PT PMA Capital and Investment Requirements in Indonesia

Nova Asia AI assistant

Let’s explore this page together

How much capital does a PT PMA need?

A formation proposal says the founder must “deposit IDR 10 billion”. Before accepting that number, the finance team needs to know whether it describes share capital, the scale of the proposed business or money that must actually be transferred now. Those are three separate questions.

Under BKPM Regulation No. 5/2025, a PT PMA generally needs at least IDR 2.5 billion of issued and paid-up capital. The standard project investment requirement is greater than IDR 10 billion, with special methods for certain activities. The latter is not a blanket instruction to keep IDR 10 billion in a bank account on incorporation.

The distinction affects both the incorporation documents and the cash-flow forecast. Capital is committed to the company; an investment plan describes the intended business; realized expenditure has to be supported by records as the venture develops.

Authorized, issued and paid-up capital in a PT PMA

Indonesia's incorporation records distinguish three layers of equity. Modal dasar is authorized capital: the nominal value of shares the company is permitted to issue. Modal ditempatkan is issued capital, representing shares allocated to shareholders. Modal disetor is paid-up capital, meaning the contribution for those issued shares has been made. These labels appear in the deed and in the AHU corporate registration process.

Consider a company with IDR 5 billion in authorized capital and IDR 2.5 billion issued and paid up. Two shareholders could hold 60% and 40% of the issued shares, representing IDR 1.5 billion and IDR 1 billion respectively. The illustration explains the relationship between the figures; it does not prescribe a shareholding arrangement or prove that the business qualifies for every activity.

The AHU incorporation guidance applies a minimum 25% issued-capital proportion relative to authorized capital. Foreign-investment companies must also meet the specific PT PMA floor in Article 26(10) of BKPM Regulation 5/2025: at least IDR 2.5 billion of issued and paid-up capital per company, unless another legal provision changes the result. An attractive authorized-capital figure cannot compensate for insufficient paid-up capital.

There are two different forms of evidence here. The notarial deed and AHU entries establish the corporate position: shares, holders and declared capital. Proof of payment establishes whether the contribution was actually made, such as a traceable transfer to the company and corresponding accounting entries. If a contribution is made in a permitted non-cash form, its documentation requires separate consideration.

A founder's personal bank statement is not a substitute for company funding. Once capital is contributed, the company owns those resources and the shareholder owns shares. That separation becomes especially important when someone proposes to transfer the money back to the investor immediately after registration.

IDR 2.5bn in paid-up capital is not the IDR 10bn investment plan

Article 26 contains two tests, and the wording of each threshold matters. Paragraph 10 sets the general issued and paid-up capital floor at IDR 2.5 billion per PT PMA. “At least” includes exactly IDR 2.5 billion. Paragraph 2, by contrast, calls for a project investment value greater than IDR 10 billion under the standard rule, generally excluding land and buildings. Exactly IDR 10 billion does not meet a greater-than requirement.

The capital figure belongs to the legal entity. The project figure generally belongs to a five-digit KBLI business activity at a particular project location. A founder expanding into two activities may therefore encounter several project-level investment assessments without being required to create a separate company for each one. Sector rules can alter this calculation, so the ordinary formula is only a starting point.

Imagine a business planning a facility with equipment, fit-out and infrastructure commitments. Shareholders fund its issued capital; the project budget describes how much investment the proposed operations will involve. Actual payments arrive later as contracts are performed. Some eligible expenditure may be funded from the company's equity, which is why the two headline numbers should not be treated as unrelated cash deposits that must simply be added together.

Equally, a project plan over IDR 10 billion does not establish that IDR 10 billion has already been transferred. An OSS declaration must reflect a genuine business programme, and subsequent reporting has to distinguish planned from realized investment. A high number in an application is not evidence of an acquired asset or a paid invoice.

Proposals still circulate that describe IDR 10 billion as the universal minimum paid-up capital. That description does not match the standard capital floor in Regulation 5/2025. The company's activity, location and any stricter applicable legislation remain essential to the final position.

PT PMA capital vs the project investment plan

A PT PMA may need to satisfy both tests independently. The exact result depends on its activities and locations.

Option 1 of 2

Paid-up capital

Standard minimum
At least IDR 2.5bn per PT PMA
Where recorded
Notarial deed and AHU corporate records
Basis of calculation
Per legal entity unless sector rules say otherwise
Common mistake
Treating company capital as a founder’s personal deposit
Option 2 of 2

Investment plan

Standard minimum
Over IDR 10bn per applicable project unit, subject to exceptions
Where recorded
Project and business-activity records in OSS
Basis of calculation
Generally five-digit KBLI × location; sector-specific exceptions apply
Common mistake
Treating planned project expenditure as an upfront bank deposit

How KBLI codes and project locations change the PT PMA threshold

For the standard PT PMA investment test, an OSS project is more specific than a registered company name. Article 26(2) uses a five-digit KBLI activity and a project location. A single legal entity might operate several projects, while the address on its corporate records does not necessarily identify every place where business will be carried out.

Suppose a founder plans a service operation in Denpasar and a separate activity in Badung. Combining both budgets into one number because they have the same shareholders could misstate the project structure. A second location for the same activity may also require separate treatment under the general test. The result changes where Article 26 provides a special grouping method.

Classification must follow what the company will really do. A proposal described casually as “property services” could involve activities with different legal descriptions and investment treatment. The consequences extend beyond the IDR 10 billion threshold: activity restrictions and licensing obligations may depend on the selected code. A KBLI chosen solely to make the capital presentation look easier is unlikely to survive scrutiny of the actual contracts and operations.

OSS displays the KBLI 2025 classification. Legacy codes and copied incorporation templates should therefore be reconciled with the currently applicable activity descriptions before project values are entered. It is the combination of activity, physical location and any statutory exception that determines the correct investment unit.

Sector exceptions: wholesale, food services, property and land costs

The familiar five-digit-KBLI-by-location formula is the default, not the complete rulebook. Article 26(3) groups wholesale activities by their first four KBLI digits. Construction services also use a four-digit grouping. The investment threshold remains relevant; what changes is how activities are grouped for the test.

Food and beverage services have a different arrangement: the first two digits of the KBLI code are used for a business location, with Article 26(4) specifying the regency or city, or kabupaten/kota, for this purpose. A chain considering outlets across administrative boundaries should not assume that an ordinary project-address spreadsheet gives the correct answer. For manufacturing different products within one production line, the regulation provides another specific method.

Property and accommodation businesses bring land and buildings into focus. The default test excludes those costs, but Article 26(5) changes that treatment for specified activities involving property development, sale or leasing, short- and long-stay accommodation, agriculture, plantations, livestock and aquaculture. A budget that excludes the site cost in every case may be just as misleading as one that includes it in every case.

There is an additional distinction for property development. Under Article 26(6), an entire building or an integrated residential complex is tested against the greater-than-IDR-10-billion amount including land and buildings. Separate property units that do not form an entire building or integrated housing complex are subject to the specified test excluding those costs. The legal structure and configuration of a development are therefore relevant to the arithmetic.

A Bali villa illustrates the classification problem without needing an invented villa budget. Developing a unit for sale, providing accommodation to guests and managing somebody else's property are not interchangeable operating activities. Each may imply a different KBLI and a different approach to land, buildings or the project location. The correct sector test follows the company's actual activity and assets, not the label “villa investment”.

Special economic zones and certain other activities may follow further provisions. Any professional estimate should identify the applicable paragraph of Article 26 and explain why that rule fits the business. A single headline amount without that connection is not a meaningful compliance assessment.

Depositing and using PT PMA capital in the first 12 months

The share-capital entry in a deed establishes the company's declared equity position. It does not by itself show the date, method or documentary proof of the actual contribution. A sound funding trail connects the incorporation documents, company bank account, shareholder payment and accounting records. Payment timing and the treatment of non-cash contributions should be established from the relevant corporate and banking requirements, not guessed from the investment threshold alone.

Article 27 of BKPM Regulation 5/2025 introduces a 12-month restriction on transfers of issued and paid-up capital from the company's account, measured from the contribution date. Crucially, the provision expressly allows transfers for asset purchases, building construction and business operations. It would be wrong to describe the rule as an unconditional requirement to leave the entire capital balance untouched for a year.

The economic distinction is straightforward. A supplier invoice for machinery used by the business is different from moving company money to a shareholder's personal account without an established legal basis. Both transactions reduce the bank balance, but only one may be a properly supported company expenditure. The supporting contracts, approvals and ledger treatment matter as much as the payment description.

Article 27 also refers to a self-declaration when applying through OSS and states that breaching it can lead to administrative sanctions. There is a drafting complication: paragraph 27(1) cross-refers to Article 26(6), which deals with particular property investment calculations, while the general capital floor appears in Article 26(10). That discrepancy should not be silently rewritten into a universal conclusion about every company. Its application calls for case-specific confirmation of the prevailing BKPM/OSS interpretation.

Founders sometimes expect to recycle the contribution immediately after registration and restore it later if requested. That expectation can conflict with the company's own obligations and the purpose of the capital arrangement. Additional shareholder funding, legitimate company expenditure and distributions to shareholders are separate transactions with separate documentary and legal consequences.

Pre-funding checklist for a PT PMA

Complete0 of 9
Before the deedChecklist0 of 3
Before OSS submissionChecklist0 of 3
After fundingChecklist0 of 3

Building a credible PT PMA investment plan for OSS

An OSS investment plan should describe a business that can actually be financed and operated. The largest number on the screen is not necessarily the strongest application. A manufacturing proposal dominated by machinery costs will look different from a food-service operation or a service company with limited physical assets. The underlying activity determines which expenditures are credible and which are eligible for the relevant investment calculation.

The estimate may cover machinery, fit-out, infrastructure, site preparation, eligible setup costs and working capital. Land and buildings need separate treatment under the specific Article 26 rule. Describing every payment as “investment” can distort the total: some costs belong in a different category, and others may not qualify for the threshold being tested. The OSS fields and current official instructions determine how those amounts are recorded.

A finance lead also needs a timetable. Equipment deposits, construction milestones, delivery payments and operational expenditure are unlikely to occur on the same day. The investment value can therefore differ from the cash needed at incorporation and from the amount spent during the first reporting period. This is a planning distinction, not permission to declare expenditure that the company never intends to make.

Where several activities share an office, staff or technical systems, the project allocation deserves a clear rationale. Duplicating a shared asset across multiple KBLI/location budgets merely to make each line pass a threshold would not make the business more substantial. Conversely, omitting costs essential to the stated operation leaves the plan detached from the actual project.

The most useful investment schedule connects the activity code, operating location, cost category, funding source and expected implementation stage. It becomes a basis for later comparison with contracts, payments and investment reporting, instead of a one-off figure entered only to obtain a registration number.

How to evidence PT PMA funding and actual investment

A defensible capital position leaves a trail. The notarial deed identifies the shareholders and declared capital; AHU records establish the registered corporate details. Bank entries and the share-capital ledger then show what was contributed to the entity. These records should tell the same story. A founder's personal proof of wealth, even if genuine, does not close a gap in the company's funding evidence.

Once the project starts, a different evidence set becomes relevant. Supply contracts, invoices, bank payments, acceptance records and fixed-asset accounting support expenditure that has actually occurred. A committed procurement budget is not an acquired machine. An advance payment may be genuine while the corresponding asset has yet to be delivered. The financial records should preserve those distinctions instead of forcing every amount into a single “investment realized” line.

Where LKPM investment reporting applies, actual implementation figures need to reconcile with the underlying documents and the relevant OSS project. A business can legitimately spend money preparing to operate before it has meaningful sales. The absence of early revenue does not establish fraud; nor does it excuse declaring fictional contracts, inflated assets or expenditures that never happened.

Before approving incorporation funding, the founder should have clear answers from the notary on share-capital entries, from the accountant on payment evidence and legitimate uses of funds, and from the relevant licensing adviser on the KBLI/location investment calculation. The Article 27 transfer undertaking needs particular attention because its cross-reference is internally inconsistent. Written answers tied to the real transaction are more useful than a generic assurance that the registration package is “compliant”.

This explanation reflects the official rules available on 9 November 2026 and is not individualized legal or financial advice. The company's selected activities, project locations, funding method and current administrative interpretation can change the result. Significant transfers should be made only on the basis of the actual corporate documents and advice applicable to that company.

Capital and investment red flags

“Just show IDR 10bn in a bank account”

How it works

Paid-up capital and total planned project investment are conflated.

Red flag

No Article 26 basis or KBLI-by-location calculation is offered.

What to do

Request a written breakdown of capital, investment and applicable exceptions.

“We can report investments that exist only on paper”

How it works

A forecast is presented as actual expenditure with no evidence.

Red flag

No contracts, invoices, asset records or bank trail.

What to do

Do not sign inaccurate reporting; verify underlying transactions.

“You can immediately withdraw paid-up capital personally”

How it works

Company money is routed to a shareholder without a defensible basis.

Red flag

Article 27 constraints and legitimate business-use exceptions are ignored.

What to do

Check the legal and accounting treatment before any transfer.

“KBLI and location do not change the threshold”

How it works

One template is used for F&B, wholesale and property businesses.

Red flag

Article 26(3)–(8) exceptions have not been checked.

What to do

Request a sector- and location-specific investment test.

PT PMA capital: common questions

What is the minimum paid-up capital for a PT PMA in 2026?
Article 26(10) of BKPM Regulation 5/2025 generally requires at least IDR 2.5 billion in issued and paid-up capital per PT PMA. The amount belongs to the company's equity structure, not a government incorporation fee or a shareholder's personal bank balance. Sector-specific legislation may change the applicable minimum, so the final figure has to match the company's actual licensed activities.
Do I need to deposit IDR 10 billion when setting up a PT PMA?
IDR 10 billion is not the universal deposit required on opening a PT PMA account. Under the standard rule, a project must have an investment value greater than that figure, calculated using the relevant business activity and location. A proposal calling it an immediate cash deposit needs a written legal and project-level explanation, separate from the share-capital calculation.
Is the investment threshold calculated for each KBLI code and location?
The default test is a five-digit KBLI activity for each project location under Article 26(2). Wholesale, food and beverage services, construction and certain production arrangements have special grouping rules. A business with several sites or codes should map those activities before assuming that each line creates an entirely separate IDR 10 billion test.
Do land and buildings count toward a PT PMA investment plan?
Land and buildings are generally excluded from the standard project threshold. Article 26(5) changes the treatment for specified sectors, including certain property and accommodation activities. For property development, Article 26(6) distinguishes an entire building or integrated housing complex from separate property units, so the applicable calculation cannot be inferred from the word “villa” alone.
Can a PT PMA spend its paid-up capital in the first 12 months?
Article 27 provides a 12-month transfer restriction while expressly permitting spending for asset purchases, construction and company operations. This does not authorize a shareholder to withdraw the contribution personally without a proper legal basis. The provision also contains an inconsistent cross-reference to Article 26(6), making confirmation of the applicable BKPM/OSS interpretation particularly important.
What records support investment figures reported through OSS?
OSS should reflect a project estimate tied to the actual KBLI activities and business locations. Realized investment is supported by bank transfers, agreements, invoices, delivery or acceptance records and asset accounting. Where LKPM reporting applies, the reported implementation figures should reconcile with that evidence; forecasts must not be presented as money already spent.

Read next

Sources5
  1. BKPM / JDIH — Regulation of the Minister of Investment and Downstreaming No. 5 of 2025, official legal recordThe BKPM/JDIH legal register lists Regulation 5/2025 as active, promulgated on 2 October 2025, replacing several 2021 instruments.
  2. BKPM — Regulation No. 5/2025, official Indonesian text, Articles 26–27The official Indonesian text of Articles 26–27 sets the capital and investment tests, sector exceptions and rules on capital transfers.
  3. AHU Online — Pendirian Perseroan, corporate capital fieldsThe AHU incorporation guidance identifies authorized, issued and paid-up share capital, including the minimum issued-capital proportion.
  4. OSS RBA — KBLI 2025 classification and code lookupThe official OSS KBLI 2025 classification supports checking activity descriptions before assigning project codes.
  5. OSS RBA — Official guidance index, including investment reporting workflowsThe OSS guidance directory covers licensing and project workflows; requirements depend on the applicable activity.