Hidden City Ubud
Hidden City Ubud is best understood as a development with several distinct property products, rather than a single resort where every buyer receives the same thing.
Jl. Made Lebah, Mas, Kecamatan Ubud, Kabupaten Gianyar, Bali 80571, Indonesia

From 1,750,037,800 IDRPer broker listings, October 2026. Current price list, layouts and availability — discussed one-to-one with a project specialist
Quick — 10-second read
- What it is
- Mixed-use
- Where
- Jl. Made Lebah, Mas, Kecamatan Ubud, Kabupaten Gianyar, Bali 80571, Indonesia · Ubud
- Stage
- Under construction · 2026
- Price
- From 1,750,037,800 IDRguide price, final by unit
- Transparency
- 8 facts confirmed · 6 to verify
Gallery
Photographs from the project’s materials.
Why this project is worth a look
More than one product
Studios, multilevel townhouses and family-sized villas share a development name without sharing the same use case. Choosing the right unit means considering privacy, services and maintenance requirements as well as the price.
An operating villa section
Guest listings and stay reports provide a window into what the completed homes are actually like. That evidence is useful for the first phase, but it cannot certify the delivery status of the hotel-style apartments.
A practical Ubud base
The Jalan Made Lebah location makes restaurants and the arts-and-wellness side of Ubud relatively accessible. Buyers seeking daily beach access will have a different set of priorities.
Amenities need definition
Pools and wellness facilities appear in live accommodation descriptions, while larger retail and entertainment elements remain part of the development vision. Availability and access charges should be established in writing.
A tangible due-diligence route
The published layouts give a starting point for choosing a unit. From there, the meaningful work is to confirm the lease, project permissions, handover obligations and property-management costs instead of relying on forecast returns.
About the project
Hidden City Ubud is best understood as a development with several distinct property products, rather than a single resort where every buyer receives the same thing. Its first residential section comprises houses and townhouses; another section is marketed as hotel-style apartments; further commercial and leisure facilities are planned. The appeal is the chance to choose between privacy and managed hospitality. The complication is that completion, operating costs, tenancy arrangements and handover obligations need to be established separately for each part of the scheme.
Read moreShow less
There is evidence of real use, but only for part of the development. Villas and townhouses are labelled ready for handover in the developer's catalogue, with June 2025 given for that product group. Booking platforms advertise stays at Hidden City Ubud, and guest accounts refer to kitchens, two-storey accommodation and staff on site. That demonstrates an operating hospitality offering, rather than merely an artist's impression. It does not establish that every building has been formally accepted or that every owner may operate short-term rentals under the same permissions.
The apartment building is a different proposition. The project's public material still shows a third-quarter 2026 delivery target for studios and one- and two-bedroom apartments. That quarter has passed as of the research date. Another sales site gives the fourth quarter of 2026, and industry listings continue to mark the development as under construction. With no independently verified handover record for the apartment phase, a purchaser should distinguish the date on the website from an enforceable completion milestone. The entire project cannot reasonably be described as completed.
The location is more specific than the familiar sales pitch about being in the heart of Ubud. The map link on the project website points to the southern Ubud area near Jalan Made Lebah, and live accommodation listings place the property on that road in Mas, within Ubud district and Gianyar Regency. This puts guests near the Pengosekan side of town, with restaurants and cultural attractions close at hand. It does not put the project on the beach, nor does it make every central-Ubud errand a short walk. The last part of the trip will depend on traffic and transport.
The layouts span a much wider range than the apartment label might suggest. Project materials show studios from 30 square metres and one-bedroom apartments from 64 square metres. The Stone townhouse has a stated area of 182 square metres on two levels. Villa Mira is marketed with two bedrooms and an office, while Villa Losta has four bedrooms and substantially more room for groups. These arrangements serve different guests: a compact apartment may suit a couple or a solo visitor; a larger private house requires more cleaning and maintenance but can accommodate families staying together.
Some amenities appear to be functioning now. Guest accommodation descriptions mention staffed arrivals, security, parking, a lobby café, a pool and access to the Nova Wellness Club, including exercise and spa facilities. Crucially, one listing says wellness-club admission carries an additional charge. This is exactly the sort of operational detail a glossy site plan can obscure. A facility may exist without being included in owners' maintenance fees or guests' nightly rates. The service agreement, not the amenity icon, determines who pays for access.
Other parts of the vision remain future-facing. The official project materials show a third phase involving retail, restaurants, coworking space, a cinema and an events venue. If delivered and properly operated, these could create a more varied daily environment than a standalone villa compound. They also introduce more moving parts: separate commercial operators, potential noise, different opening hours and operating rules. Neither a target area in square metres nor an illustration establishes that a tenant or an owner will receive free, permanent access to those spaces.
The project's own website publishes a programme of 12 villas, 18 townhouses and 94 apartments, alongside 16,000 square metres of residential development. A separate sales microsite lists 98 apartments, while Balinsky and BDA describe 128 units overall. These are not interchangeable figures. A change in apartment configuration is possible, but no dated, authoritative schedule resolving the variation was found. For an actual purchase, the useful document is the latest signed master plan identifying the exact unit and phase; a headline development total cannot do that work.
Public asking prices begin at USD 97,300 on a Balinsky listing checked on 16 October 2026. The figure is a market offer, not a verified price sheet covering all the project's stock. There is a revealing inconsistency even at the low end: an agency describes a 30-square-metre listing as a one-bedroom apartment, whereas the project catalogue uses that size for a studio. The floor plan and unit identifier matter more than either heading. Final costs will also depend on the tax allocation, the documents involved, included furniture and whatever payment schedule the seller is prepared to commit to.
Ownership is presented primarily through a contractual land lease, not direct foreign ownership of Indonesian land. The project website refers to a land lease ending in 2053 and an option to extend for 20 years at a pre-agreed price. Other agencies simplify this to a 30-year lease. These formulations cannot be reconciled without seeing the title, the start and end dates, and the unit contract. The purchase price may be the same on two listings while the remaining usable lease term differs, which changes how a future buyer values the asset.
Indonesian land law also makes the legal vocabulary material. Hak Milik is a land ownership title that cannot simply be registered in a foreign individual's name. Hak Pakai and Hak Guna Bangunan are different statutory rights, subject to their own eligibility and use rules. A contractual lease is another arrangement again. Nothing in the public marketing identifies the registered landholder and establishes the exact chain under which each buyer receives their rights. A proper comparison between units needs the land certificate, relevant agreements, permitted use and any restrictions on transfer or subletting.
The project advertises PBG building approval and a long structural warranty, but no numbered approval or certificate was available for inspection during this research. PBG concerns the building permission process; SLF is the document certifying functional fitness before a building is used. They should not be conflated with a promotional handover date. The first phase's guest operation is encouraging evidence that parts are in use, yet it is not a substitute for checking the applicable SLF and hospitality permissions. The second-phase hotel concept makes permitted use and licensing particularly important.
There is a recognisable developer brand but less clarity about the Indonesian contracting entity. The official project website links to the MBM Group website as its developer reference. The group's own website concentrates on industrial construction work in Russia; it does not, by itself, establish who owns the Ubud site or which Indonesian company will sign a lease and collect payments. Another project sales page calls MBM the developer, while some property portals identify the developer only as Hidden. These names should be connected by documents, not treated as automatically equivalent.
The marketing offers furnished handover and instalments, and it promotes a managed rental model. These can make ownership easier, provided the obligations are real and priced clearly. A furnished unit should come with a complete inventory and an agreed method for handling defects. A management contract needs to explain booking commissions, maintenance reserves, utilities, cleaning, owner stays and the process for transferring rental proceeds. A claim about projected yield says very little until those deductions, expected vacancies and the buyer's actual lease term are taken into account.
The strongest reason to look at Hidden City Ubud is the combination of a lived-in villa section and a more ambitious apartment-and-amenities plan in one identifiable location. The strongest reason not to rush is that the first phase's visible operation does not validate the next phase's completion or every claimed service. Anyone planning personal use can focus on the actual house or apartment experience. Anyone buying for rental income needs a unit-level income and expense forecast, evidence of lawful use and an exit plan tied to the remaining lease. The development name alone is not an investment case.
Ownership format
The project markets a contractual land lease running to 2053, with an option for another 20 years at a price said to be agreed in advance. The land title and unit-level agreement have not been inspected, so neither the extension nor its price is independently established.
Unit types & sizes
The project catalogue shows a combined living and kitchen area, bathroom and balcony. Some agency listings call a 30 sqm unit a one-bedroom, so verify the actual floor plan rather than relying on the category name.
Get floor plans and current pricesA separate bedroom, kitchen-living space and balcony are shown in the developer catalogue. These units belong to the apartment phase, making handover and operating permissions distinct questions from those for existing villas.
Get floor plans and current pricesThe project catalogue includes this layout in the apartment phase, although a dependable size was not published. It was marked sold out on the primary site; any resale offer would need separate verification.
Get floor plans and current pricesA two-level layout with an open kitchen-living room, balcony and stated 12 sqm terrace. It offers a more house-like layout than the compact apartment formats.
Get floor plans and current pricesA two-storey home with an office and a stated 14 sqm terrace. The precise plot position, any private pool and the included maintenance services should be confirmed per villa.
Get floor plans and current pricesThe developer shows two levels, an office and a 21 sqm terrace. Its capacity may suit a family or a group, but larger accommodation generally requires a different cleaning and maintenance budget.
Get floor plans and current pricesPrices are the lowest the brokerage boards publish as of October 2026, not the developer’s price list — the price and availability of a specific unit are something we go through with you personally.
Comparable projects in the same city
Each option includes a factual reason for the comparison. Price and availability are confirmed for the selected unit.

SECRET by INSHI
Same property type and a close price anchor

Green Dragon Resort Club
Same property type and a close price anchor

INDARI by BALIX
Same property type and a close price anchor

TERRACOTTA Ubud
Same property type and a close price anchor
Facilities
10 amenities
Wellness and recreation
- outdoor swimming pool
- fitness room
- sauna
- hammam
Everyday services
- security
- guest reception
- parking
- lobby area
Food and drinks
- lobby café
- restaurant service
Location
- The strongest address evidence is Jalan Made Lebah on the Pengosekan side of southern Ubud. Accommodation listings place it in Mas, Ubud District, Gianyar Regency.
- The Agung Rai Museum of Art and local dining streets are in the surrounding area. This is a cultural and wellness-oriented Ubud setting, not a beachfront property.
- The project website links directly to a Google Maps pin in this area. Its footer instead prints “Jalan Raya, Petult”, an address that conflicts with the accommodation listings and map reference.
Address / landmarkJl. Made Lebah, Mas, Kecamatan Ubud, Kabupaten Gianyar, Bali 80571, Indonesia
The map loads from OpenStreetMap on request.
The circle shows the project’s approximate location; we confirm the exact address and the plot boundaries when you get in touch. © OpenStreetMap contributors.
About this district
- District guide
- Ubud, Bali: Living and Property Guide →
The district guide explains everyday context. Check the specific unit, price and documents separately.
Near the project
Landmarks around the project, from open maps (OpenStreetMap):
Distances are straight-line from the project, not walking routes — the real route is longer. © OpenStreetMap contributors.
What this project means for me
Build your scenario from the published facts and your choices on this page. Not a rating or a return promise.
Choose a goal; your selections in the widgets below will appear in the summary.
No conditions selected yet. Select the relevant criteria and nearby places in the widgets below.
Resolve questions before booking
Prepare a request around published unknowns and your conditions. Nothing is sent automatically.
Data freshness and provenance
- Latest recorded source / material check
- Price
- Public-listing reference
- Open items in the discrepancies section
- 3
The date belongs to an editorial record, not every individual fact. It does not verify a reviewed contract, legal clearance, current price or unit availability.
Price basis · Discrepancies · Dossier sourcesDaily essentials at a glance
The closest mapped place in each available category.
Indomaret
Guardian
OpenStreetMap · straight-line distances from the mapped project area, not walking routes.
Could I live here without a car?
Choose what matters to you and a comfortable radius. A mapped place is not proof of a walkable route.
OpenStreetMap · straight-line distances from the mapped project area, not travel time. “Not mapped” does not mean the place does not exist; verify the actual route and crossing.
When is it more comfortable to visit?
Temperature, rain, sun and wind month by month for the surrounding area.
NASA POWER · 2001–2025 · area-wide climate averages, not a daily forecast. Rain bars show mm/day. Sun line is solar energy, not a count of sunny days.
What are my months here like?
Select the months you expect to stay to compare their long-run climate averages.
Select one or more months.
Climate: NASA POWER, 2001–2025 area averages; solar energy is not sunny-day count. Tourism: observed months for Bali island, not seasonal norms or this property’s rental occupancy.
Airports and local transport
Compare nearby arrival points before choosing a route.
Distances are straight-line from the mapped project area, not driving distances or travel times. Airport positions are reference points; the transport stop is from OpenStreetMap.
Tourism in the wider destination
Bali · 2025
Visitor flow month by month
Direct foreign arrivals to Bali and occupancy of star-rated hotel rooms across the island
What is actually nearby
Selected visitor-friendly places within 5 km
Bali provincial government, citing BPS · Bali provincial government citing BPS; island-wide arrivals, not this property’s occupancy. Nearby counts are selected OpenStreetMap places, not measured foot traffic.
How housing prices have changed
Indonesia · published price index, historical data
2015-Q1 — 2026-Q2 · BIS / Bank Indonesia · 2010=100. Regional housing index, not villa transaction prices or this project’s return.
Nearby projects on the map
Published sale-price references within 5 km, not rental listings or confirmed availability.
Compare the project with nearby alternatives
Approximate project locations and straight-line distances. Sale prices cannot be treated as comparable rent.
What should I read about this choice?
A short route from daily-life questions to market evidence. Selected for this project’s location and stage; these pages do not verify the project itself.
Living and buying
Price & purchase terms
- Current price: From 1,750,037,800 IDR
- Expected completion: 2026
We show the lowest of the prices the brokerage boards publish: their figures for the same unit differ by a few per cent, and none of them is the developer’s price list. We ask the developer for the current price, availability and payment terms on the unit you are looking at, and go through them with you personally.
Published payment terms
The project advertises interest-free instalments for apartments before handover, without publishing one binding schedule for every buyer. A separate sales website shows a 1% / 30% / 69% split; it should not be treated as a developer-approved payment plan without the signed terms.
What could waiting for the keys cost me?
The card states an expected completion period, not a contractual key-handover date.
Same fixed Bank Indonesia reference snapshot as the catalogue and AI adviser, dated 2026-10-21. Not a live exchange quote; exchange fees and spreads are excluded.
Your own cost scenario, not a predicted delay or a project estimate. Confirm the contractual handover date and conditions for delays in the SPA; blank inputs mean unknown.
Investment return calculator
The starting amount is the published project price. Adjust the sliders to compare scenarios.
Test a bad rental year
Compare your current inputs with a lower occupancy and higher share of running costs. Set the changes yourself; this is a stress test, not a forecast.
Show the calculation by year
| Year | Gross rent | Running costs | Cumulative net rent | Property value | Total |
|---|
8% potential gross rent, 65% occupancy, 20% running costs and 3% price change are editable examples, not a forecast. Taxes, financing, transaction fees and resale terms are excluded. Occupancy and costs apply to rent, not to the property value.
What does an empty property cost?
Enter your own expenses. No market averages are assumed.
Blank fields are unknown, not zero. This is not a full ownership budget: taxes, loan payments, transaction costs and unexpected repairs are excluded unless you include them yourself.
What else can you compare it with?
Change rent, occupancy and costs above; public benchmarks are reference points.
The property bar is net rental cash flow divided by purchase price, before tax; it excludes price growth. US Treasury yield is in USD. Inflation shows purchasing-power erosion, not a separate investable return. Risk, taxes, liquidity and currency differ. US CPI source
Project stage — what we know
Under construction. Handover declared for 2026.
Before reserving, check the timeline, payment schedule and buyer protections in the contract.
- Planned
- Building
- Done
What we know
Verified details and questions to settle before reserving.
8 key facts confirmed; 6 more to verify before reserving.
This is not a project rating.
At a glance
Is this project right for you?
Tick what describes you — we will show whether this may be a fit. Honest, without gloss.
Your selections are not saved anywhere. This is a decision aid, not an assessment.
Best for: Buyers who want a home base in the Ubud area and would benefit from comparing an already operating townhouse or villa with an apartment still tied to a separate delivery process.; People comfortable with reviewing an expiring contractual lease, the extension mechanics and the maintenance obligations before agreeing a purchase price.; Families or groups seeking kitchens, separate bedrooms and access to Ubud restaurants and activities rather than direct access to a beach.; Investors willing to underwrite the exact unit on net rental cash flow, permitted use, occupancy uncertainty and the resale value of a diminishing lease term.; may not suit: Anyone requiring a fully finished integrated district today, complete with the proposed retail, cinema and event spaces; these elements are not all evidenced as operational.; Foreign buyers who require direct, perpetual land ownership in their personal name. The advertised structure is a time-limited contractual lease.; Buyers who expect an assured, hands-off rental return from promotional yield percentages without allowing for fees, vacancies, repairs and legal permissions..
What we confirm before booking
A short, project-specific list. We request these from the developer and go through them with you before any payment.
- The main site states 94 apartments, a separate sales site 98, and Balinsky/BDA 128 total units. No dated approved schedule was found to reconcile those counts. The primary website retains Q3 2026 for apartment delivery while another seller gives Q4 2026; the proposed third phase remains future-facing.
- The official map pin and operating accommodation listings point to Jalan Made Lebah in the Mas area, while the project footer prints “Jalan Raya, Petult”. The map pin identifies the development vicinity, but the cadastral parcel, site boundary and exact village attribution were not independently documented.
- The project points to MBM as a developer reference; agencies variously use Hidden or PT MBM Indonesia Group. The Indonesian seller entity, land title, numbered PBG, SLF, rental permissions and signed lease were not available for inspection. The advertised 2053 expiry also differs from agency descriptions of a 30-year lease; a 20-year renewal has not been verified in a signed agreement.
Disputed and unknown information
This keeps the open points in one place. A missing or disputed fact is not treated as a conclusion.
- The main site states 94 apartments, a separate sales site 98, and Balinsky/BDA 128 total units. No dated approved schedule was found to reconcile those counts. The primary website retains Q3 2026 for apartment delivery while another seller gives Q4 2026; the proposed third phase remains future-facing.
- The official map pin and operating accommodation listings point to Jalan Made Lebah in the Mas area, while the project footer prints “Jalan Raya, Petult”. The map pin identifies the development vicinity, but the cadastral parcel, site boundary and exact village attribution were not independently documented.
- The project points to MBM as a developer reference; agencies variously use Hidden or PT MBM Indonesia Group. The Indonesian seller entity, land title, numbered PBG, SLF, rental permissions and signed lease were not available for inspection. The advertised 2053 expiry also differs from agency descriptions of a 30-year lease; a 20-year renewal has not been verified in a signed agreement.
FAQ
What does a unit cost in Hidden City Ubud?
From 1,750,037,800 IDR — per broker listings, October 2026. Prices are the lowest the brokerage boards publish as of October 2026, not the developer’s price list — the price and availability of a specific unit are something we go through with you personally.
When is Hidden City Ubud due for completion?
2026. The contractual handover date is fixed in the SPA.
Sources0
Reviewed: developer materials and public records. We publish no outbound links.
Verified against official developer materials.

Andrey Balinsky
NovAsia Bali property expert. He will help compare the unit, location, ownership structure and terms before you decide.
Ask about Hidden City Ubud →Need help with a specific project?
Send the project name, a link or a written offer. We can match the exact property, seller, title route, stage and current unit terms before you decide.
Informational, not a public offer or personal investment, legal or tax advice. Price, availability, payment terms and guaranteed-return/buyback conditions are confirmed per unit with the developer and their contract.