J Tower 3
J Tower 3 is a high-rise residential development under construction in Sangkat Tonle Bassac, in the southern part of central Phnom Penh.
Phnom Penh · ChamkarmonBased on developer material
renderFrom $330,000Per broker listings. Current price list, layouts and availability — discussed one-to-one with a project specialist
Quick — 10-second read
- What it is
- Condominium · 3 bedrooms and above, 166–510 m²
- Where
- Phnom Penh
- Stage
- Under construction · 2028
- Price
- From $330,000guide price, final by unit
- Transparency
- 13 facts confirmed · 7 to verify
Who is behind this project
- Developer
- Tanichu Assetment Co., LtdPrivate companyOpen developer profile →
- Track record
- J-City Condominium — completed in 2016 according to the group timeline.
- Projects with us
- 3
- Transparency
- Public records and project documents are used for checking
Brand ≠ the legal entity signing your contract. This project may use a separate project company or joint venture — verify the seller and developer for the selected unit.
Why this project is worth a look
Genuinely large homes
The standard offer starts with three-bedroom apartments of 166 and 178 sqm rather than studios. That makes the project relevant to family occupation and buyers who need substantial living space, while also narrowing the tenant pool and raising the entry budget.
A vertical private club
Dedicated floors are planned for pools, fitness, wellness, an internal park, work areas and entertainment. The programme can reduce reliance on external amenities, but the eventual service charge, opening hours and access rules should be confirmed before purchase.
Central Tonle Bassac
The official address places the building in Sangkat Tonle Bassac, Khan Chamkarmon, beside the southern edge of BKK1. It is an urban choice for owners who want established central districts rather than a resort-style or peripheral master-planned community.
A long delivery window
The official schedule points to completion in December 2028 and delivery in January 2029. That may suit a staged capital plan, but it does not provide immediate use or income; timing risk and every payment milestone belong in the contract review.
Inventory must be live
IPS displays two apartments from $330,000 while several official type pages are marked sold out. The practical response is not to choose the more convenient claim, but to have NovAsia verify the exact unit, seller, floor, price and terms before reservation.
About the project
J Tower 3 is a high-rise residential development under construction in Sangkat Tonle Bassac, in the southern part of central Phnom Penh. The official project website gives the address as No. 71, Poum 13, Sangkat Tonle Bassac, Khan Chamkarmon and describes a tower with 77 levels above ground plus two basement floors. Its current project specification states a height of 333 metres and a total of 360 residences. This is not a volume condominium built around compact studios. The core offer consists of large three-bedroom homes measuring 166 or 178 sqm. The official specification also lists 332, 344 and 510 sqm floor areas associated with the premium upper section, although the accessible English material does not provide a complete room-by-room schedule for those larger formats. Construction was scheduled to start in December 2023, with completion in December 2028 and handover in January 2029. A buyer is therefore taking a long development horizon rather than purchasing a home that can be occupied or rented immediately.
The product sits in a very different part of the Phnom Penh market from projects that use studios and one-bedroom units to create a low entry price. Even the standard J Tower 3 layouts are family-sized. As checked on July 17, 2026, IPS displayed a 178 sqm Type B three-bedroom unit at $330,000 and a 166 sqm Type A unit at $340,000. Those listings provide a lower market anchor, not a promise that either apartment remains available or can be purchased on identical terms. Several official room-type pages are marked sold out, while the IPS project page still displays two units for sale. Inventory can move between a developer, appointed agencies and resale owners, so the two statements do not automatically cancel each other out. Before any financial decision, obtain the live availability list, exact floor and orientation, specification, seller identity, payment schedule and legal route for the selected apartment.
Read moreShow less
The tower’s vertical amenity programme is one of its clearest distinguishing features. Entertainment and family facilities are assigned to level 11, an internal garden to level 26, a gym and sports pool to level 27, water and wellness facilities to level 49, the main residents’ salon to level 50, and a sky pool, bar and restaurant to level 77. The official building information also mentions an observatory on level 78, refuse stations on every residential floor, eight lifts and parking between B1 and the tenth level. In practice, the project is designed as a private vertical club where exercise, leisure, informal work and family activities can happen without leaving the building. That breadth is useful, but it also creates a due-diligence question. Public materials do not disclose the management fee, guest access rules, operating hours or the long-term budget for pools, lifts and specialist facilities. These costs and rules should be reviewed before reservation.
The residential concept prioritises space, ceiling height and broad city views. Published visuals show generous living rooms, extensive glazing and high-volume interiors. IPS describes the standard stock as three-bedroom residences from 166 to 178 sqm, while the official website separates a number of orientations within those two sizes. The current Type A listing states two bathrooms and the Type B listing states three. The upper portion is presented as a separate premium and penthouse collection, beginning around the seventieth floor on the plan page, and the official specification includes areas up to 510 sqm. We have not assigned an unverified number of bedrooms or bathrooms to those larger residences. For any shortlisted unit, the buyer should request a dimensioned plan, confirmation of whether the quoted area is gross or net, ceiling height, aspect, view, furniture package and finish schedule. A polished render is useful for understanding the concept, but it is not a substitute for the contractual technical specification.
Administratively, the project is in Tonle Bassac, Khan Chamkarmon, next to the southern edge of BKK1. This is a central urban location rather than a resort, satellite-city or suburban proposition. It may suit owners who value access to Phnom Penh’s established business, diplomatic, dining and service districts. Marketing pages often call the area South BKK1, but that shorthand should not replace the official address: the sangkat is Tonle Bassac. The dossier therefore uses the complete project address rather than a loose neighbourhood label. Coordinates are supplied with a transparent radius because address numbering and public map pins in Phnom Penh do not always resolve with equal precision. No hand-estimated distances to malls, schools, embassies or the river have been inserted into this record.
The named developer is Tanichu Assetment Co., Ltd. The official website says the company has operated in Cambodia since 2013 in construction and real-estate management. Market material frequently places J Tower 3 within the same development line as earlier J-branded buildings, but that history is not treated here as a guarantee of delivery, build quality or investment performance. The record separates verifiable project data from promotional claims about prestige, reliability, appreciation or rental yield. A transaction should be supported by the seller’s legal identity, project approvals, the sale and purchase agreement, refund and default clauses, bank-account details, a written handover specification and evidence for the title route offered to the buyer. IPS labels the apartment ownership as Strata Title, while the official building table describes the land rights simply as Ownership. These statements concern different layers of property rights and should be reconciled through documents rather than compressed into a single marketing phrase.
Public payment information is limited. IPS lists a 15% down payment and a separate entry stating that loan terms are available for 40%, but it does not expose the full milestone calendar, reservation mechanics, due dates, financing conditions, penalties or balance payable at handover. For that reason, this dossier does not invent a multi-step schedule. A payment plan shown by another agency cannot safely be assumed to apply to every unit: terms may vary by seller, floor, transaction date and whether the apartment is a direct developer sale or an assignment. Confirm the live schedule before any reservation money is transferred. The same caution applies to furniture, appliances, parking and time-limited incentives. The official specification lists 252 leased parking spaces for 360 homes, which does not mean that a space is automatically attached to every apartment.
J Tower 3 should be assessed as a specialised large-format proposition. It is a logical shortlist for a buyer who actively wants three bedrooms, accepts an off-plan horizon and values an unusually extensive internal amenity programme. It is a poor match for someone seeking an inexpensive studio, a small easy-to-trade unit or immediate rental income. The published lower anchor of about $330,000 excludes future transaction, furnishing, holding, tax and financing costs. Rental and resale outcomes cannot be inferred from the tower’s height or visual impact alone; they will depend on actual demand for homes of this size, the eventual service charge, operating quality and competing supply at handover. The project’s strength is the rare combination of generous floor area, a central address and club-scale facilities. The trade-off is a high entry ticket, incomplete public visibility on current stock and a wait until the scheduled January 2029 delivery.
Gallery
Visuals from the project’s materials. The built result and the finishes can differ.
Renders are not a fit-out specification
Interior and amenity images communicate a design concept, but they do not establish which materials, furniture, appliances, sanitary fittings or built-in systems are included in the selected unit price. The useful contractual reference is a dated SPA schedule stating the brand or technical grade, quantity, model or permitted equivalent for each material item.
Before signing, assemble the unit plan, finish schedule, equipment list, door and window standard, kitchen and bathroom specification, air-conditioning scheme and substitution clause. For anything described as ‘or equivalent’, define minimum performance and the buyer-notification process so that a material downgrade cannot hide inside an overly broad specification.
Unit types & sizes
A large family layout from the project’s standard collection. IPS displays one Type A listing, but its floor, orientation, included specification and continued availability require separate confirmation.
The larger standard configuration. This listing creates the project’s current lower public anchor, but it is not a confirmed NovAsia offer until the inventory and seller have been checked.
These areas appear in the current official building specification. The accessible English material does not provide a complete room, bathroom, orientation or availability schedule, so those details have not been reconstructed.
The openly documented standard collection consists of three-bedroom homes of 166 and 178 sqm. The official specification also lists 332, 344 and 510 sqm areas, but the accessible English material does not give a complete composition for those residences. No area has been recalculated or labelled net or gross without an explicit source statement. Prices are the lowest the brokerage boards publish, not the developer’s price list — the price and availability of a specific unit are something we go through with you personally.
How to verify the stated floor area
The official brochure shows a Type 166 sqm layout, but the published drawing does not include dimension strings or explain whether the figure is internal, gross, saleable, or inclusive of the balcony and structural elements. A price-per-square-metre comparison is therefore meaningful only after obtaining figures measured on the same basis.
Ask for the SPA schedule containing the plan of the exact unit, a room-area schedule, the measurement method and the permitted difference between contractual and completed area. The contract should also explain how the price changes if the measured area differs and whether a defined variance gives the buyer a right to recalculation or another contractual remedy.
Facilities
20 amenities
Sport and pools
- level-77 sky pool
- level-27 sports pool
- fitness gym
Wellness
- indoor and children’s pools
- sauna
- Japanese-style public bath
- spa
- laundry service
Family and entertainment
- children’s play area
- billiards
- table tennis
- two bowling lanes
- four karaoke rooms
- internal green park
Work and resident services
- business room
- cafe and lounge
- wine bar
- mini-shop
- nurse station
- refuse station on each floor
How the tower is arranged
- B1–level 10Parking levels
- Level 11Family entertainment and nurse station
- Level 26Internal green park
- Level 27Fitness and sports pool
- Level 49Pools, spa, sauna and laundry service
- Level 50Main salon, cafe, business room and mini-shop
- Levels 77–78Sky pool, bar, restaurant and observatory
Location
- The official address is in Sangkat Tonle Bassac, Khan Chamkarmon; South BKK1 is a market shorthand rather than the administrative address.
- The central urban setting may suit owners who value Phnom Penh’s established business, diplomatic and lifestyle districts.
- The height and large floor plates target long-term occupation or a narrow premium segment rather than mass-market small-unit rental.
Address / landmarkNo. 71, Poum 13, Sangkat Tonle Bassac, Khan Chamkarmon, Phnom Penh
The map loads from OpenStreetMap on request.
The circle shows the project’s approximate location; we confirm the exact address and the plot boundaries when you get in touch. © OpenStreetMap contributors.
Near the project
Landmarks around the project, from open maps (OpenStreetMap):
Distances are straight-line from the project, not walking routes — the real route is longer. © OpenStreetMap contributors.
Price & purchase terms
- Current price: From $330,000 on the IPS listing checked July 17, 2026. This is a lower public market anchor; the selected unit, price, seller, specification and transaction terms must be confirmed personally with a NovAsia specialist.
- Expected completion: 2028-12
We show the lowest of the prices the brokerage boards publish: their figures for the same unit differ by a few per cent, and none of them is the developer’s price list. We ask the developer for the current price, availability and payment terms on the unit you are looking at, and go through them with you personally.
Project stage — what we know
Under construction. Handover declared for 2028.
Before booking check escrow, real timeline and the developer track record.
- Planned
- Building
- Done
Transparency index
Facts already published on this page and points we clarify together.
The project has 13 documented key facts; 7 items are clarified before booking; data checked 2026-08-27.
We count facts already published on this page. The index does not assess the project’s quality.
At a glance
Similar options nearby and in budget
Compare before you decide — same area and price level.
Gated villa community · CompletedThe Star Platinum Eco Melody
Commercial shophouse development · CompletedThe Aphivath Town
Completed gated link-house and villa community · CompletedBorey Peng Huoth — The Star Natural
Is this project right for you?
Tick what describes you — we will show whether this may be a fit. Honest, without gloss.
Your selections are not saved anywhere. This is a decision aid, not an assessment.
Best for: Families and owner-occupiers who genuinely need three bedrooms and at least 166 sqm.; Buyers with a budget from the current public anchor of roughly $330,000 plus room for ownership, transaction and furnishing costs.; Clients comfortable with a construction horizon extending to the scheduled January 2029 handover.; Residents who will actually use the pools, fitness, wellness, work and family facilities rather than treating them only as marketing imagery.; Investors prepared to test real demand for large three-bedroom homes without relying on advertised yield or appreciation claims.; may not suit: Buyers seeking a studio or compact apartment at the lowest possible entry price.; Anyone who needs a completed property for immediate occupation or rental.; Investors whose strategy depends on the broad mass-market liquidity of small units.; Buyers unwilling to verify the service charge, facility rules, title route, seller and full payment schedule before commitment..
What we confirm before booking
A short, specific to the project list. We request these from the developer and go through them with you before any payment.
- Verify the official address of the selected property in Tonle Bassac and do not replace it with the South BKK1 marketing label.
- Check the contractual handover date in the SPA against the current official schedule of December 2028 completion and January 2029 delivery.
- Verify the site area in primary documents: the official site states 1,836 sqm while Knight Frank reports 1,993 sqm.
- Confirm current construction progress, inventory, title, final management fee, and pet and short-term-rental rules.
Disputed and unknown information
This keeps the open points in one place. A missing or disputed fact is not treated as a conclusion.
- Public height figures conflict: the current official specification and the structured IPS field state 333 m, while the 2023 official brochure and IPS narrative state 320 m. The registry uses the current official 333 m figure; the final height should be checked against current project documentation.
- Availability conflicts: several official type pages are marked sold out, while IPS, updated January 8, 2026, displays two units for sale. NovAsia must confirm the specific unit, seller and price before reservation.
- The official site gives a land area of 1,836 sqm and Land rights: Ownership, while IPS lists 1,993 sqm and Strata Title. These may reflect different measurement conventions and different layers of rights, but they cannot be merged without the project and unit title documents.
FAQ
What does a unit in J Tower 3 cost?
Type A — 3 bedrooms — from $340,000 on the IPS listing checked July 17, 2026; Type B — 3 bedrooms — from $330,000 on the IPS listing checked July 17, 2026. Prices are the lowest the brokerage boards publish, not the developer’s price list — the price and availability of a specific unit are something we go through with you personally.
When is J Tower 3 due for completion?
2028-12. The contractual handover date is fixed in the SPA.
Sources and documents
Official developer and public records used for this page. We publish no outbound links.
- Developer's official site — J-Tower 3 Cambodia checked 2026-07-11
- Developer's official site — J-Tower3 Condominium — Building Information checked 2026-07-16
- Developer's official site — J-Tower3 Facility checked 2026-07-16
- Developer's official site — J-Tower3 Safe and Secure checked 2026-07-16
Current information confirmed by Nita Pich — 1 August 2026
J Tower 3 is a construction-stage project focused on large residences, from three-bedroom layouts to homes of roughly 510 square metres. The review covered released units, prices and the instalment schedule, then compared site progress and the December 2028 target with Tanichu Assetment’s current amenity specification.
- ✓ Purchase terms
- ✓ Payment terms
- ✓ Project status
Even J Tower 3’s standard homes start at three bedrooms and 166–178 sqm, with upper-level residences published at 332, 344 and 510 sqm. The specification lists 252 leased parking spaces for 360 homes, so a parking right should never be assumed to accompany a premium unit. The parking lease needs its own term, renewal and transfer rules, separate from ownership of the apartment.
A separate due-diligence pass is required for the exact lot and purchase agreement.
Read next
Related

Valeria Lezhenina
Head of client support and Cambodia property consultant at NovAsia. She will pin down your goal and budget, put together a shortlist of available units, work out the payment plan and check the terms on the specific unit — before you commit, and without passing your contact to third parties.
Message us about J Tower 3 →Need help with a specific project?
Send the project name, a link or a written offer. We can match the exact property, seller, title route, stage and current unit terms before you decide.
Do not assume a parking space is included with the apartment
The current project specification lists 252 parking spaces for 360 residences, equal to an average of 0.7 space per home. That ratio does not establish that the selected unit comes with an allocated bay. The description leased spaces also needs documentary clarification, including the duration of the right, the fee, transferability with the apartment and the rules for changing an assigned space.
Before reservation, request the parking number or category, the relevant level plan, the proposed agreement or schedule, and every one-off or recurring charge. Where parking is provided through a queue, lease or separate contract, that arrangement should be reflected in both the full ownership-cost calculation and the resale document pack.
Choose the unit within the tower, not only the floor number
The official brochure divides the residential accommodation into levels 12–25, 28–47 and 51–76. These zones are separated by the park on level 26, fitness and pool facilities on level 27, the water and wellness level on 49, the main communal floor on 50 and the sky facilities on 77. Units with a similar view can therefore have different day-to-day operating conditions.
For the selected home, request the typical floor plan and mark its distance from the lift lobby, refuse room, service shafts and the nearest amenity floor. Where a unit sits close to shared facilities, confirm opening hours, guest access, staff circulation, acoustic measures and event rules; these points may matter more than a modest difference in height.
Handover should test the tower systems as well as the unit
For a high-rise development, inspecting the apartment alone is not enough. Before final payment, the buyer should obtain evidence that accessible common areas are commissioned and test the lifts, water supply and pressure at the selected level, backup power, fire alarm, evacuation routes and service access alongside the unit finishes and equipment.
The inspection record should separate private-unit defects from building-system issues, set correction deadlines and preserve a repeat-inspection right. If some amenities will open after the residential section, the contract should identify those areas, their completion dates and the consequences of delay rather than relying on a general promise that the full facility programme will eventually be available.
Informational, not a public offer or personal investment, legal or tax advice. Price, availability, payment terms and guaranteed-return/buyback conditions are confirmed per unit with the developer and their contract.