KEY TAKEAWAYS

What to take away

4 points · about 45 sec

The main ideas to keep in mind as you read.

  1. The contrast between Northpoint’s 31.3 apartments per rai and ONCE Pattaya’s 183.9 measures how homes relate to project land, without establishing which residents experience more crowding.

  2. Parking ratios add an entirely different dimension to condo comparisons. ONCE Pattaya publishes 134 car spaces for 427 homes, around 31.4 per 100, while The Riviera Ocean Drive reports about 20.1 per 100, yet neither ratio establishes whether a particular owner has an assigned space or visitors can park.

  3. Passenger-lift capacity must be assessed for the relevant tower or wing, keeping service lifts separate. A building’s floor count cannot substitute for undisclosed lift numbers.

  4. Developer disclosures are not always directly compatible: estimated land areas remain approximate, and a parking percentage with no stated base is not a bay count. THE BASE Central Pattaya even has conflicting official site-area figures, making a single precise density number unjustified until the boundary difference is explained.

What the density number actually measures

A 376-home scheme can occupy 12 rai, while another with 427 homes fits onto 3,715 square metres. Northpoint and ONCE Pattaya are close in apartment count but very different in how much land sits behind that count, which is why the raw number of homes is a poor comparison on its own.

For this page, site density means residential apartments divided by the land area belonging to the same project boundary. One rai is 1,600 sq m; one ngan is 400 sq m; one square wah is 4 sq m. A hectare is 10,000 sq m, or 6.25 rai, so a units-per-rai figure can be converted to units per hectare by multiplying it by 6.25.

The numerator stays residential. Retail space, hotel rooms and later phases are kept separate unless both the home count and the land figure clearly refer to the same whole development. Towers sharing one plot and one amenity system also need to stay together unless the source gives each phase its own land denominator.

This is a structural measure, not a legal development ratio, an occupancy estimate or a comfort score. Northpoint works out at 31.3 homes per rai and ONCE Pattaya at 183.9, but those numbers do not tell us how many people are actually present, how long a lift wait is, or how quiet either building feels.

Density and shared-load metrics

Density is calculated only where the residential count and land figure describe the same project boundary. The ≈ sign marks land figures published as approximate by the developer. Multiply units per rai by 6.25 for units per hectare. Copacabana states parking as 30% without defining the percentage base, so it is not converted into spaces per 100 homes.

ProjectUnits / raiParking / 100 units
Northpoint31.3not disclosed
ONCE Pattaya183.931.4
Copacabana Beach Jomtien174.9not calculated*
Embassy Pattaya≈94.8not disclosed
The Riviera Jomtien≈178.729.8
The Riviera Ocean Drive190.920.1
QUESTIONS ABOUT THIS TOPIC

A closer look

2 questions · open to read

Practical follow-up questions that go beyond the basics.

Can a “30% parking” claim be compared with 31.4 spaces per 100 apartments?

Not reliably while the developer leaves the percentage base undefined. Copacabana’s published 30% figure cannot be converted into car spaces per 100 homes on that evidence. ONCE Pattaya’s ratio, by contrast, comes from a disclosed count of 134 car bays and 427 apartments.

How can two official sources give different density figures for the same project?

The numerator can stay constant while the site-area denominator changes. For THE BASE Central Pattaya, two official materials describe different land areas for the same 1,112 apartments, producing roughly 185.3 versus 162.5 homes per rai. That is about a 14% difference in the calculated density. Until the project boundary or measurement discrepancy is explained, presenting either figure as definitively correct would imply precision the records do not support.

Why one number does not capture shared-space load

Parking is a simple example of why the land-density number cannot carry the whole decision. ONCE Pattaya has 134 car spaces for 427 apartments, about 31.4 per 100 homes. The Riviera Jomtien publishes 319 for 1,072 homes, about 29.8, while The Riviera Ocean Drive has 103 for 513, about 20.1. Those ratios still do not tell a buyer how visitor spaces, assigned bays or access rules work.

The building layout changes circulation as well. Northpoint spreads 376 homes across two towers of 46 and 54 storeys; Embassy Pattaya divides 474 homes among three eight-storey buildings; Ocean Drive places 513 homes in one 43-storey tower. A site-density figure cannot show which lobby, lift bank or car-park entrance carries the heavier local flow.

Lift load needs tower-level information. The useful denominator is the number of apartments served by the passenger lifts for the relevant building or wing, with service lifts kept separate. If a project page only says “high-speed lifts” and gives no count, there is no sound basis for inventing an apartments-per-lift ratio from the floor plan.

Amenity lists have a similar limitation. Embassy Pattaya states about 1,000 sq m of indoor common area, but that figure does not cover every outdoor pool or garden in a way that can be compared directly with another developer's facility list. Twenty named amenities are not evidence of more shared space per resident than a shorter list.

Actual queues, noise and pool crowding are operating conditions, not outputs of a density formula. A completed condo allows more direct observation; for a project still being built, the approved plans, specifications and contractual scope carry more weight.

How to use density for your decision

Suggested next stepPair units per rai with the number of homes in the specific tower or building.

It describes designed scale, not actual occupancy.

Suggested next stepUse the passenger lifts serving the relevant tower and the apartment count assigned to them.

Keep service lifts separate; real waiting time needs observation, not a floor-count shortcut.

Suggested next stepCompare actual car spaces per 100 homes together with visitor parking and access rules.

A parking percentage is useful only when its calculation base is clear.

Suggested next stepLook for documented size, location and access conditions for shared facilities when those details are published.

A longer amenity list does not equal more shared space per resident.

Where the comparison stops being like-for-like

Some Pattaya figures come with built-in uncertainty. The Riviera Jomtien calls its land area approximately 6 rai and Embassy Pattaya approximately 5 rai, so their density ratios should stay approximate too. Copacabana's 30% parking statement is also not interchangeable with a confirmed bay count because the developer does not define the percentage base. Master plans create another trap when a land figure covers several phases but the apartment count belongs to only one.

THE BASE Central Pattaya is a useful boundary case. Sansiri's current project page says about 6 rai, or roughly 9,600 sq m, for 1,112 homes, which would produce about 185.3 units per rai. An official sales kit from the project period gives 6-3-38 rai, or 10,952 sq m, for the same 1,112 homes, producing about 162.5 units per rai. That is roughly a 14% density difference, so the project is kept out of the main table rather than forcing one official denominator to win without an explanation.

Missing disclosure is not evidence that a facility does not exist. An unpublished parking count, passenger-lift count or garden area should remain “not disclosed” until a reliable project document supplies it. That keeps the comparison less complete, but much more useful than false precision.

What to verify for a specific condo

Complete0 of 9
Project boundaryChecklist0 of 3
Vertical loadChecklist0 of 3
Shared facilitiesChecklist0 of 3

Expert view

Mark Erometskiy

I use density as a prompt for the next question, not as a verdict on a building. Three hundred homes split between two towers can create a very different circulation pattern from the same number concentrated in one tower. For lifts, the useful figure is how many apartments share the passenger lifts serving the specific building or wing. Parking also needs a real space count and usage rules; a marketing percentage may not tell you enough. Completed projects let a buyer observe more of this directly, while off-plan schemes require greater reliance on approved plans and contract documents.

Mark Erometskiy
NovAsia Thailand expert
Expert profile →

Sources and check dates

Sources5
  1. Northpoint | Raimon Land

    Confirms 376 apartments, two towers of 46 and 54 storeys, a 12-rai site and completion in 2009. The page does not disclose exact car-space or passenger-lift counts.

  2. ONCE Pattaya | Honour Thailand

    Confirms a 2-1-28.75-rai site, 427 apartments, 32 storeys and 134 car spaces plus 30 motorcycle spaces excluding parallel parking. Density and car spaces per 100 homes are calculated from those inputs.

  3. Copacabana Beach Jomtien – Project Information

    Confirms 1,644 apartments, 59 storeys and a 9-rai 1-ngan 60-square-wah site, equal to 15,040 sq m. Parking is stated as 30% without a defined base, so no spaces-per-100-homes ratio is calculated.

  4. Embassy Pattaya – Project Information

    Confirms approximately 5 rai of land, 474 apartments, three eight-storey buildings and about 1,000 sq m of indoor common area. Because the land figure is approximate, the calculated density is also marked approximate.

  5. The Riviera Jomtien | The Riviera Group Thailand

    Confirms approximately 6 rai, 1,072 residential units, 18 commercial units listed separately, 46 storeys and 319 parking spaces. The page mentions high-speed lifts but does not state their number.

A practical second opinion

Need help assessing a specific property?

Send the property link, price and your goal. We will separate the documented facts from the points that still need a property-specific check.

What to send: link, budget and target date