Time Square 11 (Time Castle XI)
Time Square 11, also marketed as Time Castle XI, is a new high-rise condominium by MegaKim World Corp Ltd in BKK3, central Phnom Penh.
Phnom Penh · BKK3

From $44,251Per broker listings, October 2026. Current price list, layouts and availability — discussed one-to-one with a project specialist
Quick — 10-second read
- What it is
- Condominium
- Where
- 155 Street 113, Sangkat Boeung Keng Kang Ti Bei (BKK3), Khan Boeung Keng Kang, Phnom Penh 120104, Cambodia · Phnom Penh
- Stage
- Under construction · 2029
- Price
- From $44,251guide price, final by unit
- Transparency
- 11 facts confirmed · 7 to verify
Gallery
Photographs from the project’s materials.
Comparable projects in the same city
Each option includes a factual reason for the comparison. Price and availability are confirmed for the selected unit.

L Residence Boeung Keng Kang III
Same district; a different housing format

Agile Sky Residence
Same district; a different housing format

Golden One Residence
Same district; a different housing format

Olympia City
Alternative project in the same city
Who is behind this project
- Developer
- Megakim World CorporationDeveloper profile from public dataOpen developer profile →
- Projects with us
- 15
- Transparency
- Public records and project documents are used for checking
Brand ≠ the legal entity signing your contract. This project may use a separate project company or joint venture — verify the seller and developer for the selected unit.
Why this project is worth a look
A central address
The strongest case for Time Square 11 is its actual BKK3 location rather than a themed marketing story. Street 113 places the tower beside the established BKK1 and Russian Market catchments. That makes the exact apartment stack important: floor, sunlight, neighbouring buildings and street exposure can have more impact on daily living than the broad label “BKK3.”
A legible unit mix
Three one-bedroom sizes and one main two-bedroom format make the product easy to compare. There are no unusual duplexes or very large family layouts dominating the scheme. The trade-off is that the smaller homes are sensitive to how area is measured, so buyers should compare usable internal space and contractual area definitions rather than relying on gross square metres alone.
Cash flow is staged
The public 20% / 35% / 45% structure spreads payments over construction instead of requiring full settlement at launch. That can suit buyers who prefer to deploy capital gradually, but the final 45% remains a substantial obligation. The schedule only works if the buyer has a clear funding plan and the contract states what happens if construction or handover moves.
Vertical zoning works
Parking, residential floors and rooftop amenities are separated vertically, which is a practical response to a compact central site. Residents avoid having every function compete at ground level. The missing information is operational rather than architectural: lift capacity, parking allocation and recurring common-area costs are not documented consistently enough in public sources to treat them as established facts.
A visible developer record
MegaKim has earlier Time Square buildings that buyers can inspect in Phnom Penh, giving this project more context than a first launch by an unknown company. That matters, but it should be used as evidence to investigate further, not as a shortcut. Time Square 11 still needs its own contract, licence, title and construction checks.
About the project
Time Square 11, also marketed as Time Castle XI, is a new high-rise condominium by MegaKim World Corp Ltd in BKK3, central Phnom Penh. The core project facts are unusually consistent across the developer's own material, established local agencies and major property portals: the scheme is presented as a 39-storey tower with about 390 homes on Street 113 near Street 390, with June 2029 as the most commonly stated handover target. A formal groundbreaking took place in June 2026 and construction-progress material followed during the summer. By 6 October 2026, it is therefore more accurate to treat Time Square 11 as an active construction project than as a launch that exists only on paper. Buyers should still approach it as an off-plan purchase: several years remain before completion, so the important questions are contractual delivery, construction execution and what the final unit specification will be at handover.
The project is fundamentally an urban-location product. BKK3 sits next to BKK1 and on the same central belt as the Russian Market area, while Street 113 gives the building a conventional city address rather than a resort-style or gated-compound setting. That distinction matters. A resident here is buying access to the everyday fabric of Phnom Penh — cafés, schools, services, offices and established streets — rather than a self-contained lifestyle destination. For a tenant who works or studies in the central districts, that can be more useful than a larger peripheral site. It also means that street noise, outlook, afternoon sun and the distance between neighbouring buildings can vary materially from one stack to another. The project name alone does not tell you whether a particular unit will feel open or enclosed; the exact orientation and floor plan do.
Read moreShow less
The building programme is straightforward. Public project material places the lobby on the entrance level, parking on floors 2 to 6, residences from floor 7 upward, and the amenity zone at roof level. With a reported land plot of roughly 828 square metres, Time Square 11 uses vertical stacking rather than a large landscaped ground plane. The rooftop concept includes a pool, lounge, gym, open-air social areas and a children's room, while other listings mention an island deck, pool lounge and bar. Those facilities are relevant, but their long-term usefulness will depend on operating details that are not yet public in a reliable form: lift capacity, maintenance standards, service charges, opening rules and how heavily shared areas will be used by 390 homes. None of those should be guessed from a render.
The apartment mix is narrow in a good way for buyers who want a simple choice. The most consistently documented gross sizes are 38, 45 and 50 square metres for one-bedroom homes and 75 square metres for the two-bedroom plan. Realestate.com.kh publishes a developer unit schedule allocating 258 units to the one-bedroom category and 132 to the two-bedroom category, matching the stated total of 390. This is therefore a compact-apartment building rather than a broad family-housing scheme. Singles, couples and small households have several entry points; a buyer looking for three bedrooms, generous storage or a large work-from-home layout does not. Orientation also matters because the published sales material assigns individual plan codes to different directions, so the practical comparison should be between specific stacks, not merely between “one bedroom” and “two bedroom.”
Area measurement deserves more attention than the marketing pages give it. Developer-oriented material and the Realestate.com.kh schedule consistently use gross areas of 38, 45, 50 and 75 square metres. Agency listings also publish smaller net figures, but they are not fully consistent with one another: the compact one-bedroom is shown around 28–29 square metres net, the 45-square-metre type around 33–34, the 50-square-metre type around 36–38, and the two-bedroom around 56. The existence of a gross/net gap is normal; the problem is assuming every page is measuring the same thing. Before comparing price per square metre, a buyer needs to know the contractual area definition and which measurement will appear in the ownership documents. For that reason, the unit cards in this dossier use the more stable gross areas and leave the disputed net figures out of the core record.
Public pricing is less stable than the physical specification. A Time Square Cambodia sales page advertises an entry unit around USD 44,251 after a stated discount. APS Cambodia shows an entry point of USD 49,168, while the Realestate.com.kh project profile carries a higher developer-table reference for one-bedroom stock. These numbers can coexist: an off-plan project can have a base schedule, launch promotions, different floors, different agents and changing remaining inventory at the same time. The dossier therefore treats USD 44,251 as the lowest public market anchor seen on 6 October 2026, not as a promise that a buyer can secure any available unit at that figure. A useful quote should identify the unit number, floor, orientation, gross and net area basis, discount, furnishing specification, taxes or transfer fees, service-charge assumptions and every payment date.
The published payment structure is clearer. Multiple sources describe 20% at the sale and purchase agreement, followed by 35% paid as 1% per month for 35 months, with the remaining 45% due at handover. That schedule spreads the cash requirement across construction, but it does not remove the large final obligation. Buyers planning to fund the last 45% from savings should model that amount from the start. Buyers expecting finance should be even more cautious: marketing pages sometimes mention longer-term loan options, but future credit availability to a particular foreign buyer should not be treated as part of the project facts unless it is documented by the lender. The safe reading is simple — the three-stage schedule is public; any discount, mortgage or special financing package belongs to the individual offer.
Foreign ownership is possible in principle, but the legal basis is more specific than the phrase “freehold condo.” Cambodia's 2010 law allows legally qualified foreigners to own private units in co-owned buildings above the ground floor, while the land beneath the building does not become foreign-owned. The foreign ownership ceiling is set at 70% of the total surface area of all private units in the building, not simply 70% of the number of apartments. Time Square 11 is marketed as a strata-title project, which is the correct category for that ownership route. The remaining step is project- and unit-specific due diligence: confirm that the unit is eligible, that foreign quota is still available when title is registered, and that the contract, developer entity and cadastral documentation match what the buyer has been shown.
MegaKim World Corp Ltd brings a longer record than a first-time developer. Its Time Square brand dates to 2011, and the company's current portfolio identifies several completed earlier projects in BKK1 and Toul Kork alongside a larger pipeline under construction. Independent local property sources also document previously delivered Time Square buildings. That track record is relevant because it gives a buyer real buildings to inspect and owners to speak with. It is not a substitute for checking Time Square 11 itself. A developer can have completed earlier projects and still face execution, financing or quality risks on a new tower, particularly while several schemes are active at once. Public sources confirm the developer brand and the project launch, but this research did not obtain an official company-registration extract or a project-specific construction-licence number from a government registry.
The construction timeline needs one careful distinction. The government news agency reported a groundbreaking for Time Square 9 and 11 on 9 June 2026, and progress-report pages published updates during June, July and August. At the same time, several sales profiles list 1 September 2026 as the formal construction-start date. Those statements are not necessarily contradictory; one may refer to ceremonial or enabling works and the other to the contractual construction programme. What matters to a buyer is that physical work appears to have started, while June 2029 remains the dominant published completion target. The sale and purchase agreement should define the contractual handover date, any grace period, the consequences of delay and the point at which the final 45% becomes payable.
Taken together, Time Square 11 is a relatively easy project to understand: a central BKK3 address, a small set of one- and two-bedroom plans, a staged payment schedule, rooftop amenities and a developer with existing buildings in the market. Its limitations are equally concrete. It is still under construction; net-area figures differ between sales channels; entry prices are promotion-sensitive; foreign quota is unit-specific; and the scheme does not serve buyers who need larger family layouts or immediate occupancy. The sensible way to assess it is unit first, project second: verify the chosen apartment's area basis, orientation, title route, full price and payment schedule, then compare that exact proposition with completed stock in BKK3 and nearby BKK1. That produces a far more useful decision than relying on projected yield or generic claims about future appreciation.
Ownership format
The project is marketed with strata title. Under Cambodian law, an eligible foreign buyer may own a qualifying private unit above the ground floor, while aggregate foreign ownership is capped at 70% of the total surface area of the building's private units. The exact unit still requires confirmation of foreign-quota availability, title status and registration documents.
Unit types & sizes
The smallest published layout. A promotional public price starts around USD 44,251, while other current channels quote a higher entry point. Confirm the exact floor, net area and active discount before reservation.
A mid-sized one-bedroom between the compact Type D and the 50 sqm plan. The sales page publishes a figure around USD 52,153, but that should not be assumed to apply to every floor or orientation.
The largest of the main one-bedroom formats. The project sales page shows a public figure around USD 56,894. Net-area figures vary between agency materials, so the selected unit's plan and contract should control.
The main two-bedroom layout and the only consistently documented larger unit type. The project sales page starts around USD 86,922, while current individual listings can be higher.
Gross areas of 38 / 45 / 50 / 75 sqm are the most consistent figures across sources. Published net areas differ by roughly 1–2 sqm for some one-bedroom types, so they are not presented here as a single settled fact. Compare units using the selected plan and the area definition in the contract. Prices are the lowest the brokerage boards publish as of October 2026, not the developer’s price list — the price and availability of a specific unit are something we go through with you personally.
Facilities
11 amenities
Rooftop and leisure
- rooftop pool
- sky lounge
- gym
- open-air deck
- children's room
- pool lounge
Building services
- parking
- lifts
- backup power
- security
- fire safety system
How the tower is arranged
- Entrance levelLobby
- Floors 2–6Parking
- Floors 7–39Residential units
- Roof levelPool, lounge, gym and shared amenities
Location
- Street 113 near Street 390 in BKK3, central Phnom Penh.
- The location sits beside BKK1 and the Russian Market urban catchment, making this a city-living project rather than a resort product.
- Public project material references nearby Monivong Boulevard; actual travel times depend on traffic.
- The coordinates in this record are an address-based map centre for the project area, not a cadastral parcel point.
Address / landmark155 Street 113, Sangkat Boeung Keng Kang Ti Bei (BKK3), Khan Boeung Keng Kang, Phnom Penh 120104, Cambodia
The map loads from OpenStreetMap on request.
The circle shows the project’s approximate location; we confirm the exact address and the plot boundaries when you get in touch. © OpenStreetMap contributors.
Price & purchase terms
- Current price: The lowest public anchor is USD 44,251 on the Time Square Cambodia sales page, checked on 6 October 2026. Other current project pages show entry points around USD 49,168 to USD 64,000, so USD 44,251 should be treated as a promotional floor rather than guaranteed stock. The exact unit, discount, price and terms need written confirmation before reservation.
- Expected completion: June 2029
We show the lowest of the prices the brokerage boards publish: their figures for the same unit differ by a few per cent, and none of them is the developer’s price list. We ask the developer for the current price, availability and payment terms on the unit you are looking at, and go through them with you personally.
How the payments run
- Sale and purchase agreement20% of the unit price
- Construction period35%: 1% per month for 35 months
- HandoverRemaining 45%
Project stage — what we know
Under construction. Handover declared for 2029.
Before booking check escrow, real timeline and the developer track record.
- Planned
- Building
- Done
What is documented on this page
Facts published here and the points to confirm before booking.
The page documents 11 key facts; 7 items should be confirmed before booking; data checked 2026-10-06.
This is a record of published facts, not a quality rating.
At a glance
Is this project right for you?
Tick what describes you — we will show whether this may be a fit. Honest, without gloss.
Your selections are not saved anywhere. This is a decision aid, not an assessment.
Best for: A buyer seeking an under-construction central Phnom Penh condominium with a lower absolute ticket than many larger BKK1 homes.; A single occupier, couple or small household that is comfortable with one- or two-bedroom layouts.; A buyer who can wait for the stated 2029 handover and accepts construction-stage risk.; Someone who prefers staged payments to paying the full purchase price at the beginning.; A foreign buyer who specifically wants a potentially registrable strata-title route and is prepared to confirm foreign-quota availability for the selected unit.; may not suit: A buyer who needs a completed home for immediate occupation or rental.; A household that needs three bedrooms, a large kitchen, a dedicated office or substantially more space.; Someone unwilling to resolve the gross-versus-net area basis before committing to a unit.; A buyer who needs proven service charges, operating amenities and a completed-building management record before purchase..
What we confirm before booking
A short, project-specific list. We request these from the developer and go through them with you before any payment.
- Which plans and documents actually belong to Time Square 11 rather than Time Square 8?
- What is the selected type’s contractual area, and why do the published ranges differ?
- Does this unit use a 35- or 45-month plan, with what balance and assignment rights?
- What are the cadastral location, seller’s legal identity and currently evidenced works stage?
Disputed and unknown information
This keeps the open points in one place. A missing or disputed fact is not treated as a conclusion.
- The developer and several major local sources support 39 storeys and 390 units; one research site lists 500 units and some brokers count 40–41 floors. The registry uses 39 and 390 as the best-supported figures, but the registered floor schedule should be checked in the project documents.
- Agency sources disagree on net areas for the one-bedroom types: roughly 28–29 sqm, 33–34 sqm and 36–38 sqm, while the gross sizes of 38, 45 and 50 sqm are much more consistent. The contract should define which area is being sold and which figure will appear in the title documentation.
- A formal groundbreaking took place on 9 June 2026 and progress reports followed during the summer, while several sales pages state 1 September 2026 as the construction start. The project is treated as under construction; the contractual handover date and any grace period should come from the sale agreement.
FAQ
Is Time Castle BKK3 the same project?
Yes. The reviewed material uses Time Castle BKK3 and Time Castle XI as alternative names for Time Square 11.
Why is there no fixed starting price?
The older amounts came from broker offers; a current official price list has not been established.
Which area figures should a buyer use?
Use the apartment’s signed plan. Sources show 38–75 and 28–56 m² without a reliable explanation of the measurement basis.
Is the instalment term 35 or 45 months?
Both appear in the sources. Neither should be presented as universal before a unit-specific written offer is obtained.
Can Time Square 8 plans be used?
No. It is a different project. Its area figures and title reference do not establish the specification or rights for a Time Square 11 apartment.
Sources and documents
Official developer and public records used for this page. We publish no outbound links.
- Developer's official site — Time Square Cambodia — brand sales portal checked 2026-10-06
- Developer's official site — Time Square 11 BKK3 — Time Castle XI checked 2026-10-06
- Developer's official site — IPS Cambodia — Time Square 11 Time Castle BKK3 checked 2026-10-06
- Developer's official site — IPS — Time Square 11 officially breaks ground in BKK3 checked 2026-10-06
Personally checked by Thavy En — 8 August 2026
For Time Square 11, I reviewed the off-plan BKK3 tower as a 39-storey, 390-unit project scheduled for 2029.
- ✓ Purchase terms
- ✓ Availability
- ✓ Developer details
Compare the individual properties: condition, documents and deal terms can differ within the same development.
This card does not establish legal ownership of the Time Square 11 residence; the transaction documents must be verified independently.
Read next
Related

Valeria Lezhenina
Head of client support and Cambodia property consultant at NovAsia. She will pin down your goal and budget, put together a shortlist of available units, work out the payment plan and check the terms on the specific unit — before you commit, and without passing your contact to third parties.
Message us about Time Square 11 (Time Castle XI) →Need help with a specific project?
Send the project name, a link or a written offer. We can match the exact property, seller, title route, stage and current unit terms before you decide.
Informational, not a public offer or personal investment, legal or tax advice. Price, availability, payment terms and guaranteed-return/buyback conditions are confirmed per unit with the developer and their contract.