NovAsia

Craft Ratchada 32

Craft Ratchada 32 is a small urban condominium in Chan Kasem, Chatuchak, built around compact one-bedroom homes rather than a broad family mix. Its scale is unusually easy to understand for Bangkok: one eight-storey building and 70 units.

BangkokBased on developer material

Overview of Craft Ratchada 32 in Bangkok

From 3,000,000 THBCurrent price list, layouts and availability — discussed one-to-one with a project specialist

QUICK — 10-SECOND READ

Quick — 10-second read

What it is
Condominium
Where
Soi Ratchadaphisek 36 Yaek 19-9, Chan Kasem, Chatuchak, Bangkok 10900, Thailand · Bangkok
Stage
Under construction · 2026
Price
From ฿3,000,000guide price, final by unit
Transparency
10 facts confirmed · 3 to verify

Why this project is worth a look

Only 70 homes

The project is one eight-storey building with 70 units, giving buyers a genuinely small development rather than a mass-market estate. That does not guarantee privacy or low fees, but it changes the operating scale and may appeal to someone who prefers a building with fewer neighbours and a simpler shared-space programme.

Two layout ideas

The range is built around 24 and 28 sqm, each offered as a conventional one-bedroom and a loft version. The decision is therefore less about bedroom count and more about how the buyer wants to use vertical space. For loft units, ceiling height, stair practicality and the legally registered area deserve more attention than the visual drama of a mezzanine.

Everyday Bangkok location

Chan Kasem sits within the working city rather than a visitor-driven enclave, with universities, malls, hospitals and access toward Ratchadaphisek, Lat Phrao and Ratchayothin. That can suit an owner with regular commitments in north-central Bangkok. The building is not confirmed as station-front, so the last-mile part of the commute remains part of the purchase decision.

Useful shared spaces

A rooftop pool, fitness room, co-working area and lobby add places to spend time outside a compact apartment. That is potentially more valuable here than an oversized amenity catalogue. The economics still depend on the eventual common-area fee and sinking fund, which are not reliably published in the current open material.

Visible progress, open timing

The developer reports 73% overall progress with the structural work complete, so this is a physically advancing project rather than a paper launch. Third-party databases disagree on the completion year, however. The buyer should treat the contractual handover date and delay provisions as the decision-grade evidence.

About the project

Craft Ratchada 32 is a small urban condominium in Chan Kasem, Chatuchak, built around compact one-bedroom homes rather than a broad family mix. Its scale is unusually easy to understand for Bangkok: one eight-storey building and 70 units. That does not automatically make it quiet or inexpensive to operate—the surrounding neighbourhood is dense and distinctly urban—but it does mean the project starts from a very different proposition than a tower or multi-building estate with several hundred apartments. As of 6 September 2026 it should not be presented as completed. The developer’s live project page reports overall construction at 73%, with the structure at 100% while engineering and architectural work remain in progress. A buyer is therefore taking construction and delivery risk, not purchasing a mature resale unit with an established operating history.

The apartment range is deliberately narrow. Public project material confirms four configurations: a 24 sqm one-bedroom, a 28 sqm one-bedroom, and loft versions advertised at the same 24 sqm and 28 sqm figures. This is not a development designed around two- and three-bedroom family homes. Its appeal is closer to efficient city living: a separate bedroom within a small footprint, with the loft layouts adding vertical separation rather than more conventional floor area. The important due-diligence question is how the upper level is treated legally and commercially. Public sources do not provide a separate net area for the mezzanine, so buyers should not assume that an upper platform can simply be added to the stated 24 or 28 sqm. The sale contract, registration documents and actual dimensions need to tell the same story.

Read moreShow less

The name points buyers toward Ratchada 32, while the more detailed address used for navigation is Soi Ratchadaphisek 36 Yaek 19-9, Chan Kasem, Chatuchak. That apparent mismatch is best solved with the project pin rather than by trying to rewrite the address from the brand name. The developer’s directions link resolves to 13.8194291, 100.5861319. This matters because Craft is an inner-soi project, not a building sitting directly above a rail station. The developer positions it around access to the Blue and Yellow lines and the broader Ratchadaphisek–Lat Phrao–Ratchayothin network. For an owner-occupier, the useful test is the door-to-door trip at the hours they actually commute, including the first and last stretch through the local street network.

The location is driven by everyday Bangkok demand rather than resort or short-stay tourism. The project’s own location material highlights Central Ladprao, Union Mall and Plaza Lagoon, Chandrakasem Rajabhat University, and Paolo hospitals at Chokchai 4 and Kaset. That gives the area a practical mix of education, shopping, healthcare and employment connections. It can work well for someone whose daily life sits around Chatuchak, Lat Phrao, Ratchayothin or Ratchadaphisek. For an investor, however, surrounding demand generators should not be converted automatically into a rental-yield claim. PropertyHub currently shows no active sale or rental listings under the Craft Ratchada 32 project profile, so there is no mature specific to the project dataset of achieved rents, resale liquidity or tenant turnover yet. Any underwriting today is necessarily more provisional than it would be for an established completed building.

The amenity list is compact but relevant to small-unit living. The official project page specifies a fitness room, a rooftop swimming pool, co-working space, a lobby, CCTV, 24-hour security, keycard access, a passenger lift and floor-locking lift access. It is more useful to read these as extensions of a 24–28 sqm home than as a resort package. A resident can exercise, work outside the apartment for part of the day, meet someone in the lobby and use the pool without needing a large private unit. The missing piece is the operating cost. Reliable public material does not establish the final common-area fee, sinking fund or parking count. Those numbers will determine whether the amenity package remains proportionate to the price of a small apartment once the building is handed over.

Pricing needs more caution than a single headline suggests. YOUR Corporation’s current Thai Craft page and corporate home page advertise a range of THB 3.0–5.6 million, while the English version of the same project simultaneously retains a THB 2.29 million starting figure. Independent project coverage has also recorded THB 3.6 million. The registry therefore uses THB 3.0 million as the lower bound of the current Thai developer page, not as a promise that any particular unit can still be bought for that amount. Before reservation, the buyer needs a dated price sheet tied to a unit number, floor, orientation, stated area, furniture package and all mandatory charges. This is particularly important for the loft layouts because public sources do not provide a current price ladder by unit type.

Delivery timing is another area where the sources do not line up. PropertyHub labels the project as completed in 2025, which conflicts with the developer’s live 73% progress figure. TerraBKK lists a finish date of 31 December 2026. The most defensible current treatment is therefore 'under construction' with 2026 used only as a working completion reference. That does not make 31 December the contractual handover date for every purchaser. The legally relevant date is the one in the sale-and-purchase agreement, together with the clauses governing extensions, notices and remedies for delay. A public progress meter is valuable evidence that the building is physically advancing, but it is not a substitute for a contractual delivery obligation.

The developer is clearly identified as YOUR Corporation Co., Ltd., which operates the official Craft Ratchada 32 site and published the project’s foundation-pillar ceremony held on 31 July 2024. The company’s own portfolio also shows The Collect Ratchada 32 as sold out, so Craft is not its first project associated with this part of Bangkok. That history is useful context, but it should not be mistaken for a warranty. A purchase still depends on the legal seller named in the contract, the project land position, approvals, payment account and handover obligations. The public dossier can establish the developer identity and a visible construction record; project-level encumbrances, permits and financial commitments belong in transaction due diligence based on current documents.

For a foreign buyer, the legal question is the ownership form of the selected unit after the building is registered as a condominium. Thai rules allow foreigners to hold registered condominium ownership within the foreign quota, which may not exceed 49% of the total condominium unit area in the building. Public project material does not disclose the remaining foreign quota at Craft Ratchada 32. That means the buyer should confirm the ownership form and quota allocation before treating a unit as foreign freehold inventory. The mechanics of bringing purchase funds into Thailand and the documents required for registration should also be aligned with the transaction before transfer. A generic statement that the development is a 'condo' is not enough to establish that a specific unit is available to a foreign buyer in freehold form.

Taken as a whole, Craft Ratchada 32 is a specific rather than universal proposition: 70 units, compact 24–28 sqm one-bedroom formats, optional loft layouts, and an everyday urban setting within Chatuchak. Its strengths are easy to articulate without sales language. The building is small, the apartment range is simple, and the common areas are designed to support residents who live in limited private space. Its constraints are equally clear. Construction is still ongoing, the developer’s price pages are inconsistent, the full payment schedule and operating charges are not publicly confirmed, and there is no established specific to the project rental history yet. The right way to assess it is from the selected unit outward—floor, orientation, loft geometry, final price, foreign-quota status and contractual handover date—rather than from a generic claim about Bangkok investment potential.

Ownership format

In a registered condominium, a foreign buyer may hold a unit in freehold within the foreign quota, which may not exceed 49% of the total condominium unit area in the building. Remaining quota for the selected Craft Ratchada 32 unit needs separate confirmation.

Unit types & sizes

1 bedroom
24 sqm

The smallest conventional layout in the project. It suits one person or a couple who value a separate bedroom more than generous floor area; the practical test is how much usable space remains for storage, a desk and a workable kitchen rather than the headline square metres alone.

1 bedroom
28 sqm

The larger single-level option keeps the plan conventional and avoids a stair or mezzanine. The extra four square metres may be more valuable than a dramatic vertical layout for an owner who wants straightforward daily use, although the actual room arrangement still needs to be checked unit by unit.

1 bedroom loft
24 sqm stated area

The compact loft format uses vertical volume to change how the apartment feels, but it needs the most careful document check. The mezzanine area should not simply be added to the advertised 24 sqm: public sources do not confirm a separate net figure for the upper level, so the contractual and registrable area needs to be clear before reservation.

1 bedroom loft
28 sqm stated area

The largest confirmed layout remains compact by family-housing standards. Its appeal is the combination of a 28 sqm stated area with vertical zoning; the real value depends on ceiling height, stair usability, the upper-level arrangement and the area that is legally attached to the condominium unit.

Public material confirms four advertised formats: 24 sqm and 28 sqm conventional one-bedrooms, plus loft versions using the same stated areas. A separate net mezzanine area, bathroom count, exact internal height and current pricing by layout are not reliably published. For the loft units in particular, the marketing plan should be reconciled with the area stated in the sale contract and the area that will be registrable on title.

Facilities

9 amenities

Fitness and leisure

  • rooftop swimming pool
  • fitness room

Work and shared space

  • co-working space
  • lobby

Security

  • 24-hour security
  • CCTV
  • keycard access
  • floor-locking lift access

Vertical access

  • passenger lift

Location

  • The project is in Chan Kasem, Chatuchak; the detailed navigation address is Soi Ratchadaphisek 36 Yaek 19-9, Bangkok 10900.
  • The developer’s map link resolves to 13.8194291, 100.5861319; use the project pin for viewings rather than relying on the Ratchada 32 branding alone.
  • The wider transport context includes MRT Lat Phrao, the Yellow Line and BTS Ratchayothin, but Craft is not confirmed as a station-front building.
  • The developer’s local amenity list includes Central Ladprao, Union Mall and Plaza Lagoon.
  • Chandrakasem Rajabhat University and its demonstration school add a stable education component to the surrounding area.
  • Healthcare references include Paolo Chokchai 4 and Paolo Kaset; actual journey times vary with Bangkok traffic.

Address / landmarkSoi Ratchadaphisek 36 Yaek 19-9, Chan Kasem, Chatuchak, Bangkok 10900, Thailand

The map loads from OpenStreetMap on request.

The circle shows the project’s approximate location; we confirm the exact address and the plot boundaries when you get in touch. © OpenStreetMap contributors.

Price & purchase terms

  • Current price: From THB 3.0M on YOUR Corporation's current Thai project page as of 6 September 2026. This is a developer-advertised lower anchor; the selected unit, availability, package and final terms need separate confirmation.
  • Expected completion: 2026
Under construction

Project stage — what we know

Under construction. Handover declared for 2026.

Before booking check escrow, real timeline and the developer track record.

  1. Planned
  2. Building
  3. Done
Verified by NovAsia

Transparency index

Facts already published on this page and points we clarify together.

10documented key facts
3we clarify before bookingwe go through these together, not as stop factors

The project has 10 documented key facts; 3 items are clarified before booking.

We count facts already published on this page. The index does not assess the project’s quality.

At a glance

DeveloperYOUR Corporation
LocationBangkok
CategoryCondominium
SubtypeLow-rise residential condominium
ConstructionUnder construction
Floors8
Units70
✦ Similar projects

Similar options nearby and in budget

Compare before you decide — same area and price level.

Honest fit

Is this project right for you?

Tick what describes you — we will show whether this may be a fit. Honest, without gloss.

Likely yes if
May not suit if

→ Discuss with a consultant

Your selections are not saved anywhere. This is a decision aid, not an assessment.

Best for: A single buyer or couple seeking a new compact one-bedroom in north-central Bangkok.; Someone who consciously prefers a 70-unit low-rise building to a large tower or multi-building condominium.; A buyer interested in choosing between a conventional plan and a loft layout and willing to verify the legal treatment of the mezzanine area.; An owner-occupier whose routine is around Chatuchak, Lat Phrao, Ratchayothin or Ratchadaphisek and who is comfortable with an inner-soi last mile.; An investor prepared to wait for completion and base rental assumptions on real post-handover evidence rather than a promised yield.; may not suit: Not suitable for a buyer who needs immediate move-in, because the developer still reports incomplete construction.; A weak fit for a household needing two or more bedrooms or materially larger floor plates; the confirmed range is only 24–28 sqm.; Not the natural choice for someone who requires direct station-front access from the building.; Not suitable for an investment thesis that depends on guaranteed income; no verified rental-guarantee programme or mature in-building rental history was found..

What we confirm before booking

A short, specific to the project list. We request these from the developer and go through them with you before any payment.

  • the legal entity in the SPA and the payee’s bank details
  • the title format and what is registered against the unit
  • the contractual handover date in the SPA — the page shows the date from the project’s materials
  • the contractual area of the chosen unit, and which basis it is measured on

Disputed and unknown information

This keeps the open points in one place. A missing or disputed fact is not treated as a conclusion.

  • Completion timing conflicts across sources: PropertyHub labels the project completed in 2025, the developer shows only 73% progress as of 6 September 2026, and TerraBKK lists 31 December 2026. The registry uses 2026 as a working reference, but the contractual handover date must come from the current sale agreement.
  • YOUR Corporation’s own pages are not price-synchronised: the Thai page shows THB 3.0–5.6M while the English page shows a THB 2.29M starting figure. The registry uses THB 3.0M as the current Thai-page lower bound; actual availability and final unit pricing need confirmation.
  • Current public material does not reliably confirm the payment schedule, common-area fee and sinking fund, parking count, or remaining foreign-quota inventory for specific units.

FAQ

What does a unit in Craft Ratchada 32 cost?

From 3,000,000 THB. The price and availability of a specific unit are confirmed with the developer before reservation.

When is Craft Ratchada 32 due for completion?

2026. The contractual handover date is fixed in the SPA.

Sources and documents

Official developer and public records used for this page. We publish no outbound links.

  1. Government / official registry checked 06.09.2026

Read next

Related

Mark Erometskiy — Thailand property expert

Mark Erometskiy

Thailand property expert (Pattaya, Phuket and Bangkok), co-founder of Bomi Home. Will help with the unit, ownership, stage and terms before you decide.

Ask about Craft Ratchada 32 →

Need help with a specific project?

Send the project name, a link or a written offer. We can match the exact property, seller, title route, stage and current unit terms before you decide.

WhatsApp Telegram Contacts

Informational, not a public offer or personal investment, legal or tax advice. Price, availability, payment terms and guaranteed-return/buyback conditions are confirmed per unit with the developer and their contract.