuming that an advertised rental programme is a guaranteed income product.; may not suit: Someone who wants the Old City or Nimman to be immediately walkable. The Pa Daet address creates a different daily commute, regardless of the project’s broad “central Chiang Mai” marketing.; A buyer whose business plan depends on unrestricted nightly rentals. Online holiday listings do not establish that the building permits that use or that any required operating permissions exist.; Anyone moving with pets without first obtaining the current juristic-person rules in writing; public project information says animals are generally restricted.; A purchaser who needs an assured foreign-quota unit or an all-in fixed price before reviewing documents. The market listing label and the quoted entry price are not substitutes for those checks..
A short, project-specific list. We request these from the developer and go through them with you before any payment.
This keeps the open points in one place. A missing or disputed fact is not treated as a conclusion.
From 2,100,000 THB — Basis requires confirmation · confirm the date of a current quotation. The price and availability of a specific unit are confirmed with the developer before reservation.

Mark Erometskiy
Thailand property expert (Pattaya, Phuket and Bangkok), co-founder of Bomi Home. Will help with the unit, ownership, stage and terms before you decide.
Ask about Le Chamonix →Send the project name, a link or a written offer. We can match the exact property, seller, title route, stage and current unit terms before you decide.
Informational, not a public offer or personal investment, legal or tax advice. Price, availability, payment terms and guaranteed-return/buyback conditions are confirmed per unit with the developer and their contract.