Thailand News
Saphan Hin waste facility on Phuket reopens to regular deliveries
Let’s explore this page together
Intake was first restricted on November 8
The facility stopped receiving waste from other local administrative organisations and their contractors because volumes exceeded its handling capacity. Trucks unloading on the access road were also blocking vehicles trying to enter.
Limited deliveries resumed on November 12. The municipality announced normal acceptance on November 20 and restored it on Monday, November 23. Reports on November 24 and 25 confirmed the change, citing Phuket City Mayor Suppachoke Laongphet.
Cells 4 and 5 have designated routes and unloading points
Crews spent about two weeks preparing extra disposal areas and improving access. The Phuket Highway District supplied reclaimed asphalt for the roads. Signs installed on November 23 identify the entrances, exits and unloading points at cells 4 and 5.
Local authorities, private contractors and licensed operators must use those areas. Tipping on access roads or outside the designated points is prohibited. The municipality warned that deliveries from an operator causing damage or disruption could be suspended again.
Collection teams still have accumulated waste to clear
Restored access allows local services to return to their usual disposal arrangements. The timing of individual pickups and backlog clearance depends on the contractor serving each address.
Additional space addresses the immediate intake problem. Phuket's longer-term balance between waste volumes and disposal capacity remains unresolved.
Sources3
- The Phuket News, “Phuket landfill resumes normal operations”, 25 November 2026.
- Phuket Post, report on the reopening and designated unloading areas, 24 November 2026.
- Thailand Public Relations Department, Phuket office, report on preparations at landfill cells 4 and 5, 11 November 2026.