Studio
1,800,000–
Supalai Monte 2 is an established condominium rather than a presale opportunity. Its attraction is the chance to inspect a real apartment in a completed Chiang Mai tower, see the common areas and assess how the building is managed.
Chiang Mai

From 1,950,000 THBBasis requires confirmation · confirm the date of a current quotation. Current price list, layouts and availability — discussed one-to-one with a project specialist
Photographs from the project’s materials.
Brand ≠ the legal entity signing your contract. This project may use a separate project company or joint venture — verify the seller and developer for the selected unit.
The 2018 completion removes presale construction uncertainty but puts attention on present-day maintenance, apartment condition and service costs. A viewing can answer questions that a launch brochure never could.
Primary records separate Supalai Monte 2 from the similarly named Monte at Viang nearby. Correct project identification is essential before using a floor plan, title document or seller’s description.
Original studio, one-bedroom and two-bedroom plans serve different households, while the resale market includes less typical large units. The actual layout and bathroom count are often more revealing than a headline area figure.
Central Chiang Mai and the San Dek junction make this a recognisable, practical address for drivers. The busy road environment and pedestrian crossing deserve just as much attention as the shopping access.
A November 2026 studio asking price offers a dated budget reference, not a promise of available foreign ownership or a guaranteed transaction. Seller authority, charges and the unit title remain decisive.
Supalai Monte 2 is an established condominium rather than a presale opportunity. Its attraction is the chance to inspect a real apartment in a completed Chiang Mai tower, see the common areas and assess how the building is managed. Construction was completed in 2018, so most current buying decisions concern individual resale units. That changes the central question: the buyer is no longer chiefly assessing a completion promise, but the condition, legal title, costs and suitability of one apartment within an operating building.
The project sits near the San Dek junction, where the Chiang Mai–Doi Saket road meets major routes around the eastern side of the city. Central Chiang Mai, formerly branded Central Festival, provides an immediately recognisable landmark. This is a road-oriented residential location with access to shopping and routes leading into and out of Chiang Mai. It is not the same proposition as a quiet Old City street or a walkable Nimman address. Its practical appeal is stronger for someone who expects to use a car or other road transport regularly.
Proximity to the mall deserves a more careful reading than a map pin. An on-the-ground review conducted when the development was being marketed described an awkward pedestrian crossing at the nearby major junction. Road layouts and crossings may have changed since then, but the original observation explains why a short straight-line distance should not be advertised as effortless access on foot. For someone without a vehicle, the actual route, pavement conditions, lighting and public transport options matter more than the number of metres displayed by a listing platform.
This is one 32-storey condominium tower with 734 residential apartments and four retail premises. Thailand’s Department of Lands recorded 738 registered units in total. Both figures can be correct: the smaller number refers to homes, while the larger one includes the commercial units. The distinction matters for a purchaser comparing project descriptions that appear to use different unit counts. It also helps explain the building’s character. With hundreds of homes sharing lifts, amenities, parking and maintenance budgets, the day-to-day experience will depend heavily on how those systems are maintained.
The project must not be confused with Supalai Monte at Viang, the earlier nearby condominium, or with the neighbouring Supalai Monte Biz commercial development. Similar branding and close proximity do not mean identical titles, floor plans or operating arrangements. In the Department of Lands record, this property appears under the Thai name ศุภาลัย มอนเต้ 2. The 2022 company report also lists Supalai Monte 2 separately, establishing an independent project identity rather than an interchangeable marketing phase.
The developer is identifiable from primary records as Supalai Public Company Limited, a publicly listed Thai real estate company. Its corporate report places this project on the Chiang Mai–Doi Saket road, and the Department of Lands names Supalai in the 2018 condominium registration list. These are strong sources for project identity and origin. They do not, however, establish that Supalai is selling the apartment a buyer sees today. Most resale transactions involve a unit owner, whose authority, mortgage status and sale terms must be assessed on their own evidence.
Original plans cover studios, one-bedroom apartments and two-bedroom layouts. Studios begin at approximately 33 sq m; the established one-bedroom range starts at 41.5 sq m, while the standard two-bedroom plan is around 64.5 sq m. A one-bedroom design can offer a meaningful separation between sleeping and living areas, particularly useful for a resident working from home. A studio keeps more functions within one space and may suit a single occupant or a simpler rental arrangement. The published two-bedroom plan has one bathroom, a real consideration for people intending to share the property.
Some resale advertisements also show substantially larger homes, including a roughly 117 sq m upper-floor apartment. Such listings demonstrate that the resale market is not limited to the standard studio and one-bedroom offering, but they do not establish a consistent range of larger apartments available at any given time. Listing labels are not always aligned with original plans either: a 33 sq m unit may be marketed as a one-bedroom even when its original layout was a studio. A current floor plan and physical inspection are therefore more useful than a category filter alone.
The original building concept placed parking across the lower levels, with retail and the entrance lobby at ground level. The fifth floor was designed to accommodate a swimming pool and fitness facilities, while the roof level included a lounge, library and landscaped area. A contemporary project directory continues to list the fifth-floor pool and gym. Those records establish the planned amenities, not the exact condition or access policy in November 2026. An attractive brochure rendering says nothing about whether an area is currently closed for repairs or whether residents face booking restrictions.
Parking calls for similar care. An early detailed project review estimated capacity at roughly half the residential unit count and included tandem spaces in that estimate. This was a design-era figure, not a verified 2026 parking audit. Buyers relying on a car should find out whether their specific unit has assigned parking, how visitor spaces are handled and what happens when vehicles need to be moved. People who do not drive may instead prioritise the availability of taxis, delivery access and a workable route to the places they visit most often.
A current resale search provides a more useful price reference than an old launch brochure. A 33 sq m studio was advertised for THB 1.95 million in a listing refreshed on 7 November 2026. That is an asking price for one unit, not a developer starting price or evidence of a completed transaction. Other listings vary by floor, size, view, condition, furniture and the ownership status claimed by the advertiser. Availability can change quickly, and the final purchase cost may include transfer expenses, outstanding common fees or other charges allocated between seller and buyer.
Rentals offer another layer of market evidence without providing a reliable yield forecast on their own. For example, a local agency advertised a furnished 46 sq m one-bedroom apartment at THB 16,000 per month on a twelve-month contract. The figure reflects one asking rent and one lease structure, not the rent achieved by every similar apartment. Vacancy periods, agency fees, repairs, condominium charges, taxes and any management arrangement all affect the owner’s net outcome. A promised return should never be inferred simply by comparing a sale listing with an unrelated rental listing.
Published maintenance figures need reconciliation. A detailed launch-era review cited a monthly common-area charge of THB 35 per square metre and an initial sinking-fund contribution of THB 350 per square metre. A more recent directory lists THB 30 per square metre for common fees without establishing whether this remains the rate assessed to owners. Neither historical figure should be presented as a verified current bill. The condominium juristic person should provide an up-to-date fee schedule, confirmation of arrears and information about major works already paid for or contemplated.
The Department of Lands lists this condominium as registered in June 2018, a meaningful starting point for foreign buyers. Thailand’s general foreign-ownership limit applies to a proportion of the aggregate unit floor area of a registered condominium, commonly 49%, rather than a simple count of apartments. Whether a specific unit can be registered in a foreign buyer’s name depends on the quota position, the buyer’s eligibility and the documents available at transfer. A listing marked foreign quota should be treated as an advertiser’s statement until supported by the relevant condominium and land-office records.
There is also a source discrepancy worth resolving before legal documentation is prepared. The government registration list places the property in Wat Ket and gives registration reference 7/2561, while a marketing disclosure reproduced on a property directory identifies Nong Pa Khrang and 11/2561. The developer’s annual report supports Wat Ket. Rather than selecting whichever address appears more often online, the transaction should rely on the certified condominium registration and the actual unit title. The distinction does not prevent a useful description of the location, but it matters when matching documents to the correct property.
Finally, rental strategy and owner occupation should not be treated as interchangeable. Ordinary residential letting is different from operating short-stay accommodation; the rules of the building and Thailand’s hotel-related requirements may affect what can legally be offered. No building-specific permission for holiday-style rentals was established in the materials reviewed. The most natural fit for Supalai Monte 2 is therefore a buyer who values an existing Chiang Mai apartment near a major shopping and transport node, accepts the trade-offs of a busy road and is willing to verify the particular unit rather than rely on the condominium brand alone.
A compact self-contained home, with living and sleeping functions mainly sharing the same room. A resale listing may call a 33 sq m unit a one-bedroom, so the actual floor plan matters.
Separating the bedroom from the living area can improve privacy and make longer stays more comfortable. Kitchen arrangement, balcony placement and furnishings differ by unit.
Useful when two distinct bedrooms matter more than having several bathrooms. The published plan provides one bathroom, and resale renovations may change the practical arrangement.
Areas describe the original product range rather than live inventory. Secondary listings may use slightly different measurements, describe renovated studios as one-bedroom units or offer larger upper-floor homes. Layout, asking price, furnishings and registrable title must be checked separately for each property.
Each option includes a factual reason for the comparison. Price and availability are confirmed for the selected unit.

Alternative project in the same city

Alternative project in the same city

Alternative project in the same city

Alternative project in the same city
7 amenities
Address / landmarkChiang Mai–Doi Saket Road (Highway 118), near San Dek intersection and Central Chiang Mai; Wat Ket per 2018 Land Department registry, Mueang Chiang Mai, Chiang Mai, Thailand
The map loads from OpenStreetMap on request.
The circle shows the project’s approximate location; we confirm the exact address and the plot boundaries when you get in touch. © OpenStreetMap contributors.
Landmarks around the project, from open maps (OpenStreetMap):
Distances are straight-line from the project, not walking routes — the real route is longer. © OpenStreetMap contributors.
The closest mapped place in each available category.
Central Festival Chiang Mai
Romrawin Clinic
Wachirawit School
Railway Park
OpenStreetMap · straight-line distances from the mapped project area, not walking routes.
Choose what matters to you and a comfortable radius. A mapped place is not proof of a walkable route.
OpenStreetMap · straight-line distances from the mapped project area, not travel time. “Not mapped” does not mean the place does not exist; verify the actual route and crossing.
Temperature, rain, sun and wind month by month for the surrounding area.
NASA POWER · 2001–2025 · area-wide climate averages, not a daily forecast. Rain bars show mm/day. Sun line is solar energy, not a count of sunny days.
Select the months you expect to stay to compare their long-run climate averages.
Select one or more months.
Climate: NASA POWER, 2001–2025 area averages; solar energy is not sunny-day count. Tourism: observed months for Chiang Mai province, not seasonal norms or this property’s rental occupancy.
Compare nearby arrival points before choosing a route.
Distances are straight-line from the mapped project area, not driving distances or travel times. Airport positions are reference points; the transport stop is from OpenStreetMap.
Chiang Mai province · September 2026
Foreign visitors and hotel room occupancy in the province
Selected visitor-friendly places within 5 km
Thailand Ministry of Tourism and Sports · Ministry of Tourism and Sports · preliminary monthly province figures, not this property’s rental occupancy. Nearby counts are selected OpenStreetMap places, not measured foot traffic.
Thailand · published price index, historical data
2015-01 — 2026-08 · Bank of Thailand · 2011=100. Regional housing index, not villa transaction prices or this project’s return.
Published sale-price references within 5 km, not rental listings or confirmed availability.
Compare the project with nearby alternatives
Approximate project locations and straight-line distances. Sale prices cannot be treated as comparable rent.
A short route from daily-life questions to market evidence. Selected for this project’s location and stage; these pages do not verify the project itself.
Build your scenario from the published facts and your choices on this page. Not a rating or a return promise.
Choose a goal; your selections in the widgets below will appear in the summary.
No conditions selected yet. Start with fit criteria, everyday places or the months you plan to stay.
Prepare a request around published unknowns and your conditions. Nothing is sent automatically.
The date belongs to an editorial record, not every individual fact. It does not verify a reviewed contract, legal clearance, current price or unit availability.
Price basis · Discrepancies1,800,000–
Foreign quota
1,999,000–
Local quota
2,100,000 THB
Local quota
1,990,000 THB
2,000,000–
Foreign quota
2,950,000–
4,200,000–
9,500,000–
Guides based on published asking prices. Confirm availability and the price of a specific unit before purchase.
Matched by property type, bedrooms, size, stage and known transaction terms. Each development counts once in the median.
· Long-term asking rents. Yearly quotes are shown as monthly equivalents. Confirm availability.
12,000–
11,000 THB /month
22,000 THB /month
Annual rent ÷ purchase price × 100. Published figures are matched within the development by property type, bedrooms and size within 15%. Costs, taxes and vacancy are excluded.
5.29%
Local quota
7.24%
4.8%
The starting amount is the published project price. Adjust the sliders to compare scenarios.
Compare your current inputs with a lower occupancy and higher share of running costs. Set the changes yourself; this is a stress test, not a forecast.
| Year | Gross rent | Running costs | Cumulative net rent | Property value | Total |
|---|
8% potential gross rent, 65% occupancy, 20% running costs and 3% price change are editable examples, not a forecast. Taxes, financing, transaction fees and resale terms are excluded. Occupancy and costs apply to rent, not to the property value.
Enter your own expenses. No market averages are assumed.
Blank fields are unknown, not zero. This is not a full ownership budget: taxes, loan payments, transaction costs and unexpected repairs are excluded unless you include them yourself.
Change rent, occupancy and costs above; public benchmarks are reference points.
The property bar is net rental cash flow divided by purchase price, before tax; it excludes price growth. US Treasury yield is in USD. Inflation shows purchasing-power erosion, not a separate investable return. Risk, taxes, liquidity and currency differ. US CPI source
Completed. Not a render.
Completion year to be confirmed, but the building is up — view it in person.
Verified details and questions to settle before reserving.
8 key facts confirmed; 7 more to verify before reserving; checked 2026-10-27.
This is not a project rating.
Tick what describes you — we will show whether this may be a fit. Honest, without gloss.
Your selections are not saved anywhere. This is a decision aid, not an assessment.
Best for: An owner-occupier who prefers a completed apartment that can be inspected before any purchase commitment.; A driver whose daily routes make the eastern Chiang Mai road network and the Central Chiang Mai shopping area convenient.; A single resident or couple looking for a studio or separate-bedroom layout within a larger managed condominium building.; A long-term rental investor prepared to assess each resale property, fee schedule and likely net income without assuming a guaranteed return.; may not suit: Anyone prioritising a quiet pedestrian neighbourhood and a low-density residential building over access to major roads.; A household requiring at least two bathrooms, since the published standard two-bedroom layout provides only one.; A buyer who needs guaranteed, uncomplicated dedicated parking before the building’s allocation rules have been verified.; Someone whose purchase decision depends on assured short-stay rental permissions or automatic foreign-quota availability..
A short, project-specific list. We request these from the developer and go through them with you before any payment.
This keeps the open points in one place. A missing or disputed fact is not treated as a conclusion.
From 1,950,000 THB — Basis requires confirmation · confirm the date of a current quotation. The price and availability of a specific unit are confirmed with the developer before reservation.

Mark Erometskiy
Thailand property expert (Pattaya, Phuket and Bangkok), co-founder of Bomi Home. Will help with the unit, ownership, stage and terms before you decide.
Ask about Supalai Monte 2 Chiang Mai →Send the project name, a link or a written offer. We can match the exact property, seller, title route, stage and current unit terms before you decide.
Informational, not a public offer or personal investment, legal or tax advice. Price, availability, payment terms and guaranteed-return/buyback conditions are confirmed per unit with the developer and their contract.