MIRAKU Capital & Development
MIRAKU Capital & Development Co., Ltd is a Japanese-Cambodian joint venture, the developer of the multifunctional G.A.T.O Tower skyscraper in the BKK1 district of Phnom Penh. We describe this developer plainly and without embellishment: G.A.T.O Tower is its first project in Cambodia, and the company has no completed projects yet. So it should be assessed not by track record (which does not exist yet), but by the composition of the project team and the construction stage. Below is what has actually been confirmed.
Key facts
| Parameter | Value |
|---|---|
| Official name | MIRAKU Capital & Development Co., Ltd |
| Type | Japanese-Cambodian joint venture |
| Market | Phnom Penh (Cambodia) |
| Project in the NovAsia catalogue | G.A.T.O Tower |
| Completed projects | None (G.A.T.O Tower is the first project) |
| Project architect | Shin Takamatsu Architect & Associates (Japan) |
| Project engineer | Meinhardt Group |
| Management | WH Living & Properties Co., Ltd |
Project in the NovAsia catalogue
- G.A.T.O Tower — a multifunctional skyscraper (condominium + 5-star hotel) of Japanese design in BKK1, Street 334, near Norodom Boulevard. 67 floors, about 297 m tall, 710 units (472 condos + 238 hotel rooms). Freehold / hard title (strata) ownership, available to foreigners, 70% quota. Construction start — Q2 2026, completion — 2030. Amenities include a Japanese onsen, an infinity pool and a sky bar on the upper floors.
G.A.T.O Tower prices differ between broker sources, so on the site they are given as a "from $X" reference, not a developer offer. We do not claim any guaranteed income or buy-back programs on the project — they are not in our data; a 6–8% gross yield for BKK1 is a market benchmark, not a guarantee.
What to look at instead of a track record
Since MIRAKU has no completed projects yet, the usual argument "the developer has already delivered N properties" does not apply here — and we deliberately do not use it. What can actually be assessed on this project:
- Architect — Shin Takamatsu Architect & Associates, a well-known Japanese studio; this affects the design and recognizability of the property;
- Engineer — Meinhardt Group, an international engineering company;
- Management — WH Living & Properties Co., Ltd;
- Location — BKK1, one of the most in-demand districts of Phnom Penh;
- Horizon — completion 2030, i.e. a long hold with corresponding construction risk.
Project timeline
MIRAKU has no completed properties, so below are the milestones not of the company but of its single project, G.A.T.O Tower, per the developer's stated data:
- Announced
G.A.T.O Tower and its project team presented: architect Shin Takamatsu, engineer Meinhardt.Per the developer
- Q2 2026
Stated construction start of the tower in BKK1.Stated timeline · off-plan
- 2030
Stated completion and handover — a long horizon.Stated developer timeline
This is the timeline of the current project, not a history of delivered properties: MIRAKU has no completed projects, so adherence to timelines and handover quality cannot be judged from past work. Stated timelines are not a guarantee; actual construction progress should be tracked.
What is not yet confirmed
Honestly about the limits of our data — there are more of them for a first-time developer than usual:
- the company has no completed properties by which to judge its adherence to timelines and handover quality;
- the corporate history and financial stability of the JV are limited in public sources;
- prices and some characteristics (65/67 floors, number of hotel rooms) differ between sources — we state consensus values cautiously;
- the 5-star hotel brand operator has not been officially announced;
- timelines are as declared (start Q2 2026, completion 2030); actual construction progress should be tracked.
NovAsia's take
G.A.T.O Tower is a project notable for its ambition, with a strong project team (a Japanese architect, an international engineer) in the premium BKK1 location. At the same time, MIRAKU is a developer without completed properties, and completion is planned for 2030. That means elevated construction risk and a long horizon: the buyer is betting on the team and location, not on a proven developer history. Such a project suits an investor who consciously accepts the risk of off-plan with a new developer for the sake of the design and address, and who wants to verify the construction progress and contract terms themselves before booking. We deliberately do not call this developer "reliable" — there are no completed projects yet to support such a conclusion.
Considering G.A.T.O Tower? Message the bot — we'll honestly break down the project: strengths, the risks of a first-time developer, the construction stage and what is critical to check in the contract before booking.
Discuss G.A.T.O Toweror take the quiz →Sources
The official G.A.T.O Tower project brochure · the official MIRAKU website (miraku-capital.com) — developer public materials, opened in July 2026 · a MIRAKU post dated 11 May 2026 on signing an MOU with LBL International Construction (the post states the ceremony date inconsistently, so only the publication date is used) · public listings on Cambodian real estate portals (realestate.com.kh and others) · NovAsia partner network data on the ground. The project team composition (architect, engineer, management) — per the developer and public materials. The absence of completed projects is noted deliberately. Verified: July 2026. Data may be updated.
Nov