3 bedrooms
Freehold
26,000,000–
The Escape Mahidol is a collection of detached pool homes in Pa Daet, on the southern side of Chiang Mai.
Chiang Mai

From 23,800,000 THBBasis requires confirmation · confirm the date of a current quotation. Current price list, layouts and availability — discussed one-to-one with a project specialist
Photographs from the project’s materials.
Brand ≠ the legal entity signing your contract. This project may use a separate project company or joint venture — verify the seller and developer for the selected unit.
Ornsirin’s published filings establish the planned estate size at 21 detached houses. Some aggregator pages show only four, which is too narrow a basis for judging the future neighbourhood or the amount of development that might still be outstanding.
The location and house concept bring together a personal swimming area and access to Chiang Mai’s urban services. The same combination means buyers should budget for private pool upkeep and investigate the actual road entrance rather than assume brochure travel times.
Two three-bedroom models appear on the current developer page, while a larger four-bedroom design was publicised at launch. Secondary living spaces and extra rooms may change how well a home works for a family, but availability and the final specification are house-specific.
The developer’s 2025 project schedule still reported 17 plots in the development-or-construction category. Buyers need an individual handover position and a clear view of nearby works, even when the house they tour is already occupied or furnished.
The developer subsidiary is identified in annual reporting, and the report separately references project title deeds in banking security disclosures. Neither fact substitutes for checking the seller, registered landowner and title conditions of the chosen plot.
The Escape Mahidol is a collection of detached pool homes in Pa Daet, on the southern side of Chiang Mai. Its appeal is straightforward: a private house, its own outdoor swimming space, room for cars and access to the city rather than an apartment in a high-rise. The project is marketed by Ornsirin and is distinct from the group’s other developments carrying the Mahidol name. Buyers will encounter conflicting descriptions online, however. Several international property directories call it a completed four-unit project, while the developer group’s annual filings identify a 21-house development. The latter is the stronger evidence for the full scheme. A small number in a brokerage database should not be mistaken for the total number of plots or proof that the entire estate has been finished.
Location may be the first reason to consider this address. Mahidol Road links this part of Chiang Mai to established shopping, hospital and airport routes. Ornsirin’s materials name Central Chiang Mai Airport, Chiang Mai International Airport and several hospitals as nearby destinations. The advertised travel times are marketing estimates, not reliable rush-hour measures. This is an urban-road setting, not a hillside retreat or a walkable old-town apartment district. How pleasant the journey feels will depend on the exact access road, regular driving hours and the position of the home within the estate. Public descriptions establish the Pa Daet area and the Mahidol Road vicinity; they do not resolve traffic noise, entry arrangements or the outlook from every plot.
The development has a documented corporate identity. Ornsirin Holding Public Company Limited is a listed parent company, while its own annual reports identify North Home Company Limited as the project developer. The brand used to market the estate is Ornsirin Group. Those names have different roles: a publicly traded parent, a development subsidiary and a customer-facing property brand are not interchangeable with the party who will sign an individual sale contract. This becomes particularly relevant when the buyer is shown an older completed house through an agent rather than a new build directly offered by the development company. The seller’s authority, the account receiving the purchase money and the registered owner of the land must match the documentary chain for that transaction.
Construction progress is the central unresolved issue. In its 2025 One Report, Ornsirin placed The Escape Mahidol among projects under sale and ownership transfer. The table lists 21 houses in the project, only one cumulative sale and transfer, 20 remaining for sale, and 17 plots under the land-for-development-or-construction heading as at 31 December 2025. These are historical corporate figures, not a live inventory for November 2026, yet they materially contradict the blanket completed label seen on some portals. A finished show home can coexist with undeveloped plots elsewhere within one residential scheme. Any presentation of a particular house should establish whether construction is finished, what services are operational, whether ownership has transferred before, and what building work remains nearby.
Ornsirin’s current project page displays two house designs. The Elegant has a stated usable area of 301 square metres, three bedrooms and four bathrooms. The Executive offers 322 square metres with the same bedroom and bathroom counts. A developer-sourced launch announcement from July 2023 described a third design, The Emperor, with four bedrooms, five bathrooms and about 496 square metres. That model does not appear alongside the other two on the current product page, so it should be treated as part of the documented historical offering rather than a confirmed available unit. The launch information also describes all three designs as three-storey houses with parking for three vehicles. A layout needs to be judged as a sequence of rooms and stairs, not merely as a total area.
These are homes intended to accommodate more than one kind of daily activity. The Elegant was initially described with one living room, while The Executive added a second family room and a maid’s room. The Emperor included a multipurpose room alongside its larger bedroom count. For a household with guests, work-from-home needs or multiple generations, those differences may matter more than the gap between two asking prices. Three floors also introduce a practical compromise: daily movement between sleeping and living spaces will be less effortless than in a single-level house. Prospective residents should look at the actual stairs, bathroom placement, garage access and pool sightlines in the home they are considering.
Private pools are a defining element of the offer rather than a shared clubhouse amenity. The developer also promotes an automatic garage door and a Comfort Air system intended to improve incoming air. Its 2023 launch announcement referred to home automation for lighting and electrical systems, spa-jet pools and electric-vehicle charging points. These are statements about the intended product specification. They do not establish the working condition or inclusion of each item in a resale listing. The group’s 2025 reporting adds a useful detail about rooftop solar: it records a 6.6 kW installation on one Escape Mahidol house and describes a broader installation plan after ownership transfer. A prospective owner cannot infer that every advertised house already has its own solar installation.
The published price picture needs similarly careful reading. Ornsirin’s website advertises a starting point of THB 23.8 million, but the page does not give a date for that commercial offer. Separate DDproperty listings posted or refreshed during September and October 2026 show asking prices around THB 26 million, 29.5 million and 31.49 million. These are seller quotations for identifiable properties, not completed transactions or a market valuation of the whole estate. A furnished house with a particular plot size may be priced differently from a developer’s base specification. A sensible comparison therefore requires the actual plot number, house type, land dimensions, finish level and the taxes or transfer costs to be borne by each party. A headline starting price cannot answer those questions.
International buyers must also separate the house from the land beneath it. Thai rules generally restrict direct land ownership by foreign individuals, subject to limited statutory exceptions. A property advert marked “freehold” does not establish that an overseas purchaser can register the land in their personal name. The legal treatment of a building, a land lease and any other registered rights has to be understood from the specific papers. The condominium foreign-ownership quota is not a workaround for a detached-house estate. At present no examined title documents or draft purchase contract for an identified Escape Mahidol plot substantiate a buyer-specific ownership structure, so none should be promised in the public project description.
One item in the developer’s own financial disclosures makes plot-level checks particularly relevant. The 2025 report lists several title deeds associated with The Escape among the security described for corporate banking facilities. That disclosure is not evidence that every house currently offered for sale has an active mortgage, nor that an encumbrance cannot be discharged at transfer. It is, however, a clear reason not to rely solely on a broker’s assurance of clean title. The relevant title deed, recorded burdens, discharge mechanism and transfer procedure should be confirmed for the exact property being purchased. Public company reporting provides a lead for due diligence; it does not replace the land registry record.
Running costs deserve attention in their own right. A private pool is convenient for residents but requires cleaning, pump maintenance and water treatment. A large, three-storey home also has cooling, electrical and equipment costs that differ from those of a compact condominium. Online portals mention security and CCTV, yet a current schedule of estate fees, service responsibilities and community rules was not established from the inspected materials. Nor is there a verified rental management programme or documented right to use each property for short stays. Without an actual operating budget and evidence of rental demand, a net-yield figure would be speculation rather than a useful guide.
The strongest case for The Escape Mahidol is as a selected home for sustained personal use: a small planned community, private outdoor space and access to Chiang Mai’s urban services. It is less readily comparable with a turnkey, hands-off rental investment. The project’s association with a listed developer is valuable for identifying the businesses involved, but it cannot guarantee a particular house’s construction status, legal condition or eventual resale market. Historic unsold inventory is not the same as a current list of completed units. The decision should be made around an individual house and its documentary position, with the estate’s broader development programme kept in view.
The launch specification describes three levels, one living room and space for three cars. It is the less elaborate of the two designs currently shown by Ornsirin, although the executed plan, pool equipment and sold specification still need to be matched to the chosen home.
Originally presented with two living rooms, an additional staff room and three parking spaces. The extra shared space may suit a household that needs more separation between activities, provided the particular unit retains this layout.
The 2023 launch material described a multipurpose room, a staff room and parking for three cars across three floors. It is documented as an original design, not as a home currently available to purchase.
The 301 sqm and 322 sqm plans remain on the developer’s page as checked on 7 November 2026. The Emperor comes from a dated 2023 launch statement. An older corporate report categorised planned homes differently, so no design name should be treated as a binding specification or current offer without the plot-specific drawings and sale papers.
Each option includes a factual reason for the comparison. Price and availability are confirmed for the selected unit.

Alternative project in the same city

Alternative project in the same city

Alternative project in the same city

Alternative project in the same city
4 amenities
Address / landmarkMahidol Road / Soi Wat Pa Daet, Pa Daet, Mueang Chiang Mai, Chiang Mai 50100, Thailand
The map loads from OpenStreetMap on request.
The circle shows the project’s approximate location; we confirm the exact address and the plot boundaries when you get in touch. © OpenStreetMap contributors.
Landmarks around the project, from open maps (OpenStreetMap):
Distances are straight-line from the project, not walking routes — the real route is longer. © OpenStreetMap contributors.
The closest mapped place in each available category.
7-Eleven
Free Medical Clinic
Pimandek Chiangmai School
G's Park
OpenStreetMap · straight-line distances from the mapped project area, not walking routes.
Choose what matters to you and a comfortable radius. A mapped place is not proof of a walkable route.
OpenStreetMap · straight-line distances from the mapped project area, not travel time. “Not mapped” does not mean the place does not exist; verify the actual route and crossing.
Temperature, rain, sun and wind month by month for the surrounding area.
NASA POWER · 2001–2025 · area-wide climate averages, not a daily forecast. Rain bars show mm/day. Sun line is solar energy, not a count of sunny days.
Select the months you expect to stay to compare their long-run climate averages.
Select one or more months.
Climate: NASA POWER, 2001–2025 area averages; solar energy is not sunny-day count. Tourism: observed months for Chiang Mai province, not seasonal norms or this property’s rental occupancy.
Compare nearby arrival points before choosing a route.
Distances are straight-line from the mapped project area, not driving distances or travel times. Airport positions are reference points; the transport stop is from OpenStreetMap.
Chiang Mai province · September 2026
Foreign visitors and hotel room occupancy in the province
Selected visitor-friendly places within 5 km
Thailand Ministry of Tourism and Sports · Ministry of Tourism and Sports · preliminary monthly province figures, not this property’s rental occupancy. Nearby counts are selected OpenStreetMap places, not measured foot traffic.
Thailand · published price index, historical data
2015-01 — 2026-08 · Bank of Thailand · 2011=100. Regional housing index, not villa transaction prices or this project’s return.
Published sale-price references within 5 km, not rental listings or confirmed availability.
Compare the project with nearby alternatives
Approximate project locations and straight-line distances. Sale prices cannot be treated as comparable rent.
A short route from daily-life questions to market evidence. Selected for this project’s location and stage; these pages do not verify the project itself.
Build your scenario from the published facts and your choices on this page. Not a rating or a return promise.
Choose a goal; your selections in the widgets below will appear in the summary.
No conditions selected yet. Start with fit criteria, everyday places or the months you plan to stay.
Prepare a request around published unknowns and your conditions. Nothing is sent automatically.
The date belongs to an editorial record, not every individual fact. It does not verify a reviewed contract, legal clearance, current price or unit availability.
Price basis · DiscrepanciesFreehold
26,000,000–
Primary sale
23,800,000–
Guides based on published asking prices. Confirm availability and the price of a specific unit before purchase.
Asking rents at other buildings and developments.
70,000 THB /month
75,000 THB /month
The starting amount is the published project price. Adjust the sliders to compare scenarios.
Compare your current inputs with a lower occupancy and higher share of running costs. Set the changes yourself; this is a stress test, not a forecast.
| Year | Gross rent | Running costs | Cumulative net rent | Property value | Total |
|---|
8% potential gross rent, 65% occupancy, 20% running costs and 3% price change are editable examples, not a forecast. Taxes, financing, transaction fees and resale terms are excluded. Occupancy and costs apply to rent, not to the property value.
Enter your own expenses. No market averages are assumed.
Blank fields are unknown, not zero. This is not a full ownership budget: taxes, loan payments, transaction costs and unexpected repairs are excluded unless you include them yourself.
Change rent, occupancy and costs above; public benchmarks are reference points.
The property bar is net rental cash flow divided by purchase price, before tax; it excludes price growth. US Treasury yield is in USD. Inflation shows purchasing-power erosion, not a separate investable return. Risk, taxes, liquidity and currency differ. US CPI source
Verified details and questions to settle before reserving.
7 key facts confirmed; 7 more to verify before reserving; checked 2026-11-07.
This is not a project rating.
Tick what describes you — we will show whether this may be a fit. Honest, without gloss.
Your selections are not saved anywhere. This is a decision aid, not an assessment.
Best for: Households looking for a private home with a pool while remaining within Chiang Mai’s urban road network. The multi-level layouts may work well where the family wants separate bedrooms and more than one shared area.; Long-stay residents who prefer a self-contained property to a serviced apartment and are comfortable arranging maintenance. The pool and house systems become part of the ownership routine rather than amenities handled by a hotel.; Buyers willing to examine an individual house, its plot and the party selling it. The project has enough public corporate information to begin that process, but not to bypass it.; may not suit: Foreign buyers expecting the condominium foreign-quota rules to apply to a house-and-land purchase. They do not, and the legal route for a particular plot has not been documented here.; Anyone requiring proof that every home and communal element of the estate has already been completed. Historical company disclosures show that development was not that straightforward.; Hands-off investors relying on a guaranteed rental return or unrestricted short lets. No project-specific guarantee, validated operating budget or confirmed letting permissions were established..
A short, project-specific list. We request these from the developer and go through them with you before any payment.
This keeps the open points in one place. A missing or disputed fact is not treated as a conclusion.
From 23,800,000 THB — Basis requires confirmation · confirm the date of a current quotation. The price and availability of a specific unit are confirmed with the developer before reservation.

Mark Erometskiy
Thailand property expert (Pattaya, Phuket and Bangkok), co-founder of Bomi Home. Will help with the unit, ownership, stage and terms before you decide.
Ask about The Escape Mahidol →Send the project name, a link or a written offer. We can match the exact property, seller, title route, stage and current unit terms before you decide.
Informational, not a public offer or personal investment, legal or tax advice. Price, availability, payment terms and guaranteed-return/buyback conditions are confirmed per unit with the developer and their contract.