3 bedrooms
3,614,000–
Ornsirin Ville Sansai is a low-rise housing estate in the San Sai area of Chiang Mai province. It is not a condominium or a collection of holiday villas sold under a hotel brand.
Chiang Mai

From 3,614,000 THBBasis requires confirmation · confirm the date of a current quotation. Current price list, layouts and availability — discussed one-to-one with a project specialist
Photographs from the project’s materials.
Brand ≠ the legal entity signing your contract. This project may use a separate project company or joint venture — verify the seller and developer for the selected unit.
The public company’s annual report distinguishes 254 semi-detached homes from 11 fully detached houses. That is a more useful distinction than the estate’s unified architectural appearance. For any particular purchase, the position of the shared wall, plot lines, windows and parking arrangement will have a direct bearing on privacy and everyday comfort.
Ascott and Annesley offer two-bedroom living on one level according to the earlier project review. Clifton Hill and Harlington add a second storey and a third bedroom, while Kimbolton offers four bedrooms in a detached house. The official floor areas are clear; the availability, condition and included specification of any individual home remain separate questions.
Ornsirin reports Sansai ownership transfers in 2024 and a further 25 sales in 2025, alongside a June 2028 forecast for the overall development. The community should therefore not be described as wholly unbuilt, nor as universally completed. A specific buyer needs the handover status of the chosen building and its surrounding infrastructure, not an estate-wide slogan.
Maejo University, shopping facilities and San Sai Hospital are among the places named in Ornsirin’s journey estimates. That gives a clearer sense of the estate’s everyday geography than simply calling it “Chiang Mai”. Still, a measured commute from the correct entrance, at realistic hours, matters far more than a developer’s travel-time illustration.
The named project company can be found in the Department of Lands record, and the listed parent publishes substantial project disclosures. One of those documents also shows pledged land titles associated with Sansai. This does not condemn any current listing, but it creates a practical need for a fresh title search, a documented release process and clarity about the entity receiving the purchase funds.
Ornsirin Ville Sansai is a low-rise housing estate in the San Sai area of Chiang Mai province. It is not a condominium or a collection of holiday villas sold under a hotel brand. The development combines semi-detached homes with fully detached houses. Ornsirin’s 2025 annual report records 254 semi-detached and 11 detached homes, making 265 planned residences in all. That split matters to an owner: a shared wall changes the sense of separation from neighbours, while the footprint and land boundaries determine what outdoor space actually belongs to a particular home.
The estate has its own identity within the wider Ornsirin Ville family. Chotana, Tharua and Don-Chan are separate developments, not interchangeable names or later phases of Sansai. Ornsirin Property Co., Ltd. appears against this exact project in the Thai Department of Lands’ development listing, while publicly listed Ornsirin Holding is the parent group. Those are useful, independently traceable connections. They do not establish which legal entity will sign a particular sale agreement or receive a buyer’s funds, so the paperwork still needs to identify the contracting seller clearly.
Its precise location deserves more attention than the usual “Chiang Mai” label. The Department of Lands listing and the land-assets section of Ornsirin’s annual report place the estate in Nong Chom subdistrict, San Sai district. Some earlier sales material, and even an insurance schedule elsewhere in the annual report, instead refer to Nong Han. Both names are found in the source record; neither should be silently erased. Nong Chom is the stronger project-level reference for this dossier, but a buyer should match the actual plot number and entrance to a land-title plan before relying on an address or a pin.
There are five published house designs, rather than a single standard layout. The current official project page lists Ascott at 94 sqm, Annesley at 100 sqm, Clifton Hill at 128 sqm, Harlington at 140 sqm and Kimbolton at 196 sqm. Bedroom counts rise from two to four as the homes become larger. An earlier independent project review describes the first two as single-storey semi-detached houses, the middle pair as two-storey semi-detached houses, and Kimbolton as a two-storey detached home. The difference is more practical than the names suggest: the buyer is choosing a way of living, not simply an extra room.
Smaller single-level homes may appeal to people who want fewer stairs and less floor area to maintain. The two-storey three-bedroom designs make more space available for a household with children, visiting relatives or a home office. Kimbolton introduces both more rooms and a detached building, but that does not automatically mean a large garden or a quiet plot. Historical project material gives an approximate land-plot range of 35.5 to 86.1 square wah across the estate. The size, boundary, parking arrangement and setbacks need to be checked for the house actually offered.
Ornsirin markets the architecture as “Classic Country”, with styling borrowed from Western European rural houses. It also promotes a clubhouse and swimming pool. Other project profiles describe a gym, landscaped areas, a playground and security arrangements. These amenities are relevant for residents considering daily life rather than occasional holidays, yet promotional renders cannot tell us whether every facility is operating today or what it costs to maintain. The pool should be treated as a shared amenity; nothing verified here entitles every home to its own private pool.
The construction timetable needs to be read alongside the sales history. Ornsirin’s published progress page gives 1 June 2023 as the commencement date and June 2028 as the estimated completion of the wider development. Corporate disclosures nevertheless record ownership transfers associated with Sansai in 2024 and 25 house sales in 2025. Some individual homes have therefore progressed much further than the estate-wide timetable might imply. Neither a 2028 project date nor an agent’s “ready to move in” label proves the condition of the particular house on the day of a transaction.
This is a suburban address where routine travel is likely to shape the experience of living there. The developer estimates about six minutes to Maejo University, seven to Meechok Plaza and ten to San Sai Hospital; it puts Chiang Mai airport at roughly 32 minutes. Those are the developer’s stated driving estimates, not journeys independently measured for this dossier. A household commuting every day should check its own route from the actual entrance at the right time of day. Nearby facilities may be useful without necessarily being convenient on foot.
The advertised price picture is fragmented. Ornsirin’s project page displays a THB 2.69–9 million promotional range but does not clearly date that offer or identify available plots. A November 2024 review cited a starting figure of THB 2.9 million. Among the advertisements dated 27 September 2026 are a 128 sqm home at THB 3,614,000 and a 140 sqm home at THB 4,021,000. These are different kinds of evidence: a marketing range, an old launch-era reference and specific seller asking prices. None is a binding current quotation for all five designs.
For an overseas buyer, the distinction between the house and the underlying land is central. Thai law generally restricts land ownership by foreign individuals; owning a building is not automatically the same as holding title to the plot beneath it. A description saying “freehold” or “house for sale” does not settle the issue. The transaction documents must show what right is transferred, who holds the land title, whether any lease or separate building right is registered, and what happens on resale, expiry or inheritance. No nominee arrangement should be treated as a straightforward substitute for lawful ownership.
One material due-diligence point comes from Ornsirin’s own financial disclosures. Its 2025 annual report describes bank security over land linked to the development and identifies 236 land-title deeds in an asset schedule. That is a count of titles within a financial disclosure, not a revised total of houses: the 265-unit project figure is supported separately. The disclosure does not establish that a particular home offered today is still mortgaged, but it makes a current plot-by-plot encumbrance search, a release mechanism and controlled payment timing particularly important before transfer.
The group also reports that Ornsirin Ville Sansai received Thailand’s Home Energy Label No. 5 in 2025. It is a meaningful corporate claim about the project, not proof of every individual unit’s actual power bills or equipment specification. Buyers who value energy efficiency should ask which design and building specification the assessment covers. Equally important are the estate-management rules, recurring fees, maintenance obligations and any restrictions on letting. Only those unit-specific details can turn an attractive floor plan into a reliable estimate of what life and ownership here will involve.
The smallest published design keeps day-to-day living on one level. It may work for a couple or a smaller household, though one bathroom and an adjoining neighbour will not suit everyone. A 2024 project review describes two parking spaces; check the actual plot layout rather than treating that as a promise for every listing.
An extra bathroom makes this a different proposition from Ascott despite the modest six-square-metre increase. An earlier review also shows a flexible-use room, which could help someone working at home. Its dimensions and how well it can be separated from the living area must come from the chosen floor plan.
This design adds a third bedroom and separates living across two levels. That flexibility may matter to families with children, but stairs and the shared-wall arrangement remain part of the compromise. A September 2026 advertisement showed a 128 sqm home at THB 3,614,000; the listing did not independently establish an identical specification for every Clifton Hill house.
The additional bathroom can be more valuable in daily use than the increase in internal floor area. It may serve a family that needs greater separation between bedrooms and shared spaces. A 140 sqm home appeared in a September 2026 asking-price listing at THB 4,021,000; land size, finishes and contractual terms could still differ from another Harlington offer.
The largest published home is also the detached option, adding a fourth bedroom and a different level of separation from neighbouring houses. Independent project material describes space for three cars. Before treating it as a larger-garden alternative, inspect the individual land boundaries and what outdoor maintenance the owner will be responsible for.
The official Ornsirin page supplies the listed floor areas and bedroom/bathroom counts. House format, storeys and parking descriptions were cross-checked against Homenayoo’s 22 November 2024 project review. Older sales material used an approximate overall range of 93–194 sqm, so a signed unit plan and the actual building specification matter more than an estate-wide marketing range. A published design is not evidence that a matching plot remains available today.
8 amenities
Address / landmarkНонг Чом (Nong Chom), район Сан-Сай (San Sai), провинция Чиангмай, Thailand; точный адрес участка требует сверки
The map loads from OpenStreetMap on request.
The circle shows the project’s approximate location; we confirm the exact address and the plot boundaries when you get in touch. © OpenStreetMap contributors.
Landmarks around the project, from open maps (OpenStreetMap):
Distances are straight-line from the project, not walking routes — the real route is longer. © OpenStreetMap contributors.
The closest mapped place in each available category.
7-Eleven
Siwaporn Clinic
Tongkla School
Lakeview
OpenStreetMap · straight-line distances from the mapped project area, not walking routes.
Choose what matters to you and a comfortable radius. A mapped place is not proof of a walkable route.
OpenStreetMap · straight-line distances from the mapped project area, not travel time. “Not mapped” does not mean the place does not exist; verify the actual route and crossing.
Temperature, rain, sun and wind month by month for the surrounding area.
NASA POWER · 2001–2025 · area-wide climate averages, not a daily forecast. Rain bars show mm/day. Sun line is solar energy, not a count of sunny days.
Select the months you expect to stay to compare their long-run climate averages.
Select one or more months.
Climate: NASA POWER, 2001–2025 area averages; solar energy is not sunny-day count. Tourism: observed months for Chiang Mai province, not seasonal norms or this property’s rental occupancy.
Compare nearby arrival points before choosing a route.
Distances are straight-line from the mapped project area, not driving distances or travel times. Airport positions are reference points; the transport stop is from OpenStreetMap.
Chiang Mai province · September 2026
Foreign visitors and hotel room occupancy in the province
Selected visitor-friendly places within 5 km
Thailand Ministry of Tourism and Sports · Ministry of Tourism and Sports · preliminary monthly province figures, not this property’s rental occupancy. Nearby counts are selected OpenStreetMap places, not measured foot traffic.
Thailand · published price index, historical data
2015-01 — 2026-08 · Bank of Thailand · 2011=100. Regional housing index, not villa transaction prices or this project’s return.
Published sale-price references within 5 km, not rental listings or confirmed availability.
Compare the project with nearby alternatives
Approximate project locations and straight-line distances. Sale prices cannot be treated as comparable rent.
A short route from daily-life questions to market evidence. Selected for this project’s location and stage; these pages do not verify the project itself.
Build your scenario from the published facts and your choices on this page. Not a rating or a return promise.
Choose a goal; your selections in the widgets below will appear in the summary.
No conditions selected yet. Select the relevant criteria and nearby places in the widgets below.
Prepare a request around published unknowns and your conditions. Nothing is sent automatically.
The date belongs to an editorial record, not every individual fact. It does not verify a reviewed contract, legal clearance, current price or unit availability.
Price basis · Discrepancies3,614,000–
Primary sale
from 2,690,000 THB
Guides based on published asking prices. Confirm availability and the price of a specific unit before purchase.
· Long-term asking rents. Yearly quotes are shown as monthly equivalents. Confirm availability.
18,000 THB /month
The card states an expected completion period, not a contractual key-handover date.
Same fixed Bank Indonesia reference snapshot as the catalogue and AI adviser, dated 2026-10-21. Not a live exchange quote; exchange fees and spreads are excluded.
Your own cost scenario, not a predicted delay or a project estimate. Confirm the contractual handover date and conditions for delays in the SPA; blank inputs mean unknown.
The starting amount is the published project price. Adjust the sliders to compare scenarios.
Compare your current inputs with a lower occupancy and higher share of running costs. Set the changes yourself; this is a stress test, not a forecast.
| Year | Gross rent | Running costs | Cumulative net rent | Property value | Total |
|---|
8% potential gross rent, 65% occupancy, 20% running costs and 3% price change are editable examples, not a forecast. Taxes, financing, transaction fees and resale terms are excluded. Occupancy and costs apply to rent, not to the property value.
Enter your own expenses. No market averages are assumed.
Blank fields are unknown, not zero. This is not a full ownership budget: taxes, loan payments, transaction costs and unexpected repairs are excluded unless you include them yourself.
Change rent, occupancy and costs above; public benchmarks are reference points.
The property bar is net rental cash flow divided by purchase price, before tax; it excludes price growth. US Treasury yield is in USD. Inflation shows purchasing-power erosion, not a separate investable return. Risk, taxes, liquidity and currency differ. US CPI source
Under construction. Handover declared for 2028.
Before reserving, check the timeline, payment schedule and buyer protections in the contract.
Verified details and questions to settle before reserving.
6 key facts confirmed; 7 more to verify before reserving; checked 2026-11-05.
This is not a project rating.
Tick what describes you — we will show whether this may be a fit. Honest, without gloss.
Your selections are not saved anywhere. This is a decision aid, not an assessment.
Best for: A household planning to settle in the San Sai area and wanting a house rather than a city apartment can compare a genuinely small single-level design with larger family layouts. The choice should be shaped by actual school runs, the adjoining wall and the condition of the shared estate facilities.; Couples or residents who would rather avoid stairs may find Ascott or Annesley more practical than a larger two-storey house. The extra bathroom in Annesley could matter more than its modest additional floor area.; Families needing a separate work room, space for relatives or more bedrooms may want to examine Harlington and Kimbolton closely. They should still distinguish interior space from the size and maintenance burden of the individual plot.; Buyers who value an established development group can follow a clearer public information trail here than at an anonymous private-house listing. That traceability supports due diligence but never substitutes for a clean title and enforceable transfer documents.; For a Thai buyer seeking an owner-occupied home, the range of semi-detached and detached housing is the central choice. A non-Thai buyer needs to begin one step earlier, with the lawful and documented relationship between the house, the land and the proposed contract.; may not suit: Someone looking for a walkable inner-Chiang Mai lifestyle may find this suburban estate inconvenient. Its appeal is the space and layout of a house, not immediate access to the city’s central streets.; A foreign buyer expecting ordinary direct title to a Thai land plot merely because a house is advertised for sale has a legal question to resolve before choosing a design. The public marketing material does not answer it.; A buyer who needs every estate facility fully operational on the day of purchase should not rely on model-home imagery or the overall June 2028 schedule. The exact home, access and common areas require a dated inspection.; An investor who needs a verified net rental return or unrestricted short stays will not find that evidence in the available material. Estate rules, applicable permissions, realistic tenancy demand and recurring costs remain to be established..
A short, project-specific list. We request these from the developer and go through them with you before any payment.
This keeps the open points in one place. A missing or disputed fact is not treated as a conclusion.
From 3,614,000 THB — Basis requires confirmation · confirm the date of a current quotation. The price and availability of a specific unit are confirmed with the developer before reservation.
2028-06. The contractual handover date is fixed in the SPA.

Mark Erometskiy
Thailand property expert (Pattaya, Phuket and Bangkok), co-founder of Bomi Home. Will help with the unit, ownership, stage and terms before you decide.
Ask about Ornsirin Ville Sansai →Send the project name, a link or a written offer. We can match the exact property, seller, title route, stage and current unit terms before you decide.
Informational, not a public offer or personal investment, legal or tax advice. Price, availability, payment terms and guaranteed-return/buyback conditions are confirmed per unit with the developer and their contract.