NovAsia
Available by request

Melasti Apartments

Melasti Apartments is a small hospitality-oriented apartment building within the larger Lyvin Melasti estate on Bali’s southern Bukit Peninsula.

Pecatu, Kuta Selatan, Kabupaten Badung, Bali — Jl. Blimbing Sari II (Lyvin Melasti Villas)

Overview of Melasti Apartments in Bukit Peninsula

From 5,755,520,000 IDRDeveloper publication · 28 October 2026. Current price list, layouts and availability — discussed one-to-one with a project specialist

QUICK — 10-SECOND READ

Quick — 10-second read

What it is
Serviced residence
Where
Pecatu, Kuta Selatan, Kabupaten Badung, Bali — Jl. Blimbing Sari II (Lyvin Melasti Villas) · Bukit Peninsula
Stage
Under construction · 2026
Price
From 5,755,520,000 IDRguide price, final by unit
Transparency
8 facts confirmed · 6 to verify
Developer context

Who is behind this project

Developer
Lyvin PropertiesOpen developer profile →
Projects with us
6
Transparency
Based on public sources and project documents

The brand may differ from the legal entity in a specific contract. Confirm the seller and the contracting party before payment.

Why this project is worth a look

A defined apartment building

The dedicated project page describes a four-storey building with 20 one-bedroom homes. That is a clear apartment product, even though the surrounding estate contains separate villa phases with less consistent published counts.

Layouts beyond a standard room

Types A, B and C differ in size, position and outdoor features. A private pool is part of the marketing for selected configurations, making the individual floor plan far more useful than an estate-wide photograph.

Services across the estate

A shared 25-metre pool, spa, gym and restaurant could make a one-bedroom apartment feel more like a serviced retreat. Delivery dates, access conditions and maintenance charges still need to be established.

An operating model to examine

Lyvin intends to provide hotel-style guest management rather than leave owners to organise every stay. The operational scope sounds tangible, but the fee structure and owner-use rules are not publicly documented for a particular apartment.

About the project

Melasti Apartments is a small hospitality-oriented apartment building within the larger Lyvin Melasti estate on Bali’s southern Bukit Peninsula. It should not be confused with the estate’s completed villas or the additional villa releases marketed under the same brand. Lyvin’s current project page describes a four-storey building containing 20 one-bedroom apartments. That is the clearest available definition of the product. A villa sale may come with its own pool, different land arrangements and a separate completion timetable; none of those details should be copied into an apartment listing simply because both belong to Lyvin Melasti. For this dossier, the apartment building is the single project being assessed.

Read moreShow less

What stands out first is the space allocated to a one-bedroom home. The developer publishes a general area range of 79–114 square metres and divides the apartments into three design types. The floor plans are not interchangeable: some space is dedicated to outdoor living and water features, and some apartments occupy different levels of the hillside building. A buyer who compares these homes solely by total area could miss how much enclosed space remains for the bedroom, kitchen and living room. The published total is useful for shortlisting, but the dimensions of the individual rooms and the exact boundaries of the purchased accommodation need the unit-specific plan.

Type A is advertised at 102.4 square metres, with a separately displayed 36.4-square-metre balcony-and-pool component. It is presented as a ground-level one-bedroom apartment with an open living area, kitchen and its own pool. Type B appears in two stated sizes, 80.1 square metres and 78.8 square metres for the lower-ground variant; the description covers apartments on several levels. The larger Type C is listed at 113.7 square metres and is promoted for its outlook from the central section of the building, including the bathroom. These are developer layouts, not a verified inventory of apartments still for sale. The allocation of types to individual unit numbers has not been published in a usable current schedule.

The hilltop setting is designed to make the ocean the focal point of daily life. Lyvin says all apartments have sweeping views and uses extensive glazing to support that claim. Such descriptions are best understood as the intended design experience, not a measured guarantee of the sightline from every future balcony. Shared areas, neighbouring buildings, planting and the final position of an apartment can change what a resident actually sees. There is also a meaningful distinction between a private pool and access to the estate’s communal pool. The broader marketing material discusses both, but it does not establish a private pool for every Type C home or an identical level of privacy on each terrace.

The most reliable geographic description is Pecatu, Kuta Selatan, Badung Regency, near the southern edge of the Bukit Peninsula. Lyvin’s accommodation business provides Jl. Blimbing Sari II as the address of Lyvin Melasti Villas. The apartment building is advertised as part of the same hillside estate, but we did not find a separately documented apartment address, surveyed parcel or unambiguous map pin for that specific building. The villa address therefore works as a practical reference point, not as proof of the apartment’s legal lot boundaries. No coordinates have been assigned to the apartment record rather than borrowing a pin associated with the villa operation.

This is a place where a vehicle matters more than a beach photograph might suggest. The developer describes Melasti Beach as a seven-minute drive away and the main transport routes as roughly five minutes away. Those are marketing journey times, with no stated traffic conditions. Steep ground, resort entrances and the way roads wind across southern Bukit can make an apparently short distance less convenient on foot. That does not make the location unattractive: being on a quieter hillside is part of the concept. It does mean that someone staying for several months should think about groceries, medical appointments and everyday travel rather than assuming a walkable beachfront neighbourhood.

Apartments also depend on how the surrounding estate is operated. Lyvin presents a restaurant, spa, fitness facilities and a 25-metre communal swimming pool as part of the wider development. Hotel-style cleaning, security and guest services are intended to support the residential building. Those facilities are an important part of what differentiates the project from a freestanding apartment; they can also create recurring service obligations. Their inclusion on a master plan does not tell a buyer which facilities are already open, which ones can be used without extra payment, or whether access is shared with villa guests. All three questions affect the experience and the running costs of the home.

The developer’s own descriptions are not perfectly consistent about the estate as a whole. One section refers to 18 single-storey villas, another to 32 villas, while the land area is shown as both 3.2 and 3.3 hectares. Lyvin’s separate villa pages and operating portfolio point to distinct villa releases, so combining those counts would risk confusing completed accommodation with future phases. The apartment building is easier to identify because its dedicated page repeatedly states 20 one-bedroom units and four floors. Nevertheless, an up-to-date approved master plan matters when evaluating access roads, shared service areas, how crowded the estate may become and whether further construction will continue beside the apartments.

Lyvin Properties is the development brand. Its website identifies PT Lyvin Properties Indonesia and publishes business registration number NIB 2302220057448. The associated hospitality website names PT Bukit Hijau Management as the operator of existing Lyvin accommodation. This is helpful evidence that the group is presenting development and hospitality as separate functions. It is not a substitute for determining the legal parties in an apartment purchase. The company granting a sublease, the recipient of a payment and the party responsible for operating the apartment building may have different roles. We have not independently inspected corporate registry extracts, the underlying land agreements or signing authorisations for this building.

Construction timing deserves particular care. The apartment project page still forecasts completion in the third quarter of 2026, a period that had already ended by the 28 October research date. Yet the apartment building remains under Lyvin’s ongoing-projects section, while Balinsky reports an estimated 90% construction progress. A construction bulletin circulated in April described the residential shell as finished and reported further work on corridors, public spaces, furnishing and reception. At that point, a soft opening was expected for late July. Progress bulletins can be informative, but a functioning lift or completed swimming pool is not the same as formal completion, unit handover or authorisation to occupy and operate the building.

A second timing issue appears in Lyvin’s wider apartment sales catalogue, which places completion labels through late 2029 alongside several different projects. The plain-text presentation leaves some uncertainty about which label belongs to which card. That is insufficient to assign a new 2029 handover date to Melasti, particularly while the dedicated Melasti page retains its earlier Q3 2026 schedule. Accordingly, the record preserves the original published target and marks completion as unverified. The buyer-facing question is narrower and more useful: when is the particular apartment due for delivery, what conditions trigger final payment, and what evidence will show that the building and its shared systems are ready for lawful use?

The advertised ownership structure is contractual rather than freehold title to land. According to Lyvin, PT Lyvin Properties Indonesia holds long-term leases over land parcels and offers purchasers a notarised sublease for a defined period alongside a property-management contract. The project page mentions 39 years and a possible further 50 years. That second period is an option described in marketing; it should not be treated as automatically secured time. Balinsky separately lists a 37-year base term. Without the underlying lease and an apartment-specific sublease, there is no sound basis for selecting a definitive remaining term, renewal price, starting date or transfer right.

This legal distinction has practical consequences even for someone who only plans to visit for a few weeks each year. The worth of a long sublease depends on what the primary landlord has authorised, whether rights can pass to another buyer or an heir, and how long the head lease lasts. There may also be restrictions on alterations, personal stays or transferring a unit through the management programme. Indonesian regulations on land and strata ownership provide the broader legal setting, but they do not turn a marketing expression such as ‘89 years of leasehold’ into a property-specific guarantee. The transaction documents, land rights and authority of the relevant contracting parties control the real answer.

Permits are another unresolved part of the record. We could not inspect a project-specific PBG building approval or an SLF certifying a completed building’s fitness for use. Indonesian authorities distinguish the approval of construction from the certification of a building that is ready for occupation; the two documents have different functions. Missing public copies do not mean a permit has not been issued. They do mean that a prospective purchaser cannot infer permission to open or rent the apartments from a broker’s percentage-complete graphic. Evidence of authorised land use and the applicable hospitality operating permissions would also matter given the intended short-stay service model.

The developer quotes USD 320,000–455,100 for apartments and describes the published figures as inclusive of an 11% VAT component. That statement is reported as the developer’s pricing presentation, not an independent tax assessment. The same page says one of the 20 apartments remains. The lower end of a historic or project-wide range therefore cannot safely be advertised as the price of the unit actually available today. Koalista publishes a higher USD range, while Balinsky has two listings priced in Indonesian rupiah. Those figures serve as evidence that listings differ, not as numbers to average into an invented current valuation.

There is an additional currency detail in Lyvin’s published terms: although its headline prices appear in dollars, settlement under the agreement is made in Indonesian rupiah. A purchaser needs the contractual price, invoice currency, exchange arrangement and timing of each payment to know the real commitment. We found no authoritative apartment-specific schedule for the purported last unit. Third-party instalment terms attached to other Lyvin Melasti products or older microsites cannot be assumed to apply. Fees, taxes, legal documentation, operating reserves and any renewal payment all need separate treatment from the advertised headline amount.

The hospitality model might appeal to an owner who wants someone else to handle guest bookings, cleaning and maintenance. Lyvin describes marketing, guest support, technical upkeep, security, monthly investor reporting and assistance with distributing rental receipts. But the publicly accessible material does not establish the management fee, minimum operating budget, owner-stay allowance, withdrawal restrictions or the allocation of repair costs. A profitable guest operation is not guaranteed just because a developer has other villas already taking reservations. Any rental forecast should be read against actual management terms, conservative occupancy assumptions and the expenses that reduce gross room revenue to what the owner keeps.

For the right buyer, Melasti Apartments offers a fairly distinct proposition: a generous one-bedroom layout, intended ocean views and shared resort infrastructure within a development brand that already operates nearby accommodation. It is less persuasive as a straightforward completed home that can be occupied immediately or as land-backed ownership with a fixed, assured 89-year tenure. The key unknowns are specific rather than abstract — the current construction and handover evidence, the approved building and site documents, and the exact notarised rights associated with the remaining apartment. Until those are supplied, a considered buyer can understand the concept, but cannot yet treat the promotional package as a fully documented transaction.

Ownership format

Lyvin describes a notarised sublease granted by PT Lyvin Properties Indonesia, which says it holds the underlying land leases, together with a separate management agreement. The project advertises 39 years plus a possible 50-year extension, while another listing reports 37 years. No apartment-specific contract has been inspected to establish the actual remaining term or enforceability of renewal.

Unit types & sizes

Type A · one-bedroom apartment
102.4 sqm (published total area)

The developer places this design on the ground level and shows an open kitchen-and-living space with a private pool. A separate 36.4 sqm figure is given for the balcony and pool area. The floor-plan annex, rather than the headline total, must establish the enclosed space and the exact purchased features.

Get floor plans and current prices
Type B · one-bedroom apartment
78.8 sqm and 80.1 sqm variants

Two figures appear in the developer’s plan presentation, including a 78.8 sqm lower-ground option and a 80.1 sqm version. The concept shows an open living area, substantial glazing and a pool. The applicable level, outdoor privacy and exact specifications need to match the numbered unit being offered.

Get floor plans and current prices
Type C · one-bedroom apartment
113.7 sqm (published total area)

The largest published layout is positioned in the central section of the building, with the outlook from the bathroom highlighted in the marketing. That does not by itself establish a private pool or identical sightlines for every Type C unit. Availability and room-by-room dimensions require the actual sales plan.

Get floor plans and current prices

The developer shows Types A/B/C and rounds its overall offer to 79–114 sqm. The published totals do not establish net enclosed space or the allocation of pools and terraces to every unit. Only a numbered floor-plan annex can settle the relevant floor, usable area and inclusions.

✦ Similar projects

Comparable projects in the same city

Each option includes a factual reason for the comparison. Price and availability are confirmed for the selected unit.

Facilities

9 amenities

Pools and fitness

  • proposed 25-metre communal swimming pool
  • proposed fitness facilities
  • private pools in selected apartment layouts

Dining and wellness

  • planned restaurant
  • planned spa
  • estate-wide shared areas

Hospitality services

  • planned guest marketing and reception
  • planned housekeeping and maintenance
  • advertised 24-hour security and owner reporting

Location

  • Pecatu, within Kuta Selatan and Badung Regency, is the supported administrative setting. ‘Melasti’ is used as the coastal locality name rather than a city designation.
  • Jl. Blimbing Sari II is published as the address of the existing Lyvin Melasti Villas. It is a reference for the shared estate, not a verified parcel address or map coordinate for the apartment building.
  • Lyvin gives indicative driving times of seven minutes to Melasti Beach and five minutes to the main routes. Those timings have not been independently measured under normal traffic conditions.
  • The hillside offers the potential for views, but the project should be approached as a vehicle-dependent southern Bukit location until on-the-ground access is assessed.

Address / landmarkPecatu, Kuta Selatan, Kabupaten Badung, Bali — Jl. Blimbing Sari II (Lyvin Melasti Villas)

District context

About this district

The district guide explains everyday context. Check the specific unit, price and documents separately.

TRAVEL DEMAND

Tourism in the wider destination

Bali · 2025

Direct foreign arrivals≈ 6.9 million

Visitor flow month by month

Direct foreign arrivals to Bali and occupancy of star-rated hotel rooms across the island

Jan502,20556.7% hotel rooms
Feb492,28955.4% hotel rooms
Mar472,07052.5% hotel rooms
Apr553,32857.9% hotel rooms
May578,25161.2% hotel rooms
Jun605,01364.9% hotel rooms
Jul697,80967.3% hotel rooms
Aug685,99468.2% hotel rooms
BPS Bali · observed months 2026-01–2026-08; not a multi-year seasonal norm or occupancy of a private rental.

Bali provincial government, citing BPS · Bali provincial government citing BPS; island-wide arrivals, not this property’s occupancy.

MARKET DYNAMICS

How housing prices have changed

Indonesia · published price index, historical data

Index now168.5
Last 12 months+0.7%
Since 2015+23.7%
Average per year+1.9%
134152.51712015202020262026-Q2168.5

2015-Q1 — 2026-Q2 · BIS / Bank Indonesia · 2010=100. Regional housing index, not villa transaction prices or this project’s return.

READ BEFORE DECIDING

What should I read about this choice?

A short route from daily-life questions to market evidence. Selected for this project’s location and stage; these pages do not verify the project itself.

YOUR DECISION

What this project means for me

Build your scenario from the published facts and your choices on this page. Not a rating or a return promise.

Choose a goal; your selections in the widgets below will appear in the summary.

No conditions selected yet. Start with fit criteria, everyday places or the months you plan to stay.

NEXT STEP

Resolve questions before booking

Prepare a request around published unknowns and your conditions. Nothing is sent automatically.

Data freshness and provenance
Latest recorded source / material check
Price
Published reference from project materials
Open items in the discrepancies section
3

The date belongs to an editorial record, not every individual fact. It does not verify a reviewed contract, legal clearance, current price or unit availability.

Price basis · Discrepancies · Dossier sources

Price & purchase terms

  • Current price: From 5,755,520,000 IDR — Developer publication · 28 October 2026. Display conversion from 320,000 USD using the fixed FX snapshot 2026-10-21; confirm the contract currency. The selected unit, availability, current price and terms require confirmation.
  • Expected completion: 2026-Q3
INVESTMENT

Investment return calculator

The starting amount is the published project price. Adjust the sliders to compare scenarios.

Net rent over the period
Value at exit
Total before sale costs
Test a bad rental year

Compare your current inputs with a lower occupancy and higher share of running costs. Set the changes yourself; this is a stress test, not a forecast.

Your net rent per year
Bad-year net rent
Difference per year
The property price, taxes, financing and sale are not recalculated here. A negative result is possible when expenses exceed rent.
Show the calculation by year
YearGross rentRunning costsCumulative net rentProperty valueTotal

8% potential gross rent, 65% occupancy, 20% running costs and 3% price change are editable examples, not a forecast. Taxes, financing, transaction fees and resale terms are excluded. Occupancy and costs apply to rent, not to the property value.

OWNERSHIP COSTS

What does an empty property cost?

Enter your own expenses. No market averages are assumed.

Per month from entered costs—
Per year from entered costs—

Blank fields are unknown, not zero. This is not a full ownership budget: taxes, loan payments, transaction costs and unexpected repairs are excluded unless you include them yourself.

ALTERNATIVES

What else can you compare it with?

Change rent, occupancy and costs above; public benchmarks are reference points.

Property net rental scenario4.2%
after occupancy and running costs; adjust above
US Treasury, 1 year4.5%
USD · 2026-10-21
US inflation, purchasing-power erosion-3.7%
USD · 2026-09

The property bar is net rental cash flow divided by purchase price, before tax; it excludes price growth. US Treasury yield is in USD. Inflation shows purchasing-power erosion, not a separate investable return. Risk, taxes, liquidity and currency differ. US CPI source

Under construction

Project stage — what we know

Under construction. Handover declared for 2026.

Before reserving, check the timeline, payment schedule and buyer protections in the contract.

  1. Planned
  2. Building
  3. Done
Checked by NovAsia

What we know

Verified details and questions to settle before reserving.

8confirmed key facts
6to confirm before bookingConfirm these points before reserving a unit.

8 key facts confirmed; 6 more to verify before reserving.

This is not a project rating.

At a glance

LocationPecatu, Kuta Selatan, Kabupaten Badung, Bali — Jl. Blimbing Sari II (Lyvin Melasti Villas)
CategoryServiced residence
SubtypeServiced residence
ConstructionUnder construction
Units20
Honest fit

Is this project right for you?

Tick what describes you — we will show whether this may be a fit. Honest, without gloss.

Likely yes if
May not suit if

→ Discuss with a consultant

Your selections are not saved anywhere. This is a decision aid, not an assessment.

Best for: A solo resident or couple who wants a proper one-bedroom living arrangement with more breathing room than a compact holiday suite. The distinct A, B and C layouts create real choices between outdoor features, room configuration and the total published area.; A part-time Bali resident who prefers organised hospitality services to maintaining a standalone villa. Shared facilities may be a benefit, provided owner stays and access charges work with the person’s actual usage pattern.; An experienced buyer considering managed short-stay rentals, with a willingness to examine fees, maintenance reserves, contract restrictions and after-cost income rather than rely on a promotional yield figure.; Someone whose timing is flexible enough to accept an apartment still listed as ongoing, but who will require meaningful delivery and permit evidence before the transaction becomes unconditional.; may not suit: Households requiring multiple separate bedrooms will find the verified apartment mix restrictive: the project page lists only one-bedroom homes.; Buyers seeking direct land title, an irrevocable 89-year right or immediate, fully evidenced handover should not mistake the current promotional description for those outcomes.; Anyone expecting a walk-to-the-beach neighbourhood or complete freedom to self-manage short-stay rentals may find the location and proposed hospitality agreement a poor fit..

What we confirm before booking

A short, project-specific list. We request these from the developer and go through them with you before any payment.

  • Completion remains unresolved. Lyvin’s dedicated page retains a Q3 2026 target that has passed, while the building remains in its ongoing portfolio and Balinsky estimates roughly 90% progress. No apartment handover evidence or SLF has been inspected; a later catalogue date cannot confidently be assigned to this building.
  • Lease duration is disputed. The developer presents 39 years with a possible further 50, whereas Balinsky lists 37 years. Neither the head lease nor an apartment-specific notarised sublease has been reviewed, so 89 years must not be presented as assured tenure.
  • The apartment parcel, PBG and permitted land use are not documented in the accessible sources. Lyvin currently describes 20 homes, while older Realiste and Alnair listings state 23; the wider villa estate also carries inconsistent 18/32 counts. The register follows the dedicated developer apartment page without merging villa phases into the apartment inventory.

Disputed and unknown information

This keeps the open points in one place. A missing or disputed fact is not treated as a conclusion.

  • Completion remains unresolved. Lyvin’s dedicated page retains a Q3 2026 target that has passed, while the building remains in its ongoing portfolio and Balinsky estimates roughly 90% progress. No apartment handover evidence or SLF has been inspected; a later catalogue date cannot confidently be assigned to this building.
  • Lease duration is disputed. The developer presents 39 years with a possible further 50, whereas Balinsky lists 37 years. Neither the head lease nor an apartment-specific notarised sublease has been reviewed, so 89 years must not be presented as assured tenure.
  • The apartment parcel, PBG and permitted land use are not documented in the accessible sources. Lyvin currently describes 20 homes, while older Realiste and Alnair listings state 23; the wider villa estate also carries inconsistent 18/32 counts. The register follows the dedicated developer apartment page without merging villa phases into the apartment inventory.

FAQ

What does a unit cost in Melasti Apartments?

From 5,755,520,000 IDR — Developer publication · 28 October 2026. The price and availability of a specific unit are confirmed with the developer before reservation.

When is Melasti Apartments due for completion?

2026-Q3. The contractual handover date is fixed in the SPA.

Sources2
  1. Developer's official site — lyvinproperties.co — project reference checked 2026-10-28
  2. Developer's official site — www.linkedin.com — project reference checked 2026-10-28

Reviewed: developer materials and public records. We publish no outbound links.

Read next

Related

Andrey Balinsky — Bali property expert

Andrey Balinsky

NovAsia Bali property expert. He will help compare the unit, location, ownership structure and terms before you decide.

Ask about Melasti Apartments →

Need help with a specific project?

Send the project name, a link or a written offer. We can match the exact property, seller, title route, stage and current unit terms before you decide.

WhatsApp Telegram Contacts

Informational, not a public offer or personal investment, legal or tax advice. Price, availability, payment terms and guaranteed-return/buyback conditions are confirmed per unit with the developer and their contract.