NovAsia
Available by request

Amani Melasti

Amani Melasti is being developed as a boutique hotel on Bali's southern Bukit Peninsula, in Ungasan near the Melasti coastline. That description matters more than the apartment terminology found on some property portals.

Jl. Karma Kandara No. 41, Ungasan, Kuta Selatan, Kabupaten Badung, Bali, Indonesia

Overview of Amani Melasti in Bukit Peninsula

From 2,823,802,000 IDROctober 2026. We can help you review the published materials. The seller confirms the terms of the selected property.

QUICK — 10-SECOND READ

Quick — 10-second read

What it is
Hotel residence
Where
Jl. Karma Kandara No. 41, Ungasan, Kuta Selatan, Kabupaten Badung, Bali, Indonesia · Bukit Peninsula
Stage
Under construction · 2027
Price
From 2,823,802,000 IDRguide price, final by unit
Transparency
7 facts confirmed · 6 to verify
Developer context

Who is behind this project

Developer
TEUS GroupOpen developer profile →
Projects with us
2
Transparency
Based on public sources and project documents

The brand may differ from the legal entity in a specific contract. Confirm the seller and the contracting party before payment.

Why this project is worth a look

Built around hotel operations

The 90-room, five-floor scheme is conceived as a working hotel rather than a block of independent second homes. That gives the project a clear hospitality purpose but makes owner income, personal-use rights and operating expenditure dependent on agreements that have yet to be independently reviewed.

Distinct guest-room categories

TEUS presents compact suites alongside larger layouts and selected pool-access or sky-view experiences. The mix could serve different guest preferences, but an advertised category is no substitute for a numbered room plan, confirmed outlook and verified total or usable area.

A documented build sequence

The developer's dated construction updates describe meaningful progress through structural work into masonry and interior services by September 2026. That is better evidence of activity than a static completion percentage, though it does not replace engineer certification, permits or a binding delivery programme.

Separate development and delivery roles

TEUS is the project promoter, Atmosphera identifies itself as the local construction manager, and Wyndham is the intended hospitality affiliation. Those names are relevant, but purchasers still need to identify the landholding entity, contracting seller, payment recipient and legal operator.

A coastal setting with access questions

The Bukit coastline is an important part of the guest experience, yet nearby ocean views are not the same as effortless beach access. Vehicle routes, cliff topography and hotel transport provisions deserve more weight than unverified claims of a minute's walk to Melasti Beach.

About the project

Amani Melasti is being developed as a boutique hotel on Bali's southern Bukit Peninsula, in Ungasan near the Melasti coastline. That description matters more than the apartment terminology found on some property portals. TEUS Group's published scheme consists of 90 guest rooms across five floors, with hospitality facilities and an intended branded operating model. A purchaser is not simply choosing a flat and deciding whether to find a tenant. The proposition depends on the building opening as a hotel, rooms being marketed to paying guests and the management structure distributing the resulting income under agreed rules. Until it opens, there is no operating record for this particular property. Construction progress can be assessed, but advertised occupancy and return figures remain projections rather than demonstrated performance. The first question is therefore what contractual interest in a hotel room is actually being offered and how that interest will work once guests start arriving.

Read moreShow less

The concept is designed around shorter stays and hotel convenience rather than the independence of a villa. TEUS describes bright interiors, restrained contemporary lines, Balinese-inspired materials and large windows. The individual rooms are part of a larger service environment: restaurant, reception, pools, spa and maintenance teams will influence how guests experience the property. They will also create ongoing costs. Buyers comparing advertised prices should look at the actual room specification, furniture, equipment, any terrace entitlement and the arrangement for replacing worn furnishings. A furnished hotel room may be easier for an operator to place on the market than a bare apartment, but the same arrangement can limit an owner's freedom to renovate or operate independently. Those limits depend on the sale and management agreements, neither of which should be assumed from architectural illustrations.

The developer publishes an overall room-size range of 27–71 sqm. Three named examples on its website are a 30 sqm Lagoon Suite, a 36 sqm Harmony Suite and a 64 sqm Melasti Sky View Suite. The larger type is presented as a two-room arrangement, with the product description referring to a living area and terraces. That does not prove that the full set of rooms is for sale today. Third-party listings use additional sizes such as 25, 32, 33, 40 and 65 sqm; some may refer to particular sale units, while others appear to follow a different inventory sheet. We have not treated those entries as one definitive floor-plan schedule. For a purchase, a numbered unit plan should state the net area, any exterior area included in the marketed figure, floor position, aspect, finish and furniture package. A room's view and pool access can matter as much as a few extra square metres.

The location can be placed more accurately than 'near Uluwatu'. Listings position the building on Jalan Karma Kandara in Ungasan, within Kuta Selatan in Badung Regency. One selling agency specifies No. 41; we have not located a primary land plan confirming that street number against the development parcel. Two unrelated property sites publish effectively matching map coordinates, providing a credible approximate project pin, but not a surveyed boundary. This distinction is useful in the Bukit area, where a road frontage, vehicle turning space and drop-off access can shape how a hotel functions. A cadastral reference and land certificate would be more meaningful evidence of the site than a location marker copied into an online listing. The plot's access rights and the arrival route for taxis, staff and deliveries deserve consideration alongside the ocean views.

The name Melasti can also create a misleading expectation about walking to the beach. TEUS has described the development as approximately 250 metres from the ocean, while other portals refer to a 400–450 metre coastal distance and a longer route to Melasti Beach itself. These measurements do not describe the same thing. The Bukit shoreline has cliffs, changes in elevation and roads that rarely follow a straight line to the sand. We would not assume a dedicated path, a private beach right or a one-minute walk. For a hotel guest carrying beach equipment or returning after dinner, practical transport may be more relevant than a straight-line distance. The value of this setting lies in access to southern Bali's coastal landscape and visitor destinations, not a verified beachfront title or unrestricted beach entrance.

The planned shared facilities are a substantial part of what guests will be paying for. TEUS lists a courtyard swimming pool, rooftop infinity pool, panoramic terrace, restaurant, spa and fitness area. The local construction partner, Atmosphera Group, also refers to a rooftop bar and dedicated workspace. Those facilities can give a small hotel a fuller hospitality offering, although no facility should be regarded as operational before handover and commissioning. Each shared space carries a maintenance obligation: pool treatment, elevators, air-conditioning, fire systems, kitchen services, staffing and periodic refurbishment. Owners need to know where these costs sit in the operating accounts. A building may achieve respectable room revenue while distributing considerably less after management fees, marketing costs and reserves. A brochure's amenities list is not a substitute for an owner's budget or transparent expense reporting.

The Wyndham association is central to the project's positioning. TEUS Group announced a memorandum of cooperation with Wyndham Hotels & Resorts in February 2025 and has continued to market the building as a Wyndham-affiliated hotel. The intended benefit is understandable: access to professional hospitality standards, booking channels and an established brand environment. However, brand affiliation and a binding owner-level revenue entitlement are separate matters. The full hotel management or franchise contract has not been independently reviewed here. Buyers should establish the exact contracting operator, duration, management fees, performance obligations, permitted owner stays, termination provisions and what happens if the branding arrangement changes. It would be premature to treat Wyndham's name as a guarantee of occupancy, profit or continued operation under the same flag for the entire investment period.

A useful distinction also emerges between the property developer and the local construction team. TEUS Group publicly identifies Amani Melasti as its project. Atmosphera Group says it works with TEUS as the on-the-ground general construction manager, coordinating contractors and supervising delivery. Some property databases classify Atmosphera as the developer, which blurs the roles rather than proving a different project. Neither a recognised international group name nor a construction manager's portfolio establishes the legal entity signing a room purchase contract. The Indonesian company holding the land interest, the party granting the buyer's contractual rights and the entity receiving payment must be identified in the actual paperwork. When these are different entities, their relationships should be documented. TEUS's public history is a starting point for research, not proof that a particular Bali seller has clear title or sufficient funds to complete the works.

Unlike a speculative project supported only by renders, Amani Melasti has a sequence of dated construction reports. TEUS documented structural slabs and vertical works in early 2026. Its update issued on 13 October 2026, covering September, reported completion of building masonry, a finished demonstration room, the start of electrical work within rooms, and plastering and floor-screed activities. It also outlined planned air-conditioning and fire-safety installations for October. These reports give a more concrete picture than an undated percentage-complete indicator. They are still the developer's statements and have not been matched to an independent engineer's certificate or payment milestone certificate. A completed mock-up room does not mean that all guest rooms are finished, tested or ready for guests. The hotel remains a construction-stage purchase, with commissioning and operational handover ahead.

Most sales portals point to 2027 as the anticipated completion year, but they disagree on timing: second-quarter and third-quarter 2027 estimates both circulate. They should be treated as sales-stage targets rather than verified opening dates. Completion of works, legal acceptance of the building and opening of the hotel booking operation can take place at different times. For an investor, that difference can have a real cash-flow effect. There may be a substantial interval between paying an instalment and receiving the first rent distribution. A completion deadline matters only if the agreement explains what counts as delivery, who certifies it and what remedies are available for delay. We have therefore not presented a specific quarter as an established commitment from TEUS Group. The latest progress update confirms activity, not a contractual handover date.

On 20 October 2026, the official TEUS page advertised an entry price from USD 157,000. That is a useful developer-published anchor, not an individually verified available room. Balinsky has displayed particular October 2026 listings below that amount, and other portals carry even lower figures from different publication cycles. Without a current signed inventory sheet, no single lowest figure can responsibly be described as the market-wide minimum today. Prices may differ by floor, outlook, room class, payment schedule and package inclusions; listing data also contain apparent transcription errors. The full acquisition cost may include transaction expenses, taxes, furniture reserves and other payments not visible in the headline. Someone comparing this hotel room with a leasehold villa should use the same cost basis for both, not compare one all-in budget with the other's promotional price.

Published payment terms are similarly inconsistent. One agency describes an initial payment of 25% followed by instalments across construction. Another portal offers several differently weighted programmes, while a third lists milestone-based payments and a separate booking contribution. We have not found an executed buyer contract confirming that any one of these is the standard TEUS plan now in force. The issue is not simply how small the initial payment can be. A buyer needs clarity on the recipient account, evidence required before further payments, the consequences of delayed works, the rules for cancellation and any amount described as non-refundable. Some programmes can result in most of the price being paid long before the hotel is earning revenue. A schedule that sounds convenient can therefore transfer substantial delivery risk to the buyer unless its safeguards are explicit and enforceable.

The prospective rental model must be judged on net cash distributions, not a headline annual return. TEUS promotional material mentions potential yields of 14–18%, but Amani Melasti has no completed operational year from which such a return could be validated. A workable forecast would require assumptions for average room rate, paid occupancy, seasonal changes, booking commissions, payroll, utilities, repairs, insurance, taxes and the reserve for replacing furniture. Equally important is the method used to allocate revenue: an individual room-accounting system and a common rental pool can produce different outcomes and different incentives. We have not seen the binding policy that would settle that question. Independent resort management can reduce an owner's day-to-day workload, but it does not remove vacancy, operator performance or cost inflation risk. Brand standards may improve consistency without eliminating those commercial variables.

Legal tenure is still a material open item. Several brokers describe a 30-year leasehold arrangement, and at least one advertises a further 30-year extension. No executed lease, underlying land title or project-specific legal opinion has been available for review. Under Indonesian law, Hak Milik land ownership, Hak Pakai use rights, Hak Guna Bangunan building rights and contractual sewa are different legal concepts. Government Regulation No. 18 of 2021 deals with land and apartment rights, including conditions affecting foreign buyers, but it does not mean that any room advertised as an apartment is automatically a separately registrable residential title. For this hotel product, the seller must establish what is conveyed to the buyer, how the room is identified, when the contractual term starts, whether rights can be transferred or inherited and how renewal would actually work. A marketing phrase such as '30 plus 30' is not proof of an unconditional extension.

Building approvals require a different set of evidence. Indonesia distinguishes the building approval known as PBG from the SLF certificate confirming a completed building's suitability for use. Atmosphera's older project page said it was assisting with the PBG process; later brokers have published conflicting 'in process' and 'obtained' statuses. We have not independently examined a numbered PBG or a project-specific SLF. Neither a contractor's insurance announcement nor an active building site resolves this. The legal ability to operate a hotel may also depend on the land's permitted use and relevant business licences, which a coloured tourism-zone tag on a sales platform cannot establish by itself. These are documentary questions, not grounds to assume something is missing. However, they should be answered before a buyer treats promised handover or future hotel revenue as secure.

Amani Melasti consequently makes the most sense as a future managed-hospitality asset whose terms still need close inspection. The identifiable location, room concept, declared development team and regularly reported building works are meaningful starting points. The unknowns are equally important: which legal interest is transferred, the permit record, actual opening conditions, the binding Wyndham relationship, owner use and net distribution mechanics. Buyers who want a finished personal residence may find the restrictions and waiting period unsuitable. Those deliberately seeking exposure to hotel operations can compare this project with existing hotels or other managed residences, provided they use evidence and signed obligations rather than projected returns as the basis of the decision.

Unit types & sizes

Lagoon Suite hotel room
30 sqm

One of the room examples published by TEUS Group. The developer's concept includes selected pool-access accommodation, but a buyer should identify the exact room position, access arrangement, terrace treatment and furnishing specification from the unit plan rather than assume they apply to every Lagoon Suite.

Discuss floor plans and prices
Harmony Suite hotel room
36 sqm

A larger single-room format shown on the official project page. Its marketing name does not establish the floor, view, net internal area or whether outdoor space is counted. Layout and usable space matter more than comparing a square-metre figure in isolation.

Discuss floor plans and prices
Melasti Sky View Suite, two-room configuration
64 sqm

TEUS presents this as a two-room configuration and describes its larger sky-view accommodation with a living area and two terraces. Exact outlook, outdoor measurements, room count and current sale inventory must be checked for the identified unit, not inferred from the category name.

Discuss floor plans and prices
✦ Similar projects

Comparable projects in the same city

Each option includes a factual reason for the comparison. Price and availability are confirmed for the selected unit.

Facilities

9 amenities

Pools and terraces

  • courtyard swimming pool
  • rooftop infinity pool
  • panoramic terrace

Wellness and fitness

  • spa centre
  • fitness area

Dining and social spaces

  • restaurant with outdoor terrace
  • rooftop bar

Work and hotel services

  • dedicated workspace
  • planned hotel-managed service model

Location

  • Ungasan, within the Melasti coastal area on southern Bukit, Badung Regency.
  • Jalan Karma Kandara is the consistent road reference; a seller lists No. 41, pending parcel-document confirmation.
  • The nearest coast is cliff-lined, so road access to Melasti Beach matters more than a straight-line distance.
  • The approximate map point is supported by two matching third-party pins, not a certified land survey.

Address / landmarkJl. Karma Kandara No. 41, Ungasan, Kuta Selatan, Kabupaten Badung, Bali, Indonesia

The map loads from OpenStreetMap on request.

The circle shows the project’s approximate location; we confirm the exact address and the plot boundaries when you get in touch. © OpenStreetMap contributors.

District context

About this district

The district guide explains everyday context. Check the specific unit, price and documents separately.

YOUR DECISION

What this project means for me

Build your scenario from the published facts and your choices on this page. Not a rating or a return promise.

Choose a goal; your selections in the widgets below will appear in the summary.

No conditions selected yet. Start with fit criteria, everyday places or the months you plan to stay.

NEXT STEP

Resolve questions before booking

Prepare a request around published unknowns and your conditions. Nothing is sent automatically.

Data freshness and provenance
Latest recorded source / material check
Price
Published reference from project materials
Open items in the discrepancies section
3

The date belongs to an editorial record, not every individual fact. It does not verify a reviewed contract, legal clearance, current price or unit availability.

Price basis · Discrepancies · Dossier sources
LOCATION CONTEXT

The area in useful numbers

Tourism context≈ 6.9 million

direct foreign arrivals to Bali in 2025

Provincial government citing BPS; not occupancy of this property
TRAVEL DEMAND

Tourism in the wider destination

Bali · 2025

Direct foreign arrivals≈ 6.9 million

Visitor flow month by month

Direct foreign arrivals to Bali and occupancy of star-rated hotel rooms across the island

Jan502,20556.7% hotel rooms
Feb492,28955.4% hotel rooms
Mar472,07052.5% hotel rooms
Apr553,32857.9% hotel rooms
May578,25161.2% hotel rooms
Jun605,01364.9% hotel rooms
Jul697,80967.3% hotel rooms
Aug685,99468.2% hotel rooms
BPS Bali · observed months 2026-01–2026-08; not a multi-year seasonal norm or occupancy of a private rental.

Bali provincial government, citing BPS · Bali provincial government citing BPS; island-wide arrivals, not this property’s occupancy.

MARKET DYNAMICS

How housing prices have changed

Indonesia · published price index, historical data

Index now168.5
Last 12 months+0.7%
Since 2015+23.7%
Average per year+1.9%
134152.51712015202020262026-Q2168.5

2015-Q1 — 2026-Q2 · BIS / Bank Indonesia · 2010=100. Regional housing index, not villa transaction prices or this project’s return.

READ BEFORE DECIDING

What should I read about this choice?

A short route from daily-life questions to market evidence. Selected for this project’s location and stage; these pages do not verify the project itself.

Near the project

Landmarks around the project, from open maps (OpenStreetMap):

Karma Beach Bar453 mBar or club
Sundays Beach Club495 mBeach club
Savaya Bali1486 mBar or club
Warung Sunny1811 mRestaurant
Alfamart2468 mStore
Indomaret2472 mStore
Indomaret2499 mStore
Circle K2648 mStore
Indomaret2658 mStore
Alfamart2684 mStore
Bali Buda Bukit2719 mRestaurant
Alfamart2821 mStore
Circle K3150 mStore
Indomaret3182 mStore
Pandawa Beach3336 mBeach
BATU3404 mRestaurant
Roosterfish3777 mCafe
Garuda Wisnu Kencana Cultural Park3884 mAttraction
Abandoned aircraft3926 mAttraction
smoothie shop3965 mCafe
Indomaret4074 mStore
Kimia Farma4122 mPharmacy
Alfamart4155 mStore
Circle K4230 mStore
Indomaret4342 mStore
Chatime4370 mCafe
Guardian4372 mPharmacy
Alfamart4381 mStore
KBTR4415 mRestaurant
Circle K4502 mStore
Indomaret4502 mStore
Pasar Alas Kusuma Uluwatu4581 mStore
Nunggalan Beach4712 mBeach
Indomaret4919 mStore
Alfamart4940 mStore

Distances are straight-line from the project, not walking routes — the real route is longer. © OpenStreetMap contributors.

Market snapshot

Prices by layout

Studio

Primary sale

645,992 AED

Advertised area 32 m²Price per m² 20,187 AED

Studio

Primary sale

576,582–645,992 AED

1 bedroom

Primary sale

697,775–969,540 AED

Advertised area 45–63 m²Price per m² 15,092–16,433 AED
All layouts and terms 6

1 bedroom

Primary sale · Leasehold

from 157,000 USD

1 bedroom

Primary sale · Leasehold

157,000–159,900 USD

Type to confirm

Primary sale

from 157,000 USD

Guides based on published asking prices. Confirm availability and the price of a specific unit before purchase.

Comparable properties

Rents at comparable properties

Asking rents at other buildings and developments.

Condo · 1 bedroom

18,000,000 IDR /month

Observations · 1

Townhouse · 2 bedrooms

18,000,000 IDR /month

Advertised area 84 m²Observations · 1
All rental comparables

Villa · 2 bedrooms

35,000,000 IDR /month

Advertised area 372 m²Observations · 1

Price & purchase terms

  • Published price reference: From 2,823,802,000 IDR
  • Expected completion: 2027
BEFORE HANDOVER

What could waiting for the keys cost me?

The card states an expected completion period, not a contractual key-handover date.

Announced completion target2027
Currency of your expenses
3 months—
6 months—
12 months—

Same fixed Bank Indonesia reference snapshot as the catalogue and AI adviser, dated 2026-10-21. Not a live exchange quote; exchange fees and spreads are excluded.

Your own cost scenario, not a predicted delay or a project estimate. Confirm the contractual handover date and conditions for delays in the SPA; blank inputs mean unknown.

INVESTMENT

Investment return calculator

The starting amount is the published project price. Adjust the sliders to compare scenarios.

Net rent over the period
Value at exit
Total before sale costs
Test a bad rental year

Compare your current inputs with a lower occupancy and higher share of running costs. Set the changes yourself; this is a stress test, not a forecast.

Your net rent per year
Bad-year net rent
Difference per year
The property price, taxes, financing and sale are not recalculated here. A negative result is possible when expenses exceed rent.
Show the calculation by year
YearGross rentRunning costsCumulative net rentProperty valueTotal

8% potential gross rent, 65% occupancy, 20% running costs and 3% price change are editable examples, not a forecast. Taxes, financing, transaction fees and resale terms are excluded. Occupancy and costs apply to rent, not to the property value.

OWNERSHIP COSTS

What does an empty property cost?

Enter your own expenses. No market averages are assumed.

Per month from entered costs—
Per year from entered costs—

Blank fields are unknown, not zero. This is not a full ownership budget: taxes, loan payments, transaction costs and unexpected repairs are excluded unless you include them yourself.

ALTERNATIVES

What else can you compare it with?

Change rent, occupancy and costs above; public benchmarks are reference points.

Property net rental scenario4.2%
after occupancy and running costs; adjust above
US Treasury, 1 year4.5%
USD · 2026-10-21
US inflation, purchasing-power erosion-3.7%
USD · 2026-09

The property bar is net rental cash flow divided by purchase price, before tax; it excludes price growth. US Treasury yield is in USD. Inflation shows purchasing-power erosion, not a separate investable return. Risk, taxes, liquidity and currency differ. US CPI source

Under construction

Project stage — what we know

Under construction. Handover declared for 2027.

Before reserving, check the timeline, payment schedule and buyer protections in the contract.

  1. Planned
  2. Building
  3. Done
Checked by NovAsia

What we know

Verified details and questions to settle before reserving.

7confirmed key facts
6to confirm before bookingConfirm these points before reserving a unit.

7 key facts confirmed; 6 more to verify before reserving.

This is not a project rating.

At a glance

DeveloperTEUS Group
LocationJl. Karma Kandara No. 41, Ungasan, Kuta Selatan, Kabupaten Badung, Bali, Indonesia
CategoryHotel residence
SubtypeHotel residence
ConstructionUnder construction
Units90
Honest fit

Is this project right for you?

Tick what describes you — we will show whether this may be a fit. Honest, without gloss.

Likely yes if
May not suit if

→ Discuss with a consultant

Your selections are not saved anywhere. This is a decision aid, not an assessment.

Best for: Someone deliberately looking for a hotel-linked room investment rather than a standalone residence. The operating agreement, net distributions and limits on owner stays will be at least as relevant to that person as finishes or ocean views. A conventional holiday renter may prefer the flexibility of booking accommodation only when needed.; A construction-stage buyer with sufficient liquidity and patience to accommodate delays between payment, completion, certification and initial income. The published build updates are informative but cannot remove the possibility of additional costs or late opening. A realistic plan leaves room for that uncertainty.; An investor prepared to test the proposed international-brand operating model against evidence. Wyndham affiliation is a feature of the marketed concept, not a replacement for an executed management agreement or realistic hospitality accounts. This buyer is interested in the actual revenue waterfall and the ability to exit the position.; A Bali visitor who understands Ungasan and the Bukit road network, appreciates the area's coastal character and would accept hotel rules around personal occupation. Room-use entitlements, reservation priority and guest-facing facilities should all be confirmed before relying on the property as a personal retreat.; may not suit: Buyers needing a completed, immediately usable home or a documented track record of rental distributions. The building remains under construction and this hotel has no realised operating performance.; Anyone seeking straightforward perpetual personal ownership of Balinese land. The public sales material instead points to a lease-based arrangement whose actual title and contract have not been independently checked.; Investors who require a guaranteed return, unrestricted owner occupation or an unconditional renewal right. None of those promises has been established through an inspected project-specific agreement..

What we confirm before booking

A short, project-specific list. We request these from the developer and go through them with you before any payment.

  • Sales platforms describe a 30-year contractual lease and, in one case, a potential additional 30 years. The executed lease, start date, land title and extension wording have not been inspected; the binding hotel operator agreement is also unavailable for independent review.
  • Published PBG status conflicts: the local construction manager previously discussed obtaining it, while agents have shown both 'in process' and 'issued'. No numbered PBG, SLF or parcel-specific proof of permitted hotel use has been examined.
  • TEUS advertised from USD 157,000 on 20 October 2026; some portal prices are lower. Completion estimates vary between Q2 and Q3 2027, and several sales databases incorrectly show eight units instead of the developer's 90. Current inventory and contracted handover remain unverified.

Disputed and unknown information

This keeps the open points in one place. A missing or disputed fact is not treated as a conclusion.

  • Sales platforms describe a 30-year contractual lease and, in one case, a potential additional 30 years. The executed lease, start date, land title and extension wording have not been inspected; the binding hotel operator agreement is also unavailable for independent review.
  • Published PBG status conflicts: the local construction manager previously discussed obtaining it, while agents have shown both 'in process' and 'issued'. No numbered PBG, SLF or parcel-specific proof of permitted hotel use has been examined.
  • TEUS advertised from USD 157,000 on 20 October 2026; some portal prices are lower. Completion estimates vary between Q2 and Q3 2027, and several sales databases incorrectly show eight units instead of the developer's 90. Current inventory and contracted handover remain unverified.

FAQ

What does a unit cost in Amani Melasti?

From 2,823,802,000 IDR — October 2026. The price and availability of a specific unit are confirmed with the developer before reservation.

When is Amani Melasti due for completion?

2027. The contractual handover date is fixed in the SPA.

Sources4
  1. Developer's official site — Document: teus-group.com/amani-melasti checked 2026-10-20
  2. Developer's official site — Document: teus-group.com/ru/news/amani-melasti----september-2026 checked 2026-10-20
  3. Developer's official site — Document: teus-group.com/news/amani-melasti-construction-progress----may-2026 checked 2026-10-20
  4. Developer's official site — Document: teus-group.com/news/teus-group-signs-memorandum-cooperation-wyndham-hotels-resorts checked 2026-10-20

Reviewed: developer materials and public records. We publish no outbound links.

Read next

Related

Andrey Balinsky — Bali property expert

Andrey Balinsky

NovAsia Bali property expert. He will help compare the unit, location, ownership structure and terms before you decide.

Ask about Amani Melasti →

Need help with a specific project?

Send the project name, a link or a written offer. We can match the exact property, seller, title route, stage and current unit terms before you decide.

WhatsApp Telegram Contacts

Informational, not a public offer or personal investment, legal or tax advice. Price, availability, payment terms and guaranteed-return/buyback conditions are confirmed per unit with the developer and their contract.