2 bedrooms
Primary sale · Leasehold
from 5,400,000,000 IDR
NOBIA DUA is a four-villa development near Nyang Nyang on Bali’s southern Bukit Peninsula.
Nyang Nyang, Desa Pecatu, Kuta Selatan, Kabupaten Badung, Bali, Indonesia (exact plot address not publicly established)

From 5,400,000,000 IDRDeveloper publication · 28 October 2026. We can help you review the published materials. The seller confirms the terms of the selected property.
Photographs from the project’s materials.
The brand may differ from the legal entity in a specific contract. Confirm the seller and the contracting party before payment.
Four individual pool villas make this a residential purchase rather than a large managed estate. Privacy is part of the appeal; shared resort facilities are not part of the substantiated proposition.
The separately stated 40 sqm rooftop is designed around leisure and cooking. Its value depends on usable shade, fittings and the specifications ultimately delivered, not on treating it as indoor floor area.
Senang points to its completed Bingin NOBIA homes, which may help buyers examine craftsmanship firsthand. They remain a separate project, and the new villa must be assessed against its own documents.
The homes are presented for personal stays as well as rental, with independent management offered as an option. The right to operate commercially and the actual economics require property-specific verification.
NOBIA DUA is a four-villa development near Nyang Nyang on Bali’s southern Bukit Peninsula. Each home is advertised with two bedrooms, 135 sqm of constructed area, a separate 40 sqm rooftop terrace, its own pool and an individual plot described as 1.5 are. The proposition is straightforward: a small private house rather than a resort-style estate. The important qualification is that these are not completed homes. Senang Developments markets them during construction, with handover targeted for December 2026. A buyer is committing to both a future building and the legal arrangements that will make that building usable.
The name needs careful handling because there is an older NOBIA project in Bingin. Senang describes that first set of four villas as delivered and sold, and offers it as a show-home reference. NOBIA DUA is the follow-on project on another site in the Nyang Nyang area, not a resale listing at the Bingin address. Holiday-rental platforms also display properties named NOBIA Villas; those listings cannot safely be used as evidence for NOBIA DUA’s exact address, operating history or completed standard. Visiting the original villas may reveal the team's design preferences, but a new building still requires its own specification, inspections and contractual assurances.
There is only one advertised home type. Two bedrooms have private en-suite facilities, the living room is climate controlled and a private swimming pool connects the house to its outdoor space. The rooftop is intended for cooking, barbecues and time outside. That is a coherent arrangement for an owner who wants privacy and room for occasional guests. It is less naturally suited to someone expecting a staffed resort, shared wellness facilities or multiple independent rental units. Nothing in the verified project description establishes a reception desk, communal gym, children’s club or other estate-wide amenities, so those should not be assumed.
The distinction between built area and rooftop area matters more than the headline combined impression. The published 135 sqm figure describes the building, while the additional 40 sqm refers to roof space. Neither should be presented as the villa’s verified net internal floor area. The individual plot is another measure again: the pool, circulation and landscaping all have to fit within it. Senang shows separate plan views for the ground floor, upper floor and alternative roof arrangements, but a marketing diagram is not the same as an agreed room-by-room schedule for a numbered villa. Dimensions, elevations and finishes still need to match the construction contract.
A caption on the developer’s ground-floor plan identifies the living area, kitchen, pool and garden. This supports the picture of an informal, indoor-outdoor home. It does not confirm every detail that becomes significant once someone lives there: usable shaded space during the hottest hours, the kitchen appliance list, terrace waterproofing, drainage, pool safety and acoustic separation between bedrooms and entertaining areas. Rooftop living is attractive precisely because it changes how a compact villa can be used. The roof also needs a clear maintenance and materials specification, especially in a coastal environment exposed to rain, heat and salt air.
The neighbourhood is Nyang Nyang, within the Pecatu area of Kuta Selatan, Badung Regency. Uluwatu is the broader geographic label used in the advertising. Senang describes the villas as two minutes from Nyang Nyang Beach and five minutes from Uluwatu Temple. These are promoter-supplied travel claims, not routes independently measured from a verified gate or parcel. There is an important topographical distinction: Nyang Nyang Beach lies beneath a cliff, and Badung’s tourism material explains that reaching the sand can involve a steep descent. Being close to a cliff edge is not the same experience as living directly on an easily accessible beach.
This part of southern Bali rewards a site visit. Access roads, scooter traffic, slope, parking and walking routes are often more consequential than a broad map pin labelled Uluwatu. With no reliable street address or parcel coordinates confirmed, it would be misleading to quote exact distances from NOBIA DUA to cafés, supermarkets or a particular beach entrance. The neighbourhood may appeal to people who value quieter surroundings and the drama of the southern coastline. Those qualities are not proof that daily errands will be convenient for every household. The entrance road and the final approach to the building should be tested in person before treating the location as a practical fit.
The ocean outlook deserves similar precision. In a public construction update, Senang founder Felix Weerts described going onto the developing roof and seeing water through the greenery from several spots. That is a specific account of what he observed, not a documented promise of unobstructed sea views from every villa. Roof position, nearby trees, future building work and the buyer’s particular lot can all alter the experience. The difference matters for an owner planning to spend evenings upstairs, and even more for someone expecting to advertise a sea-view holiday rental. A view that is important to the price should be recorded against the exact unit.
Senang Developments Bali is the publicly identifiable developer brand. Its website names Felix Weerts as founder and describes a German architectural partner, local site supervision and a main builder called Pak Putu for the NOBIA projects. The previous Bingin houses provide a tangible reference that prospective purchasers can request to see. They do not establish which Indonesian legal entity owns, leases or controls the new land. ZAYARI Developments also lists NOBIA DUA and uses developer-oriented language in its presentation. The relationship between the businesses, their selling authority and the entity that would sign with a purchaser has not been established from the public material.
The stated construction timeline starts with the land lease in July 2025, moves to a November 2025 construction start and ends with a target handover in December 2026. A post from the founder during 2026 reported progress at roughly 40%, while a separate intermediary page refers to 25% without a dependable observation date. Neither figure serves as an October 2026 certified progress report. The project can reasonably be described as under construction on the evidence available, but the actual stage and handover readiness require an up-to-date site inspection, dated works records and clear contractual definitions of completion, defects and delay remedies.
The official asking-price anchor checked on 28 October 2026 is from IDR 5.4 billion. Senang also publishes an approximate euro amount, but says that the agreement is settled in Indonesian rupiah. Another catalogue, Bali Horizon Hub, displays IDR 4.94 billion for the same project, and ZAYARI markets it from €262,000. Those are not interchangeable prices: the specific villa, publication date, taxes, furniture allowance and contractual rights attached to each number have not been matched. The safer reference for a project record is the developer’s named starting price, clearly dated, while the discrepancies belong in the buyer’s open questions rather than being smoothed away.
Senang promotes a temporarily included furnishing and readiness package that it values at €5,000. That is a sales claim, not independently assessed furniture value or a permanent entitlement for every unit. A buyer needs an itemised handover specification: household appliances, kitchen equipment, linen, outdoor furniture, rooftop fittings, pool equipment and lighting should all have an explicit place in the contract if they form part of the price. The earlier Bingin show villa cannot substitute for that schedule. Two homes can share an architectural idea and still vary considerably in materials, fixtures and the quality of the finished details.
The published instalment structure is 10% upfront, 50% at contract, 20% once construction reaches 65%, another 15% at 80%, and the final 5% at handover. The milestones are stated clearly, yet the mechanism behind them is less clear. A substantial contractual payment comes before the later site-progress triggers, so independent certification and consequences for delays matter. It should be evident who receives each transfer, which company is liable to perform, who signs off the building percentages and what happens if a stage is disputed. A staged payment schedule is not, by itself, a protected account or a guarantee that funds can be recovered.
The proposed ownership arrangement is a contractual long lease advertised as 26 years with a further 25-year extension option. This is not direct foreign ownership of Indonesian land under Hak Milik. Nor should it be confused with a registered Hak Pakai interest unless the specific transaction documents genuinely create one. The commercial value lies in the detail: when the first term starts, what title supports the lessor’s authority, whether the rights can be assigned or inherited, and exactly how the extension option can be exercised. An option advertised for another 25 years is not identical to an unconditional second term at an already agreed price.
There is also a timing question peculiar to this development. The developer says the underlying land was leased in July 2025, substantially before the proposed December 2026 delivery. That does not tell us whether a purchaser’s promised 26 years begin at the original land lease, at signing, at handover or under another date specified in a sublease. The answer cannot be inferred from common Bali practice. A local legal review should trace the original landholder, the rights of any intermediate company and the proposed purchaser’s agreement, including extension mechanics and restrictions on rental, transfer and sale of the remaining lease term.
Senang states that the land has a clean title and is free of debt and mortgages. It also markets the site as an Orange Zone where short-stay letting is allowed. Those statements may be testable, but the publicly available evidence reviewed did not include the parcel’s title documents, applicable spatial-use approval or project-specific rental permissions. In Indonesia, the exact land rights and the authorised use matter more than a colour on a promotional map. The building approval known as PBG and the fitness-for-use certificate known as SLF were not available for examination either. Not having seen these documents does not establish that they do not exist.
Rental income is part of the sales pitch, but it needs its own evidence. Senang advertises a net-return illustration of 12.3% based on about 80% occupancy. The published model mentions property-management charges and other recurring costs. It remains a forecast for a new development, not an audited account of guest stays at NOBIA DUA. Actual revenue will reflect nightly-rate variation, seasonality, booking channels, maintenance, vacancy and the cost of replacing furnishings. An investor should also consider the shorter investment horizon that follows from buying a time-limited lease rather than an indefinite interest in land. Rental performance cannot repair an unclear title or an unenforceable extension right.
The developer says owners may appoint one of several management providers or operate the rental themselves. That flexibility may be useful, but no exclusive management agreement or operator-level track record for these new villas was confirmed. Service scope matters: booking acquisition, cleaning, pool maintenance, emergency repairs, guest support and owner statements can be charged or handled very differently. Owners who mainly want personal use face a separate question of who will look after the house when it is vacant. For a pool villa with an outdoor roof, regular maintenance is not an optional extra in either use case.
NOBIA DUA is therefore a plausible shortlist candidate for someone who wants a private two-bedroom pool villa with additional rooftop space in the Nyang Nyang area and is comfortable assessing a property still being built. It offers defined specifications and a prior built reference from the same branded team. The open issues are equally specific: the exact site, contracting entity, documents supporting the advertised lease, planning and building permissions, updated progress and the final specification of a numbered villa. Those are not minor administrative details to resolve after paying a deposit. They determine what the purchaser will hold, when they can use it and whether the proposed terms are enforceable.
The developer advertises a 26-year contractual lease with an option to extend for a further 25 years. The underlying title, commencement date, extension cost and enforceability for a specific villa have not been verified in executed documents.
The publicly described layout has two en-suite bedrooms, an air-conditioned living area, a kitchen, a private pool and a rooftop entertaining space with cooking and barbecue facilities. Senang describes an individual 1.5-are plot for each villa. Net internal area, roof fittings and the outlook from a specific numbered home have not been verified.
The public offer describes one two-bedroom villa format. No independently verified alternative bedroom count or size schedule was found. Plans are shown, but net internal measurements, the final fit-out schedule and individual unit drawings were not available for review.
Each option includes a factual reason for the comparison. Price and availability are confirmed for the selected unit.

Same property type and a close price anchor

Same property type and a close price anchor

Same property type and a close price anchor

Same property type and a close price anchor
8 amenities
Address / landmarkNyang Nyang, Desa Pecatu, Kuta Selatan, Kabupaten Badung, Bali, Indonesia (точный адрес участка публично не установлен)
The district guide explains everyday context. Check the specific unit, price and documents separately.
Bali · 2025
Direct foreign arrivals to Bali and occupancy of star-rated hotel rooms across the island
Bali provincial government, citing BPS · Bali provincial government citing BPS; island-wide arrivals, not this property’s occupancy.
Indonesia · published price index, historical data
2015-Q1 — 2026-Q2 · BIS / Bank Indonesia · 2010=100. Regional housing index, not villa transaction prices or this project’s return.
A short route from daily-life questions to market evidence. Selected for this project’s location and stage; these pages do not verify the project itself.
Build your scenario from the published facts and your choices on this page. Not a rating or a return promise.
Choose a goal; your selections in the widgets below will appear in the summary.
No conditions selected yet. Start with fit criteria, everyday places or the months you plan to stay.
Prepare a request around published unknowns and your conditions. Nothing is sent automatically.
The date belongs to an editorial record, not every individual fact. It does not verify a reviewed contract, legal clearance, current price or unit availability.
Price basis · Discrepancies · Dossier sourcesPrimary sale · Leasehold
from 5,400,000,000 IDR
Guides based on published asking prices. Confirm availability and the price of a specific unit before purchase.
Asking rents at other buildings and developments.
26,000,000–
25,000,000 IDR /month
Senang's stated schedule is 10% upfront, 50% on signing, 20% at 65% construction progress, 15% at 80%, and 5% on handover. The evidence required for milestones, recipient of funds and buyer remedies are not established without the contract.
The card states an expected completion period, not a contractual key-handover date.
Same fixed Bank Indonesia reference snapshot as the catalogue and AI adviser, dated 2026-10-21. Not a live exchange quote; exchange fees and spreads are excluded.
Your own cost scenario, not a predicted delay or a project estimate. Confirm the contractual handover date and conditions for delays in the SPA; blank inputs mean unknown.
The starting amount is the published project price. Adjust the sliders to compare scenarios.
Compare your current inputs with a lower occupancy and higher share of running costs. Set the changes yourself; this is a stress test, not a forecast.
| Year | Gross rent | Running costs | Cumulative net rent | Property value | Total |
|---|
8% potential gross rent, 65% occupancy, 20% running costs and 3% price change are editable examples, not a forecast. Taxes, financing, transaction fees and resale terms are excluded. Occupancy and costs apply to rent, not to the property value.
Enter your own expenses. No market averages are assumed.
Blank fields are unknown, not zero. This is not a full ownership budget: taxes, loan payments, transaction costs and unexpected repairs are excluded unless you include them yourself.
Change rent, occupancy and costs above; public benchmarks are reference points.
The property bar is net rental cash flow divided by purchase price, before tax; it excludes price growth. US Treasury yield is in USD. Inflation shows purchasing-power erosion, not a separate investable return. Risk, taxes, liquidity and currency differ. US CPI source
Under construction. Handover declared for 2026.
Before reserving, check the timeline, payment schedule and buyer protections in the contract.
Verified details and questions to settle before reserving.
9 key facts confirmed; 6 more to verify before reserving.
This is not a project rating.
Tick what describes you — we will show whether this may be a fit. Honest, without gloss.
Your selections are not saved anywhere. This is a decision aid, not an assessment.
Best for: Owners who prefer an independent pool villa and rooftop entertaining space to the services of a large resort development.; Part-time Bali residents who can arrange maintenance and security while the home is unoccupied and do not need permanent on-site hotel staff.; Buyers comfortable with a time-limited contractual land arrangement, provided that title, assignability and extension terms survive independent legal review.; Rental-focused purchasers who can assess licensing, management fees and vacancy under a conservative model rather than rely on the developer's projected yield.; may not suit: Anyone needing an inspected, completed home with established handover documentation and immediate occupation.; Buyers seeking freehold land, an unconditionally guaranteed 51-year term or contractual rental income assurances; none of these has been established for a specific lot.; Households requiring three or more bedrooms, extensive common facilities or uncomplicated level walking access to the beach..
A short, project-specific list. We request these from the developer and go through them with you before any payment.
This keeps the open points in one place. A missing or disputed fact is not treated as a conclusion.
From 5,400,000,000 IDR — Developer publication · 28 October 2026. The price and availability of a specific unit are confirmed with the developer before reservation.
initial payment — 10% under the developer's offer; contract signing — 50%; 65% construction milestone — 20%; 80% construction milestone — 15%; handover — 5%. Senang's stated schedule is 10% upfront, 50% on signing, 20% at 65% construction progress, 15% at 80%, and 5% on handover. The evidence required for milestones, recipient of funds and buyer remedies are not established without the contract.
2026-12. The contractual handover date is fixed in the SPA.
Reviewed: developer materials and public records. We publish no outbound links.

Andrey Balinsky
NovAsia Bali property expert. He will help compare the unit, location, ownership structure and terms before you decide.
Ask about NOBIA DUA →Send the project name, a link or a written offer. We can match the exact property, seller, title route, stage and current unit terms before you decide.
Informational, not a public offer or personal investment, legal or tax advice. Price, availability, payment terms and guaranteed-return/buyback conditions are confirmed per unit with the developer and their contract.