Kingston Royale
Kingston Royale is an under-construction, 36-storey condominium with 310 residences on Street 69BT in Boeung Tompun, southern Phnom Penh.
Phnom Penh · Mean CheyBased on developer material
renderFrom $45,662Per broker listings, October 2026. Current price list, layouts and availability — discussed one-to-one with a project specialist
Quick — 10-second read
- What it is
- Condominium
- Where
- Plot 427, Street 69BT, Kbal Tomnup Village, Sangkat Boeung Tumpun, Khan Mean Chey, Phnom Penh, Cambodia · Phnom Penh
- Stage
- Under construction · 2027
- Price
- From $45,662guide price, final by unit
- Transparency
- 11 facts confirmed · 7 to verify
Gallery
Visuals from the project’s materials. The built result and the finishes can differ.
Comparable projects in the same city
Each option includes a factual reason for the comparison. Price and availability are confirmed for the selected unit.

PS Crystal Condominium
Same district; a different housing format

R&F City
Same district; a different housing format

RF Miro
Same district; a different housing format

HNH Central
Same district; a different housing format
Who is behind this project
- Developer
- Kingston EstatesPrivate companyOpen developer profile →
- Projects with us
- 2
- Transparency
- Public records and project documents are used for checking
Brand ≠ the legal entity signing your contract. This project may use a separate project company or joint venture — verify the seller and developer for the selected unit.
Why this project is worth a look
A focused unit mix
The project contains 310 apartments across a broad set of one- and two-bedroom layouts rather than mixing condos with villas, hotel rooms and unrelated products. That makes floor, size and budget comparisons relatively straightforward. The trade-off is equally clear: the published standard mix does not offer a large three-bedroom family apartment.
Amenities above the homes
The wellness facilities are positioned high in the tower, with the fitness level on Floor 33 and the pool and sky garden on the roof. That keeps many shared uses away from the main residential floors and gives the common areas city views. Buyers should still consider lift demand and the long-term cost of maintaining technically intensive rooftop facilities.
Construction-stage payments
Several current sellers show monthly payments of around 1% of the price during construction, with a meaningful balance left for handover. That can reduce the early cash requirement, but it moves an important financing decision into the future. Buyers need to know how that balance will be funded and what contractual milestone actually triggers it.
A direct foreign-title route
Cambodian condominium law provides a direct ownership route for qualifying foreign buyers through a strata title, subject to floor restrictions and the building-wide foreign quota. This is more transparent than trying to obtain indirect control of land, but the selected unit's eligibility and the project's registration documents still need to be checked before signing.
About the project
Kingston Royale is an under-construction, 36-storey condominium with 310 residences on Street 69BT in Boeung Tompun, southern Phnom Penh. Kingston Estates' official website confirms the building scale, unit count and core facilities, while several major agencies identify KR Kingston Royale Co., Ltd. as the project developer. The mix is dominated by one- and two-bedroom apartments. This is an urban condominium rather than a resort or villa compound, so the practical case for buying it is closer to city living, long-term rental use or purchasing during construction.
One of the most important details is the way unit size is presented. Sales material often quotes gross areas for Types A–K, ranging from roughly 43 to 84.7 sqm. Other current listings publish smaller internal or net figures for the same layouts, from about 33 sqm for the compact Type K to about 65.2 sqm for the largest Type A. Those numbers should not be blended into one range. They appear to use different measurement bases, which means price-per-square-metre comparisons are only meaningful once the SPA and plan define exactly which area is being sold and what that area includes.
Read moreShow less
Construction is visibly active rather than merely announced. Major project profiles were reporting roughly 38–40% progress in September 2026, while a July construction update recorded concrete work reaching the 16th floor and MEP work progressing on lower floors. The schedule needs more care. A number of sellers describe Q4 2027 or December 2027 as the completion target, but IPS Cambodia and CambodiaProperty.asia place handover in Q1 2028, with IPS showing 1 April 2028. For a buyer, the meaningful date is not a marketing completion label but the contractual event that allows inspection, possession and title processing.
The building has a straightforward city-condo amenity package: three lifts, seven car-parking levels, separate motorbike parking, a lobby and convenience shop, plus a fitness and wellness level and rooftop pool and sky garden. These are useful facilities, but they also create recurring operating costs. Current listings quote management fees around USD 0.90 per sqm per month and car parking around USD 40 per month. The buyer should establish which area is used for the fee calculation, what the charge includes, whether reserve funding is built in and how tariffs may change once the building is operational.
For a foreign buyer, the legal route is potentially more direct than for landed property. The project is marketed with strata-title ownership for individual apartments. Cambodia's 2010 foreign-ownership law allows legally qualified foreigners to own private units in co-owned buildings above the ground level, while excluding ground and underground floors. Sub-Decree No. 82 caps aggregate foreign ownership at 70% of the total surface area of the building's private units. That makes the word 'freehold' only the starting point: the selected unit's floor, the remaining foreign quota by area and the registration documents still matter.
Pricing also needs to be read at unit level. In early October 2026, the IPS Cambodia project profile showed a lower market anchor from USD 45,662, while other active sources were generally advertising entry points around USD 48,000–55,000. Individual prices depend on layout, floor, down payment and discount campaign. The development is being sold with flexible instalment structures, so a headline price may be tied to a particular payment route. A useful comparison therefore looks at the post-discount unit price, the actual internal area, cash required before handover, the balance due at handover and the cost of any developer financing.
Kingston Royale is therefore not a project that can be reduced to a simple 'cheap Phnom Penh condo' label. The decision turns on four concrete questions: whether Street 69BT and the Boeung Tompun side of the city suits the buyer, whether the gross-versus-net area difference is acceptable, whether the construction timeline into late 2027 or early 2028 fits the buyer's plans, and whether the chosen unit can be registered to that buyer under the foreign-ownership rules. If those points work, the project offers a broad range of compact city layouts. If the priority is immediate occupancy, a larger family home or a payment structure with no meaningful handover balance, there are reasons to compare completed alternatives.
The developer story deserves to be separated into two layers. Kingston Estates presents itself as a Cambodian family-run group with more than 15 years of experience and nine completed projects, and its website displays Kingston Residence, Kingston Suites, Residence H and the L Residence series alongside Kingston Royale. That is useful background, but it is not the same thing as an independently verified nine-project delivery record. Major agencies consistently identify KR Kingston Royale Co., Ltd. as the developer of this specific building. For due diligence, the brand track record and the contracting entity are therefore different questions: reputation may sit with the wider portfolio, while payment obligations and legal responsibility sit with the company named in the SPA.
The instalment structure can make the project look easier to enter, but the full cash path matters more than the monthly headline. Current offers spread part of the price through construction and leave a substantial balance for handover. Some sellers also advertise developer financing for up to 15 years at around 10% per year after handover. That is no longer the interest-free portion of the deal. Discounts also vary with the initial payment, so two units with the same list price can produce very different total economics depending on the down payment, discount, handover balance and whether the buyer carries debt after completion.
Construction risk changes as a project moves upward. Earlier in the cycle the primary question is whether the building will be delivered at all; later, attention shifts toward finish quality, commissioning of building systems, common-area readiness and the documents needed for transfer. Kingston Royale has moved well beyond foundation work and into the residential structure, but it remains an unfinished development. A progress percentage is therefore useful context, not proof of occupancy. The SPA needs to define completion, handover, any grace period, inspection rights and the event that actually triggers the final payment rather than relying on a brochure date.
The operating-cost profile is broadly consistent with a high-rise condominium, but the amenities are not free after completion. Listings quote management fees around USD 0.90 per sqm, separate monthly car-parking charges and specific utility rates. One agency says the sinking fund is included in the management fee, yet the final condominium rules and first operating budget are not publicly available in the sources reviewed. What matters is not only the headline rate but the calculation base, the services included, the authority to change charges and the way major repairs to lifts, pools, façade systems and mechanical equipment will eventually be funded.
Location descriptions need some discipline. The physical address consistently points to Street 69BT in Boeung Tompun, Khan Mean Chey, while marketing pages often associate the project with Russian Market, Phsar Daeum Thkov or Chamkarmon. Those labels describe the wider catchment better than the cadastral position. For an owner-occupier, the useful test is the ordinary weekday route to work, school, groceries, healthcare and the parts of Phnom Penh they actually use. Traffic can materially change journey times, so this dossier does not convert agency drive-time claims into fixed promises.
For an investment buyer, the most useful question is not the advertised yield but the exit scenario. At handover, a resale buyer will compare a finished apartment, its view, actual internal space, management quality and recurring charges against other completed units in the same building and nearby projects. Kingston Royale has many one-bedroom layouts clustered within a relatively narrow size band, which means similar units may compete with each other on the secondary market. That does not imply poor liquidity, but it increases the importance of entry price, floor, orientation, usable area and final condition. No guaranteed rental return or capital-growth assumption is used in this dossier.
Ownership format
Foreign buyers are marketed direct ownership of an individual apartment through a strata title. Cambodian law permits legally qualified foreigners to own private units above the ground level; ground and underground floors are excluded. Foreign ownership is capped at 70% of the total surface area of all private units in the building, so quota availability still needs to be checked for the selected apartment.
Unit types & sizes
The largest published standard layout. It gives buyers two separate bedrooms and more living space, but the value comparison depends on which area definition is actually written into the contract.
A more compact two-bedroom option. It is materially smaller than Type A, so room proportions and storage matter more than the bedroom count alone.
The most compact of the core two-bedroom types by published gross area. It suits a buyer who needs two rooms but values a lower entry budget more than maximum floor space.
One of the larger one-bedroom layouts. It may work better for owner-occupation when a usable living room and work area matter more than the smallest possible footprint.
Close to Type D in size, but the better choice depends on the actual geometry, orientation and floor. A small difference in square metres does not by itself show which home will feel more usable.
A mid-sized one-bedroom plan. It is meaningfully smaller than Types D and E while still offering more internal space than the smallest layouts in the range.
A compact city apartment with a separate bedroom. At roughly 36.5 sqm internally, furniture placement, circulation space and storage make a noticeable difference to everyday usability.
The published area matches Type G, so the real distinction is likely to be plan geometry, orientation or position on the floor. These layouts are better compared side by side on the plan than by area alone.
One of the smaller one-bedroom choices. Some sales sources appear to swap the published sizes for Types I and K, so the actual floor plan and unit number should be checked before reservation.
A compact layout that also appears in current discounted listings. A low price on one Type J apartment should not be treated as the price of every Type J, because floor, promotion and remaining stock change.
The smallest published layout across the sources that agree on the plan. It can reduce the entry budget, but an owner-occupier should look closely at storage, kitchen space and bedroom dimensions.
Kingston Royale is marketed with both gross and internal/net area figures. This dossier keeps those measurements separate and does not calculate one from the other. One source appears to swap the 43 and 45.6 sqm figures for Types I and K; the main cards use the values that align across Cam Realty, PropertyHub Cambodia and other project listings. Prices are the lowest the brokerage boards publish as of October 2026, not the developer’s price list — the price and availability of a specific unit are something we go through with you personally.
Facilities
15 amenities
Fitness and wellness
- rooftop swimming pool
- gym
- steam room
- sauna
- jacuzzi
- yoga area
Shared spaces
- sky garden
- lobby
- convenience shop
Access and security
- three lifts
- 24-hour security
- CCTV
- card access
Parking
- seven car-parking levels
- two motorbike-parking levels
How the tower is arranged
- Ground levelLobby and convenience shop
- Seven levelsCar parking
- Two levelsMotorbike parking
- Floor 33Gym, steam room, sauna and jacuzzi
- RooftopPool and sky garden
Location
- The project site is on Street 69BT in Boeung Tompun, Khan Mean Chey, Phnom Penh.
- The official brand describes the project as being near Street 271, a major reference corridor for this part of the city.
- Agency profiles commonly place it within the wider Russian Market / Chip Mong 271 Mega Mall catchment, although real travel time is traffic-dependent.
- Some portals classify the project under Chamkarmon or Phsar Daeum Thkov for marketing purposes; the physical Street 69BT location is the more consistent cross-source reference.
Address / landmarkPlot 427, Street 69BT, Kbal Tomnup Village, Sangkat Boeung Tumpun, Khan Mean Chey, Phnom Penh, Cambodia
The map loads from OpenStreetMap on request.
The circle shows the project’s approximate location; we confirm the exact address and the plot boundaries when you get in touch. © OpenStreetMap contributors.
Price & purchase terms
- Current price: From USD 45,662 on the current IPS Cambodia project profile, checked on 6 October 2026. This is a lower market anchor from available listings, not a project-wide fixed price; the exact unit, discount, availability and payment schedule need to be reconfirmed before reservation.
- Expected completion: 2027 Q4
We show the lowest of the prices the brokerage boards publish: their figures for the same unit differ by a few per cent, and none of them is the developer’s price list. We ask the developer for the current price, availability and payment terms on the unit you are looking at, and go through them with you personally.
How the payments run
- ReservationCurrent offers show either USD 1,000 or 5% of the price; confirm against the selected unit.
- SPA signingCommonly 10–30% of the price, depending on the selected plan and discount.
- During constructionMost current sources show about 1% of the price monthly for 36 months interest-free.
- HandoverRemaining balance; some sellers advertise developer financing for up to 15 years at around 10% per year.
Project stage — what we know
Under construction. Handover declared for 2027.
Before booking check escrow, real timeline and the developer track record.
- Planned
- Building
- Done
What is documented on this page
Facts published here and the points to confirm before booking.
The page documents 11 key facts; 7 items should be confirmed before booking; data checked 2026-10-06.
This is a record of published facts, not a quality rating.
At a glance
Is this project right for you?
Tick what describes you — we will show whether this may be a fit. Honest, without gloss.
Your selections are not saved anywhere. This is a decision aid, not an assessment.
Best for: A buyer looking for a one- or two-bedroom city apartment who can wait for completion and handover into late 2027 or early 2028.; A foreign buyer who values a direct registered apartment-ownership route rather than an indirect structure for controlling land.; A buyer who benefits from spreading part of the purchase price across the construction period and can plan for a substantial handover balance.; Someone willing to compare net usable space, layout geometry, recurring fees and building operations rather than relying on headline gross area alone.; may not suit: A buyer who needs immediate occupancy, because the building is still under construction.; A household looking for a standard three-bedroom-or-larger family apartment; the published core mix does not include one.; Someone who does not want a meaningful payment remaining at handover or any reliance on future financing.; A buyer who expects the lowest advertised price to apply across all floors, layouts and payment plans..
What we confirm before booking
A short, project-specific list. We request these from the developer and go through them with you before any payment.
- Which delivery date will the seller contractually commit to: late 2027 or 2028?
- Do the unit number, gross area and net area match the signed plan?
- Which payment schedule applies now, and is this unit’s furniture package included?
- Who is the seller for the Plot 427 project, and what establishes permits, title and parking rights?
Disputed and unknown information
This keeps the open points in one place. A missing or disputed fact is not treated as a conclusion.
- The schedule is not fully consistent: some sources state Q4 or December 2027 completion, while others place handover in Q1 or April 2028. The SPA should distinguish construction completion from the contractual handover date.
- Current payment plans vary: reservation is shown as either USD 1,000 or 5%, and both 30- and 36-month instalment schedules appear in recent listings. The selected unit's signed schedule should take priority over marketing tables.
- Kingston Estates states more than 15 years of experience and nine completed projects. Related project names are visible in public sources, but the complete nine-project record and the brand's corporate history were not independently verified through a registry extract.
FAQ
How many floors and apartments are advertised?
The official specification lists 36 floors and 310 apartments, not 310 currently available units.
Are studios established in the project?
The retained A–K schedule documents one- and two-bedroom types. A separate studio format has not been verified.
Why do the area ranges differ?
Older examples distinguish gross and net areas, while other ranges are not consistently labelled. Use the selected unit’s contractual measurement.
What is the current price?
On request. H-05 and A-32 are archived examples, and a newer broker card is not a current official seller price list.
When is handover?
No single contractual date is established. NovAsia gave December 2027; IPS later listed Q1 2028 completion and 1 April handover.
Sources and documents
Official developer and public records used for this page. We publish no outbound links.
- Developer's official site — Kingston Estates — official portfolio checked 2026-10-06
- Developer's official site — Kingston Royale — project specification checked 2026-10-06
- Developer's official site — IPS Cambodia — Kingston Royale Condominium checked 2026-10-06
- Developer's official site — IPS — Kingston Royale Condo Key Construction Milestone checked 2026-10-06
Project details checked by Senmonorom Sok — 7 August 2026
I checked current unit availability and prices, and reviewed the advertised interest-free instalment period of up to 36 months as a current developer term that must be reconfirmed for the chosen residence.
- ✓ Availability
- ✓ Construction stage
- ✓ Project status
- ✓ Purchase terms
Compare the individual properties: condition, documents and deal terms can differ within the same development.
The legal terms of a specific deal are checked separately against the contract.
Read next
Related

Valeria Lezhenina
Head of client support and Cambodia property consultant at NovAsia. She will pin down your goal and budget, put together a shortlist of available units, work out the payment plan and check the terms on the specific unit — before you commit, and without passing your contact to third parties.
Message us about Kingston Royale →Need help with a specific project?
Send the project name, a link or a written offer. We can match the exact property, seller, title route, stage and current unit terms before you decide.
Informational, not a public offer or personal investment, legal or tax advice. Price, availability, payment terms and guaranteed-return/buyback conditions are confirmed per unit with the developer and their contract.