What a Bali Land Lease Costs Beyond the Per-Are Rate
Published · Updated
What is the full base-term amount behind an annual land quote?
FIRST Property advertises plot FP-2026-0040 in Dalung at IDR 9 million per are per year. That is a rate, not the cost of acquiring the lease for its remaining life. These public land cards display an annualised number without specifying when the underlying amounts would be paid. For someone deciding how much capital is needed at the outset, the missing payment schedule is as important as the rate itself.
An are is 100 square metres. The Dalung summary rounds the land to 386 m², but its description gives a surveyed 3.8622 are, equivalent to 386.22 m². Using the more precise figure, 3.8622 multiplied by IDR 9,000,000 produces IDR 34,759,800 per year on an annualised basis. The listing displays that same annual figure. The calculation therefore checks the published arithmetic; it does not establish how the lease will be invoiced.
The advertised lease runs to 1 December 2053 and is described as having about 27 years remaining. Exactly 27 years at an unchanged rate would yield IDR 938,514,600 for the base period, assuming the same land area is charged throughout. The word “exactly” belongs to our model, not to the source. A contractual start date, the treatment of any incomplete year and the final amount due would have to come from an offer or draft lease. A date on a website is insufficient to work out a defensible fraction of a year.
Imagine two written proposals carrying precisely that annualised rate. One could require most or all of the base-term amount at signing, while another could specify dated instalments. Their headline rates would match, but their liquidity demands would not. Neither payment structure is established for FP-2026-0040 by its public listing. Taxes, transaction costs, access charges and utility connections also cannot be treated as included merely because a per-year number is visible.
For decision-making, it helps to separate a pricing basis, an illustrative full-term calculation and a verified cash schedule. Only the first two can be explored from the published Dalung figures. With a second property, the relevant comparison is not IDR 9 million versus IDR 14 million in isolation: it is the rate applied to the area being charged for the exact base period. The calculator is useful for changing those assumptions, while the written payment commitment remains an additional question.
Documented budget inputs
Fixed-rate model: budget ÷ (rate × base years) = maximum chargeable area in are; chargeable area × rate × base years = illustrative base-term price. Area × rate gives the annualised quote, not annual instalments. The four starting values are illustrative and do not belong to one live offer. Rate, years and area must be positive; taxes, extras and renewal are excluded.
Why the Tabanan land price changes once shared access is excluded
Tabanan listing FP-2026-0041 offers an unusually useful distinction: 12.62 gross are, with approximately 9.47 are left after a shared-access area. The gap is 3.15 are, or 315 m², which is about 24.96% of the stated gross plot. The headline 1,262 m² describes the larger boundary. Anyone considering a layout for their own project needs to know which part is part of the land measurement but not part of the exclusive area remaining after the shared road.
There is a way to identify the pricing basis without guessing. The listing says IDR 14 million per are per year and also displays an annualised IDR 176,680,000. Dividing the second figure by the first produces 12.62, the gross area. On the advertised figures, the annualised charge is therefore calculated using gross land, not the 9.47 are remaining after shared access. A signed document could still specify a different chargeable boundary, so this establishes what the public quote says rather than what a contract will demand.
Keep that IDR 176.68 million unchanged and spread it across the smaller land area: the effective price is about IDR 18.66 million per net are per year. That is approximately 33.26% above the advertised IDR 14 million rate. The difference is not an increase in the seller's stated price. It appears because a fixed numerator is divided by fewer are. Normalising the figure this way makes the hidden area assumption visible when two listings have very different access arrangements.
The adjective “net” requires care. For this comparison it means land remaining after the described shared access, not approved building coverage or the floor area of a future villa. The listing does not supply the surveyed road plan, the legal terms of access or a parcel-specific confirmation of what can be built on the remaining 9.47 are. And because 9.47 is given as approximate, an effective rate derived from it should also be rounded, not presented as a precisely contracted price.
The Tabanan lease chain is advertised to 20 October 2058, with roughly 32 years remaining. A simple 32-year model at the unchanged gross-area rate equals IDR 5,653,760,000; it is neither a verified contract total nor proof that the full amount is due now. Dalung is different in one crucial respect: although its surveyed area is supplied, no separate post-access area is disclosed. A Dalung net-are rate cannot be calculated without the missing area, and applying Tabanan's road percentage to it would create a number that belongs to neither property.
What the listed land rate covers
FIRST Property asking figures reviewed on 19 October 2026. A net-area rate appears only where post-access land is disclosed. The 27- and 32-year totals assume a constant rate for exactly that many years; neither is a verified payment demand.
| Metric | Dalung | Tabanan |
|---|---|---|
| Gross land, are | 3.8622 | 12.62 |
| Net after shared access, are | not disclosed | ≈9.47 |
| Area used for the quote | 3.8622 in quote; contract unverified | 12.62 gross are |
| Quoted IDR per are per year | 9 million | 14 million |
| Annualised quote, IDR | 34,759,800 | 176,680,000 |
| Effective IDR/net are/year | not calculable | ≈18.66 million |
| Base-term end date | to 1 Dec 2053 | to 20 Oct 2058 |
| Illustrative base-term amount | ≈938.5m; 27-year model | ≈5.654bn; 32-year model |
Which lease years are priced now, and which belong to renewal?
The “years” attached to a Bali land listing are not always the same kind of years. Dalung's roughly 27 and Tabanan's roughly 32 refer to remaining time before stated end dates. A 42-year headline may be different: it can combine a present base lease with an advertised future extension. Nyanyi listing LD157 is an especially revealing example because indexed versions of the same property code contain materially different pricing details. Reading all of those years as already purchased would conceal the very distinction a buyer needs for a cash budget.
An earlier version of LD157 advertised 5.4 are over 42 years at a blended IDR 17.9 million per are per year. Its description, however, separately priced 27 base years at IDR 22 million per are per year and another 15 extension years at IDR 10.5 million. For the stated 5.4 are, the base-period model comes to IDR 3,207,600,000. The additional 15 years would contribute IDR 850,500,000 if the advertised extension terms were valid and exercised. Neither figure establishes the schedule or enforceability of the underlying contract, which has not been provided.
Those two modelled amounts total IDR 4,058,100,000. The old listing's 42-year card total was IDR 4,059,720,000, a difference of IDR 1,620,000. The arithmetic identifies a plausible explanation: the weighted rate is about IDR 17.892857 million and rounds to the card's IDR 17.9 million. The difference alone does not establish a billing error, let alone misconduct. Nor should the blended rate be substituted for the initial 27-year rate of IDR 22 million.
A fresher indexed version of the same LD157 code, found during the 19 October 2026 review under a /leasehold/nyanyi/ URL, displays 42 years and 5.4 are but quotes IDR 15.9 million per are per year and IDR 3,606,120,000 in total. Its visible description does not retain the earlier 27-plus-15 pricing split. These are conflicting published versions of one listing, not two independent market observations and not proof of a completed price reduction. The older breakdown is retained here only to demonstrate how a base lease and an extension should be modelled separately; it must not be presented as the currently available contractual terms.
The FIRST Property listings use different language again. Dalung offers a first right to extend for up to 30 further years, with terms to be agreed when renewal is considered. Tabanan refers to a 35-year priority extension that must be arranged by October 2055. Neither public card fixes an extension rate or supplies signed renewal provisions. A priority or first right can be commercially relevant, but it is not the equivalent of a paid, unconditional addition to today's base lease.
That distinction affects both the price one compares today and the funds one may need much later. A lower blended rate over an advertised long horizon can coexist with a significantly higher initial-period rate. Until a document identifies what is granted now, any notification deadline, how an option is exercised and when its price becomes payable, the responsible way to budget is to keep the base lease and the potential extension on separate lines. The public wording is useful for framing the questions, not for answering the enforceability question.
Common mistakes and how to fix them
What it costsThe upfront cash requirement may be badly understated: an annualised quote says nothing about due dates.
What to do insteadObtain a written base-term total, dated payment schedule, currency and named recipient.
What it costsThe project horizon silently includes years whose price, procedure or availability is not established.
What to do insteadUse dated base-lease terms first, then model the renewal right as a separate contingent period.
What it costsThe older description priced those first years at IDR 22m per are; rounding explains an IDR 1.62m card gap, while a newer version quotes a different rate.
What to do insteadSeparate the historical periods and listing versions, then seek a current written offer with the base and option amounts.
What must agree before a land quote becomes a payment commitment?
A web quote can establish the questions to ask, but it is an unreliable substitute for a payment commitment. Before funds change hands, the parcel reference needs to match across the plan, written offer, draft lease and its attachments. So do the chargeable land area, calendar start and end dates, IDR rate, full base-period price and any separate items. A price is only intelligible when its numerator, area basis and time period all refer to the same land entitlement. Otherwise, two documents can each look plausible while describing different transactions.
Tabanan provides a useful test case. The advertised IDR 176.68 million annualised amount is exactly 12.62 are at IDR 14 million. Pricing only 9.47 are at the same stated rate would instead produce IDR 132.58 million, a difference of IDR 44.1 million for one modelled year. Nothing in the public material shows a contract using that lower basis; it is a hypothetical illustration of why the payable boundary must be stated explicitly. The access drawing and the monetary clause need to describe the same area.
The dates deserve the same attention as the map. A rounded “32 years left” label does not settle when the lease starts to run for the incoming party, whether an initial fraction of a year is charged or how the final period is counted. There may be a date on which documents are signed, another for possession and a third that determines the agreed calculation. None should be inferred from the headline end date. Even when the annualised rate stays constant, a different recognised period can change the contractual total.
Next comes cash flow. One amount should be identifiable as the base price, with separate dates and beneficiaries for every payment. A published IDR/year figure provides no evidence of yearly instalments, monthly instalments or a right to spread the cost. If an offer, payment instruction and agreement identify different sums or recipients, the discrepancy needs resolving in writing before treating any one version as final. Taxes, notarial charges, utility work and access-related costs must likewise be listed where applicable; absence from an advertisement is not evidence that they are included or free.
Renewal requires its own price and process rather than a footnote to today's total. That may involve an option document, a specified notice window, further agreement on the rate or a separate transfer at a later date. The limited document request below is designed to connect area, time and money, not to certify land title or grant building permission. When a relevant document has not been supplied, “not provided” is an accurate status; “no legal right exists” would be a conclusion unsupported by the public listing.
Document checklist
Parcel and payable boundaryChecklist0 of 2
Shared access and net areaChecklist0 of 2
Base lease and paymentChecklist0 of 3
Renewal separatelyChecklist0 of 2
Can the cheaper land quote still be the wrong plot?
A price comparison can be numerically sound and still point towards the wrong plot. Tabanan's listing describes land beside a river gorge. The 9.47 are remaining after shared access do not tell a designer what setbacks apply, whether parts of the land are steep, or where a permissible building footprint would sit. Two parcels with identical net-area pricing may have vastly different development constraints. A net-are calculation is valuable for comparing one cost dimension, not for approving a construction scheme.
Access presents a separate question. A road visible in marketing photographs is not, by itself, evidence of the entitlement to use it for a particular project. The relevant drawing and rights need to match the plot actually being priced. Utility claims are similarly limited: “utilities on site” does not specify the scope of usable connections or every cost of bringing them into service. An annualised land quotation provides no basis for assuming that engineering works, access arrangements or site preparation are included.
The more recent Nyanyi LD157 description says a PBG building permit is “in process” and presents the location as a tourism zone. Neither statement is the equivalent of an issued parcel-specific permission for a proposed building. Bali's official TARUBALI information service explicitly says its broad spatial information is not a permit and points users to the applicable local RDTR detail for plot-level decisions. Indonesia's PP No. 18/2021 sets a national framework for land rights and registration, but it cannot validate the surveyed boundary, private renewal clause or road entitlement of these particular listings.
There is a final obstacle to shortcuts: FIRST Property indicates approximate map locations and says it provides exact addresses on contact, with the displayed map circle spanning about 300 metres. Assigning precise coordinates or a zoning designation to a specific plot from that circle would overstate the evidence. Only an identified parcel can be assessed against its actual access, terrain and planning documents. A cheaper modelled price is therefore a reason to continue comparing, not a declaration that a desired villa can legally or physically be built there.
Bali expert view

In Tabanan, reducing the comparison area from 12.62 gross are to about 9.47 are after shared access raises the effective per-net-are rate by roughly 33.26% without changing the published annualised total. That is why the payable boundary belongs ahead of the headline rate in a serious comparison. A post-access area is still not an approved building footprint, and an attractive lease horizon can mix presently priced years with a renewal that is not yet established as an enforceable payment term. The conflicting indexed versions of LD157 underline another vulnerability: an accurate calculation from an older card is not necessarily a current offer. Our editorial standard is to match the land boundary, base-term calendar and written price first, then assess the selected parcel's access and permitted use on their own evidence.
Sources and check dates
Show sources and methodology5 checked sources+
- FIRST Property — Dalung FP-2026-0040
Published 3.8622-are area, annual quote, 1 Dec 2053 end date and advertised renewal wording; this is a listing, not a contract.
- FIRST Property — Tabanan FP-2026-0041
12.62 gross are, approximately 9.47 net are, the quoted rate, 20 Oct 2058 end date and advertised priority extension.
- Kibarer Property — Nyanyi LD157, earlier indexed version
Older indexed version of LD157: 27 base years at IDR 22m and a proposed 15-year extension at IDR 10.5m per are/year; the old card showed IDR 17.9m and IDR 4,059,720,000. Not proof of a current offer or contract.
- Kibarer Property — Nyanyi LD157, newer indexed version
Fresher indexed revision of the same LD157: 5.4 are, 42 years, IDR 15.9m per are/year and an IDR 3,606,120,000 card amount; the earlier 27+15 pricing split is absent. Not a separate property.
- JDIH BPK — Government Regulation PP No.18/2021
National framework for land rights and registration; does not validate a particular lease, plot, price or renewal entitlement.
Useful next reading
A practical second opinion
Need to check a specific condo?
Send the unit link, price and your goal. We will separate the documented facts from the points that still need a unit-level check.
What to send: link, budget and target date