KEY TAKEAWAYS

What to take away

2 points · about 25 sec

The main ideas to keep in mind as you read.

  1. The final instalment must reconcile the amended contract price with every purchase payment already credited; a developer’s separate line for extra square metres is not, by itself, the amount still due.

  2. Usable floor space, contractual saleable area and the private-property area on a registered condominium title may reflect different boundaries. A correct numerical difference does not establish a physical change to the unit, and a clause allowing price adjustment may still leave separate buyer rights under Thai law.

Why the price agreed at reservation can change at transfer

The developer’s transfer statement arrives with a different balance from the one in your payment schedule. The explanation might be a larger area on the condominium title, a smaller registered unit, or simply a line marked “area adjustment”. None of those descriptions establishes the amount payable. You need to know what floor area was priced under your signed agreement, how the final area was determined, and what the contract says happens when the two differ.

Off-plan transactions often begin with an indicative unit size and a total purchase price supported by a rate per square metre. Once construction and condominium registration have progressed, the Land Department’s records can establish a registrable unit area. A qualifying area-adjustment clause can then change the agreed purchase price. The final instalment is the resulting total less sums already credited to the purchase, not the entire value of the extra square metres shown as a fresh bill. The same logic works when the unit is smaller: a reduction in price first changes the unpaid balance, and might eventually create an overpayment.

An area figure is also a definition, not merely a measurement. Marketing material may describe usable space; an agreement may price a “saleable area”; the condominium title records an area of legally defined private property. Furniture, the internal face of a wall and a balcony can affect how spacious a home feels without resolving which legal boundary is recorded. A discrepancy is worth investigating, but treating every gap between those figures as newly constructed space leads to the wrong calculation.

This issue is most likely to surface before ownership transfer on a development bought during construction. Thailand’s prescribed preliminary condominium sale agreement, commonly called Aor Chor 22, has a provision dealing with post-construction area changes. That does not make the clause universal: the identity of the seller, the transaction structure and the actual executed agreement matter. Neither an online sample nor a developer’s informal revised invoice replaces those documents. Nor should an area adjustment be bundled into transfer taxes, maintenance charges or a snagging dispute; they may affect the amount due at completion, but follow different rules.

Common mistakes and how to fix them

“The first 5% is always free”

What it costsThe buyer budgets against the wrong final balance and may dispute a charge on a false premise.

What to do insteadDistinguish Aor Chor 22’s full-variance calculation from the sample’s excess-only clause, then assess enforceability.

“My usable floor area must equal the title area”

What it costsWalls or a private balcony can be mistaken for a change in the delivered apartment.

What to do insteadMatch the measurement boundaries and private-property components shown on the unit title plan.

“A reduced price means I have been refunded”

What it costsA credit against the last instalment is confused with money actually returned to the buyer.

What to do insteadReconcile payments against the new price and document how any overpayment will be repaid.

QUESTIONS ABOUT THIS TOPIC

A closer look

5 questions · open to read

Practical follow-up questions that go beyond the basics.

Can a partition wall count towards one unit’s registered area?

It can, depending on its classification: Thai rules allocate some non-structural partitions between private units differently from structural perimeter walls treated as common property. A generic floor estimate misses that distinction.

What does a negative final balance mean after the unit becomes smaller?

It means credited purchase payments exceed the revised total under the assumed valid adjustment. The arithmetic suggests a potential refund, but it does not prescribe an automatic transfer or repayment date; the contract, supporting ledger and agreed settlement process govern what happens next.

May a developer invoice using an architect’s revised plan before title registration?

A revised plan may support a provisional estimate, but it is not an issued Aor Chor 2 title. The buyer should be told which record supplies the figure. Whether it can become the final pricing basis depends on the executed agreement and the later registered measurement.

Does signing an area-adjustment clause mean accepting any larger unit?

Not necessarily. The Thai Supreme Court has distinguished an agreement about pricing changed area from a clear waiver of the buyer’s right to reject a substantial excess. The outcome for a new buyer still turns on the executed terms and the applicable condominium-contract protections.

How can two contracts produce different bills for the same three-square-metre change?

The prescribed Aor Chor 22 form prices the full change at the contractual square-metre rate for qualifying off-plan sales. A published private sample adjusts only the portion above a five-per-cent threshold, creating a smaller monetary change. On the article’s hypothetical THB 5 million unit with THB 4 million paid, a three-square-metre increase produces final instalments of THB 1.30 million or THB 1.05 million respectively. These examples explain the maths, not whether the private clause is enforceable in a particular deal.

Which two area figures are actually comparable?

“Saleable”, “usable” and “registered” are not interchangeable labels in a Thai condominium purchase. Usable area usually describes the space an occupant can physically use inside the apartment. Saleable area is a contractual figure: it means whatever the agreement and its attached plans define it to mean. Registrable area concerns the private-property footprint accepted for condominium registration. The registered unit title, issued on form Aor Chor 2 (อ.ช.๒), identifies the particular property interest and its plan. It is not another version of a sales brochure.

That distinction is decisive where the seller’s new number comes from a different source. A revised architect’s schedule or site measurement can be relevant evidence, but it is not automatically the same thing as the area recorded on the title. If registration has not yet taken place, there may be no issued title against which to verify the asserted final figure. A purchaser should be told whether the invoice uses a proposed area, an approved condominium plan or a completed title entry, and when the price becomes final under the agreement.

Thai Land Department rules explain why a tape-measure exercise may produce a smaller figure. For a non-load-bearing partition between two privately owned units, the rules allocate half the wall’s area to each unit. A qualifying non-load-bearing partition between a unit and common property can count wholly towards that unit. Structural perimeter walls classed as common property are treated differently and are excluded. These are title-boundary rules about the classification of specific structures, not an instruction to price every wall in every development the same way.

Balconies require equally careful treatment. A balcony that forms part of the registered private property is depicted as such on the unit title plan and contributes to the total; the presence of a balcony on a marketing drawing is not sufficient proof of that status. The registration guidance describes separate plan depictions for private-property components and a total area recorded to two decimal places. A simple gross-to-net conversion percentage would miss that underlying legal classification.

Consider two perfectly genuine figures for the same home: the clear finished floor area inside the walls and the private-property area shown on its registered plan. Subtracting one from the other measures a change of definition as much as it might measure a change of construction. A more useful comparison keeps the same apartment, the same inclusion rules and the same reference date on both sides. The contract’s unit schedule, the attached drawing and the Land Department plan together reveal whether the disputed space was already contemplated in the purchase price.

This also limits what can be concluded from the sample contracts discussed below. One expressly compares “actual registrable area” with “saleable area”. That wording describes a comparison chosen by the drafter; it does not prove that the two quantities share the same measurement rules for any particular buyer. The legal and arithmetic exercise starts only after that gap has been resolved. Where the definitions remain incompatible, even a flawless percentage calculation cannot establish a final debt.

Document checklist

Complete0 of 8
The agreed starting pointChecklist0 of 3
The final area evidenceChecklist0 of 3
The money trailChecklist0 of 2

Which adjustment formula does the contract actually use?

The prescribed Thai preliminary sale form gives a relatively direct answer to the pricing question. In Aor Chor 22, clause 3.1 records the price per square metre and the total agreed price. Clause 3.2 deals with a condominium that is unfinished when the agreement is made: once construction is complete, an increase or decrease against the specified unit area adjusts the purchase price at the clause 3.1 rate, with the payment amount under clause 4.2 amended accordingly. The Land Department’s published Thai form, attached to the 1 July 2008 ministerial announcement, contains that mechanism. It does not say that the first five per cent of a size difference is free of adjustment.

Now consider a different, publicly available freehold sale agreement hosted on a Phuket property website. Clause 5.3 uses two named quantities, “saleable area” and “actual registrable area”, and gives an adjustment only for the difference in excess of five per cent of the saleable area. For a shortfall, the buyer’s adjustment is deducted from the final payment. For an increase, the seller is granted a corresponding adjustment added to that payment. The per-square-metre price is referred to as “PP/SQM”. The important mathematical feature is that the drafter subtracts the threshold before pricing the remaining area. Crossing six per cent does not, under this wording, suddenly make the entire six per cent chargeable.

The document is a sample, with party details and unit particulars replaced by placeholders. It therefore shows what its words would calculate, not what any named purchaser has agreed or paid. The English wording for a shortfall also says that the error “may give” the purchaser an entitlement, so the exact obligation is not resolved simply by taking a number from this example. Its comparison of registrable and saleable areas would need to be supported by the definitions and annexures of a real executed contract. A persuasive spreadsheet cannot supply missing legal terms.

The developer-published Layan Green Park sample illustrates a third use of the same percentage. Its Thai clause 13.1 provides for a per-square-metre price adjustment reflected in the final instalment and describes variation up to five per cent as permissible. It does not itself provide a complete excess-only pricing formula for changes beyond five per cent. A tolerance on what size can be delivered, a trigger for recalculating money, and an amount excluded from a recalculation are three distinct drafting choices. The words “five per cent” tell you very little until the operative verb and the measuring base are clear.

There is then the question of enforceability. Condominium Act section 6/2 requires the prescribed form for contracts within its specified relationship between the owner of the land and building and a condominium buyer. A part departing from that form to the buyer’s disadvantage is not enforceable under the section. Civil and Commercial Code section 466 deals separately with accepting or rejecting immovable property delivered in a different area. Neither legal test is replaced by an online sample promising a financial tolerance. In a covered developer sale, the excess-only clause cannot be treated as automatically binding merely because its arithmetic is legible.

The comparison below therefore isolates two published calculations, not two validated legal outcomes. It assumes that the parties can genuinely compare areas measured on the same basis, that the hypothetical price per square metre is the correct contractual rate, and that the same amount has already been paid in both models. On those assumptions, the figures show precisely how the wording changes the final instalment. They do not decide whether a buyer must complete the transfer or whether a private deviation from the prescribed form survives Thai law.

One measurement change, two different final balances

Illustrative figures, not a real project: contracted area 50.00 sqm, comparable final area 53.00 or 47.00 sqm (±6%); THB 100,000/sqm; original price THB 5m; THB 4m already paid. The private sample excludes the first 2.50 sqm of variance from its calculation, leaving ±0.50 sqm. Cells show the net final instalment. Enforceability and a buyer’s right to reject are separate questions.

Clause+3 sqm−3 sqm
Aor Chor 22, §3.2THB 1.30mTHB 0.70m
Published 5% excess-only clause, §5.3THB 1.05mTHB 0.95m

How the area adjustment affects the final invoice or refund

A final settlement begins with money already on the ledger. Start with the contractual purchase price, apply whichever area adjustment is legally available, and subtract the instalments and credits that have actually been received for that unit. The balance is the amount still due. A developer may show an extra-area charge as a separate line, but that line should reconcile to the revised total purchase price and the historic payments. Otherwise a buyer risks paying a correct square-metre adjustment on top of an incorrect balance.

The shared example uses an agreed 50-square-metre unit at THB 100,000 per square metre, making THB 5 million in total, with THB 4 million previously paid. The original final instalment is therefore THB 1 million. A three-square-metre increase or decrease is six per cent of the agreed area. Under the prescribed-form calculation, all three square metres affect the price. Under the published excess-only clause, the first 2.5 square metres are excluded from that calculation, leaving only half a square metre to price. The table reports the final amount to be paid in each case, after the existing THB 4 million credit, rather than reporting only the nominal adjustment.

Every balance shown there remains positive. That is a feature of the chosen assumptions, not a guarantee that a smaller apartment only produces a discount on a last instalment. Where earlier payments exceed the new total purchase price, the arithmetic turns negative: the seller may owe money back instead of collecting another instalment. The accounting entry does not itself trigger a bank transfer. A written refund mechanism, a recognised right to repayment and an agreed reconciliation are needed to move from a negative balance to money received. No standard refund deadline can be inferred from these published clauses alone.

Details around the contractual rate matter here. The seller might have offered a discount, applied a reservation deposit against the price or agreed a particular rate for the area adjustment. The correct rate is not necessarily the advertised asking price divided by the brochure’s area, and payments made for unrelated charges should not be casually treated as instalments of the unit price. A credible final statement identifies the relevant contract provision, the original and revised total prices, all credited payments, and the net amount requested or refundable. That resolves the accounting question; a challenge to the legal basis of the charge is a different matter.

When can a buyer challenge the amount or decline to complete?

The developer’s calculation can be arithmetically correct and still be open to challenge. There are two questions to keep separate: did the developer compare the correct areas and apply the agreed rate and credits; and is that clause legally effective in this particular transaction? The first may be resolved by a title plan and a payment ledger. The second turns on the parties’ agreement, the seller’s legal status, the Condominium Act and the Civil and Commercial Code. An emailed total does not answer either question on its own.

Section 466 of the Civil and Commercial Code addresses immovable property sold with an agreed total area. It provides remedies where the delivered area is greater or smaller than promised, while setting a different starting position where the difference does not exceed five per cent. Small discrepancies generally call for acceptance at a proportionate price, subject to an exception where the difference is material enough that the buyer would not have contracted had it been known. Larger discrepancies can engage the buyer’s choice about accepting the property. These are rules about delivery and contractual rights, not an excess-only formula for calculating a developer’s invoice. In particular, the provision does not give sellers a universal five-per-cent band of uncharged area.

The legal picture can change with the drafting. Thai decisions recognise that section 466 may be modified by sufficiently clear agreement between the parties. But Condominium Act section 6/2 overlays a prescribed-contract requirement for the specified category of developer-type sale between the owner of the land and building and the buyer. Buyer-disadvantageous terms inconsistent with that prescribed form are not enforceable under the section. It would be unsafe to apply those conclusions indiscriminately to a resale between individual owners, or to assume that any private sample has survived scrutiny under the mandatory form. The actual seller and the executed documents must be identified.

A particularly relevant Supreme Court decision is 7983/2561, delivered in 2018. The agreements in that case used an area-adjustment clause with substantially the same structure as Aor Chor 22 clause 3.2. The Court held that a general promise to adjust the price per square metre did not clearly exclude the buyer’s right under section 466 to reject units delivered with a substantial excess of area. It illustrates an important distinction: agreeing on how to price a size variation is not necessarily consenting in advance to accept every variation. The decision does not determine whether a differently worded clause in a different transaction is enforceable, nor does it turn the hypothetical six-per-cent comparison into a guaranteed right to unwind a contract.

The older Supreme Court case 975/2543, decided in 2000, involved an apartment originally described as approximately 94.5 square metres but delivered at about 124.48 square metres. The increase was roughly 31.7 per cent, and part of the additional space was an awkward adjacent area of little utility to the purchaser. Good-faith interpretation and the buyer’s original purpose mattered to the outcome. This was before the 2008 prescribed-contract regime, and the facts were markedly different from a small change in an otherwise comparable unit. It is useful legal context, not a settlement precedent for every buyer receiving a revised transfer statement today.

A disagreement should therefore be framed precisely. Is the registered area unsupported? Are different types of floor area being compared? Is the threshold applied to the whole variance or only its excess? Does the executed clause conflict with a mandatory buyer protection? The answers determine whether the next step is a corrected invoice, a better measurement record or advice on a contested right to reject or rescind. Simply withholding a scheduled instalment without addressing notice and default provisions can create a separate problem. The decision path below identifies the missing piece before anyone treats a calculation as consent to transfer or as a legal basis to walk away.

Additional context: decision Tree

Expert view

Mark Erometskiy

The easiest mistake is to get the percentage exactly right while comparing two different kinds of floor area. A unit’s clear internal dimensions may be smaller than the private property recorded on its title without the developer having built a different apartment. Once the measurement basis is established, the signed clause still needs to explain whether the price changes for every square metre or only for an amount beyond a stated threshold. The phrase “5% tolerance” cannot answer that by itself, and a neat final-balance calculation does not settle whether the term is enforceable. The strongest position starts with a traceable title plan, a matching contractual definition and a payment statement that accounts for every credited instalment.

Mark Erometskiy
NovAsia Thailand expert
Expert profile →

Sources and check dates

Sources5
  1. Department of Lands — Ministerial announcement of 1 July 2008 and prescribed condo agreements Aor Chor 22/23 (official Thai PDF)

    Official Thai form in the Land Department circular and its annexures: clauses 3.1, 3.2 and 4.2 establish the area-based price adjustment and instalment mechanism. Publication is from 2008; check any later contractual amendment for the individual sale.

  2. Department of Lands — Condominium Act B.E. 2522 (consolidated Thai text, official-hosted PDF)

    Official-hosted consolidated Thai statute: section 6/1 addresses advertising materials and 6/2 requires prescribed forms for covered sales and invalidates buyer-disadvantageous departures. The scope is not all private resales.

  3. Department of Lands — Condominium registration rules B.E. 2554, unit title (Aor Chor 2), clause 14

    Search-indexed official regulation, clauses 14.1–14.2: certain non-load-bearing walls, labelled private-property components including balconies, and a two-decimal area total. The archived PDF redirected to a 503 page during direct access, so the full original could not be re-read.

  4. Department of Lands — Documents required for condominium registration (public-service guide)

    Government service guidance on floor plans, area descriptions and private versus common property in condominium registration; identifies Aor Chor 2. Does not establish any particular buyer’s measured area.

  5. Department of Lands — reply on outer condominium walls and private/common property, 16 July 2026

    Land Department reply dated 16 July 2026 cites the 2554 regulation and distinguishes structural outer walls from private area; the agency notes that its response is an administrative opinion, not a court ruling.

A practical second opinion

Need help assessing a specific property?

Send the property link, price and your goal. We will separate the documented facts from the points that still need a property-specific check.

What to send: link, budget and target date