NovAsia

The Petit Tycoon

The Petit Tycoon is an under-construction, low-rise condominium development in Surin, positioned between Surin and Bang Tao beaches.

Phuket

Overview of The Petit Tycoon in Phuket

From 10,575,000 THBPer broker listings. Current price list, layouts and availability — discussed one-to-one with a project specialist

QUICK — 10-SECOND READ

Quick — 10-second read

What it is
Condominium
Where
Phuket
Stage
Under construction · 2026
Price
From ฿10,575,000guide price, final by unit
Transparency
10 facts confirmed · 7 to verify

Why this project is worth a look

Large coastal floor plans

The product starts with genuine family-sized homes rather than studios. Even the smaller two-bedroom layouts are substantial by resort-condominium standards, while the upper-tier duplex and pool residences move into villa-like territory. That makes the project more relevant to owner-occupiers and long-stay buyers than to someone whose priority is the lowest possible investment ticket.

Condo title, villa scale

Some larger homes have private pools, duplex layouts and villa-style proportions, yet the project is structured as a condominium. For a foreign buyer that distinction can be valuable because a qualifying unit may be held in foreign freehold within the available quota, avoiding the land-ownership issue that comes with a detached villa. The exact title and quota position must still be verified before reservation.

Surin is genuinely close

This is not an inland Cherngtalay project using the beach as a distant marketing reference. Surin is the immediate local environment, while Bang Tao, Laguna and Porto de Phuket remain short drives away. For buyers who choose Phuket's west coast primarily for day-to-day beach access, that location has more practical weight than a long amenity list.

Boutique residential count

The developer lists 77 residential units across two buildings and four wings. That is relatively compact compared with many new west-coast condominium schemes and can support a more private residential feel. The counterpoint is the integrated Tycoon Marché retail component on the lower levels, so buyers should expect a mixed-use setting rather than the isolation of a private gated villa estate.

Completion still matters

The project remains an off-plan or under-construction purchase in practical terms, with Q4 2026 still being quoted in current material. A 30-day construction suspension followed the January 2026 crane incident. Before committing, the buyer should obtain up-to-date construction evidence, a contractual handover date and a unit-specific payment schedule rather than relying on older portal completion fields.

Project participants

Who is behind this project

Project participant
The ChardonnayCatalogue projects: 1Open developer profile →

About the project

The Petit Tycoon is an under-construction, low-rise condominium development in Surin, positioned between Surin and Bang Tao beaches. The developer's current project profile describes two buildings arranged as four wings, rising to a maximum of six floors, with 77 residential units. This is not a typical resort scheme built around studios and compact one-bedroom apartments. The product starts with comparatively large two-bedroom homes and moves up through family suites, penthouses and duplex pool residences. In practical terms, buyers should compare it with boutique coastal residences rather than high-volume holiday condominiums where unit count and small-ticket investment stock dominate the proposition.

The most distinctive part of the project is the attempt to deliver villa-scale living inside a condominium legal structure. Public inventory shows two-bedroom homes from roughly 65 sqm, three-bedroom residences extending toward 198 sqm, four-bedroom formats reaching around 310 sqm and larger duplex configurations up to 349.17 sqm. Some of the upper-tier units are marketed as Sky Pool Villas or villa-style residences and may include a private pool, large terraces, duplex layouts or private-lift access. Those labels describe the lifestyle and floor plan, not the legal title. A foreign buyer should therefore verify the exact condominium title and foreign-quota status of the chosen unit instead of assuming that the word “villa” means ownership of land.

Read moreShow less

The site is on Soi Surin 8/3 in Choeng Thale, close to Surin Beach and within a short drive of the wider Bang Tao and Cherngtalay lifestyle area. The developer's location material gives indicative travel times of about one minute to Surin Beach, three minutes to Bang Tao Beach and roughly nine minutes to Porto de Phuket. Those figures will move with traffic and the precise route, but the underlying location point is useful: Surin is the immediate beach environment, while the supermarkets, restaurants, schools, clinics and retail around Bang Tao and Laguna form the project's everyday catchment rather than a distant destination.

Facilities are extensive for a 77-residence scheme. The published list includes a swimming pool, gym and yoga room, sauna, lounge, game room, mini theatre, lobby, lifts, 24-hour security, CCTV and a first-aid room, together with landscaped areas branded as Whispering Woods. The lower levels connect to Tycoon Marché, a commercial component planned for dining, boutique retail and daily services. This commercial element explains a recurring data conflict online: the developer identifies 77 residential units, while several aggregators display 101 total units by combining the 77 residences with 26 commercial spaces. For a residential project record, 77 is the more useful unit count, with the retail component described separately.

The developer is The Chardonnay Co., Ltd. Its own corporate material describes the company as a joint venture between Phuket-based Boat Pattana and Finfinite Asset, with registered capital of THB 218 million. The Chardonnay itself is a relatively new development vehicle, so it should not be presented as if it personally delivered decades of completed projects. The relevance of the partnership is narrower and more concrete: Boat Pattana brings an established local property background, while Finfinite Asset is presented as the financial-investment partner. That corporate context is useful, but it does not replace project-level due diligence on permits, title, contract terms, construction progress and the company receiving the buyer's money.

Completion timing needs careful treatment. As of 17 September 2026, the developer's live project material and several recently updated market pages continue to target Q4 2026, so the development should still be treated as under construction rather than automatically marked completed because some portal databases carry an August 2026 completion field. There is also a material construction-history point: in January 2026 local authorities ordered a 30-day suspension after a steel reinforcing beam fell from a crane and damaged a neighbouring house. No injuries were reported. Later market sources again describe the project as actively under construction and for sale, but we did not find a separate public municipal notice that states the exact date on which the suspension was formally lifted.

Pricing is not a single clean number. At the time of this review, FazWaz showed a lower active listing around THB 10.575 million, while the developer's own website advertised a starting level above THB 13 million and other live market pages sat around the THB 11–13 million range. That gap can reflect a particular unit, tenure, remaining inventory, resale positioning or sales terms. It is therefore safer to treat THB 10.575 million as a lower market anchor, not as the universal developer price. A serious buyer should obtain a current availability sheet that identifies building, floor, internal area, tenure, reservation amount, payment milestones and all transfer-related charges for the exact residence.

The project makes the most sense for a buyer who values a walkable Surin location, larger family-sized floor plans and the possibility of condominium freehold rather than land ownership. The larger residences can provide a villa-like amount of space without requiring the buyer to take on a private-land structure, provided the selected unit is available in the foreign quota. The trade-offs are equally clear: the entry price is high, the project is still being completed, and some commercially important details vary across sales sources. Rental demand and future value should be modelled from the selected unit's purchase price, recurring costs and realistic occupancy assumptions; advertised yield claims are not a substitute for that calculation.

Ownership format

Condominium ownership: a foreign buyer may take freehold title within the statutory 49% foreign quota; the project also offers leasehold. Foreign-quota availability and the exact tenure of the selected residence should be verified before reservation.

Home types & sizes

2-bedroom Family Suite
approx. 65–99 sqm
typically 2 bathrooms in current listings

The entry family format, aimed at buyers who want two proper bedrooms and a Surin location without moving into the much larger penthouse pricing. Exact internal area and tenure vary by unit.

3-bedroom Grand Family Suite / Sky Pool Villa
approx. 95–198 sqm
typically 3 bathrooms in current listings

This category spans materially different products, from conventional family apartments to larger pool or terrace residences. Bedroom count alone is not enough; building, floor, area and private outdoor space materially change the product.

4-bedroom Penthouse / Duplex Sky Pool Villa
approx. 169–310 sqm
4–5 bathrooms in public listings

A high-end family category ranging from large penthouses to duplex pool residences. At these sizes and prices the natural comparison is with detached villas, making condominium title and foreign-freehold eligibility especially relevant to an international buyer.

5-bedroom Duplex Sky Pool Villa
up to 349.17 sqm in the current listing
5 bathrooms in the current large-unit listing

One of the project's largest formats, combining duplex living, a private pool and villa-scale area. It is a niche, high-ticket product; before comparing price per square metre, the buyer should confirm which outdoor areas, fit-out and tenure are included in the specific residence.

Public sources use different layout names and show different slices of available inventory. The ranges above reflect verified current listings and the published product line, not a complete live price list; obtain the seller's current availability sheet before reservation. The source of each published official starting price is stated alongside it. Separate market listings are not the developer’s price list; confirm the selected unit’s price, availability and terms through its sale channel.

✦ Similar projects

Comparable projects in the same city

Each option includes a factual reason for the comparison. Price and availability are confirmed for the selected unit.

See more projects in this city →

Facilities

17 amenities

Fitness and wellness

  • swimming pool
  • gym
  • yoga room
  • sauna

Resident spaces

  • lounge
  • game room
  • mini theatre
  • lobby
  • Whispering Woods landscaped garden

Security and service

  • 24-hour security
  • CCTV
  • lifts
  • first-aid room

Integrated retail

  • Tycoon Marché
  • restaurants and cafes
  • boutique retail
  • daily services

How the tower is arranged

  1. B1 and ground levelsTycoon Marché retail and dining component with everyday services

Location

  • Surin Beach is the nearest beach environment; both project material and independent pages place it within walking or very short-trip distance.
  • Bang Tao Beach is quoted at roughly a 3-minute drive in the project's location material.
  • Porto de Phuket and the Boat Avenue area are quoted at roughly a 9-minute drive.
  • HeadStart International School's Thalang campus is quoted at roughly a 12-minute drive.
  • Bangkok Hospital Clinic in the Laguna area is quoted at roughly a 12-minute drive.

Address / landmarkSoi Surin 8/3, Choeng Thale, Thalang, Phuket Province, Thailand

The map loads from OpenStreetMap on request.

The circle shows the project’s approximate location; we confirm the exact address and the plot boundaries when you get in touch. © OpenStreetMap contributors.

Near the project

Landmarks around the project, from open maps (OpenStreetMap):

Audy Restaurant70 mRestaurant
Twin Brother101 mRestaurant
Tops Daily114 mStore
Surin Chill House177 mCafe
Chan191 mCafe
bhorn por mae318 mRestaurant
Gastroport371 mRestaurant
La pasta378 mRestaurant
Gastro Port391 mRestaurant
Thai Restaurant468 mRestaurant
7-Eleven475 mStore
Khun Yaa Seafood479 mCafe
The Red Tablecloth488 mCafe
Blue Lagoon497 mRestaurant
trap bar restaurant504 mRestaurant
Lotus's go fresh533 mStore
CannaBo542 mCafe
7-Eleven574 mStore
Grind House Cafe601 mCafe
Butterfly Restaurant647 mRestaurant
Phuket Coffee Lab702 mCafe
Puko ´s bar712 mBar or club
Snus Point Surin719 mStore
Mama Bar786 mBar or club
The Goat Bar795 mBar or club
Minimark800 mStore
Siam Mumbai826 mRestaurant
Nok Jo Bar840 mBar or club
7-Eleven849 mStore
FamilyMart903 mStore
lrish restaurant984 mCafe
7-Eleven1081 mStore
Ola1150 mStore
Thai fastfood1178 mRestaurant
The Big Restaurant1225 mCafe
Catch Beach Club1287 mBeach club
Plaseafood1301 mCafe
Phuket adventure mini golf1313 mAttraction
7-Eleven1504 mStore
Coffee1592 mCafe
Tops Daily1683 mStore
7-Eleven1945 mStore
Super Cheap1972 mStore
Tops2041 mStore
MAYA beach club2070 mBeach club
Shimmer2073 mRestaurant
Rocker on Kamala2087 mAttraction
The Local Beach Bar2088 mBar or club
Thai home food2091 mRestaurant
Jaras2103 mRestaurant
Café Del Mar Phuket2126 mBar or club
Beach Restaurant2132 mRestaurant
Cafe Del Mar2279 mBar or club
7-Eleven2322 mStore
Lotus's2355 mStore
Meena Restaurant2403 mRestaurant
The Pizza Company2411 mRestaurant
Mine Café2412 mCafe
McDonald's2422 mRestaurant
Cherngtalay-Sainamyen International Clinic2466 mHospital or clinic
Timecoffeehouse592487 mCafe
Chit Chat Corner2545 mCafe
Tops2630 mStore
7-Eleven2672 mStore
Golden Kinaree2731 mRestaurant
Nanork Seafood2740 mRestaurant
Leaf & Spirit2753 mCafe
Phuket FantaSea2774 mAttraction
Smile Bar2785 mCafe
Lillo island2804 mCafe
Avoi Seafood2855 mRestaurant
Freedom Restaurant2858 mRestaurant
Family Mart2865 mStore
Pond Restaurant2865 mRestaurant
Jay is happy2885 mRestaurant
S Café & Restaurant2939 mRestaurant
Tomyumgoong2945 mRestaurant
Cut Grill & Lounge2947 mRestaurant
Little Paris2960 mRestaurant
Albatross2988 mRestaurant
Torcedora cigar shop3032 mBar or club
Konim Thai food3035 mCafe
Ann’s Kitchen Bar and Grill3044 mBar or club
Choeng Thale Fresh Fruit Market3044 mStore
7-Eleven3047 mStore
23 Tapas Bar3048 mBar or club
Brewbridge3057 mBar or club
Mor-Ya Pharmacy3059 mPharmacy
Porto de Phuket3066 mStore
Family Mart3068 mStore
Healthy Pharmacy3089 mPharmacy
Beer Box Avenue3100 mBar or club
Super cheap3100 mStore
Thai beer pub, some tai food3100 mBar or club
7-Eleven3109 mStore
Pharmacy3119 mPharmacy
The Coffee Club3119 mCafe
drinks & co3126 mBar or club
Phuket Coffee Lab3130 mCafe
MHCP Medical Health Clinic3134 mHospital or clinic
Khaowhom Thaifood3141 mCafe
Coffee Table Top3149 mCafe
Bang Tao Beach3182 mBeach
KAYU Café3230 mCafe
7-Eleven3338 mStore
CityCare3401 mHospital or clinic
Sync Coffee3415 mCafe
SYNC3426 mCafe
Panama market3468 mStore
Herbal House 23469 mPharmacy
Big Boys Burger Club3473 mCafe
Sienna Rocks Cafe3484 mCafe
Wattanapat Hospital Phuket3539 mHospital or clinic
Aussie Pub3589 mBar or club
Kamala Beergarden3589 mBar or club
Buffet3608 mCafe
Kamala Rock Beach / The Other Kamala Beach / Rayee Beach3840 mBeach
Bubbles & Beach3843 mBar or club
NONG BAR3999 mBar or club
Cider House4133 mBar or club
Café Amazon4324 mCafe
The Imron4918 mAttraction

Distances are straight-line from the project, not walking routes — the real route is longer. © OpenStreetMap contributors.

YOUR DECISION

What this project means for me

Build your scenario from the published facts and your choices on this page. Not a rating or a return promise.

Choose a goal; your selections in the widgets below will appear in the summary.

No conditions selected yet. Start with fit criteria, everyday places or the months you plan to stay.

NEXT STEP

Resolve questions before booking

Prepare a request around published unknowns and your conditions. Nothing is sent automatically.

Data freshness and provenance
Latest recorded source / material check
Price
Public-listing reference
Open items in the discrepancies section
3

The date belongs to an editorial record, not every individual fact. It does not verify a reviewed contract, legal clearance, current price or unit availability.

Price basis · Discrepancies · Dossier sources
EVERYDAY LIFE

Daily essentials at a glance

The closest mapped place in each available category.

Shopping114 m

Tops Daily

Healthcare2,466 m

Cherngtalay-Sainamyen International Clinic

OpenStreetMap · straight-line distances from the mapped project area, not walking routes.

DAILY ROUTINE

Could I live here without a car?

Choose what matters to you and a comfortable radius. A mapped place is not proof of a walkable route.

My radius

OpenStreetMap · straight-line distances from the mapped project area, not travel time. “Not mapped” does not mean the place does not exist; verify the actual route and crossing.

WEATHER THROUGH THE YEAR

When is it more comfortable to visit?

Temperature, rain, sun and wind month by month for the surrounding area.

Driest monthFebruary
Rainiest monthSeptember
Average annual temperature27.1 °C
0Rainfall, mm/day10.9
January🌡 26.1 °C☂ 3 mm/day☀ 5.1 kWh/m²/day↝ 2.5 m/s
February🌡 26.7 °C☂ 0.9 mm/day☀ 5.9 kWh/m²/day↝ 2.3 m/s
March🌡 27.9 °C☂ 3.4 mm/day☀ 6.1 kWh/m²/day↝ 2 m/s
April🌡 28.5 °C☂ 4.3 mm/day☀ 5.9 kWh/m²/day↝ 1.9 m/s
May🌡 28 °C☂ 7.7 mm/day☀ 4.9 kWh/m²/day↝ 2.3 m/s
June🌡 27.5 °C☂ 8.6 mm/day☀ 4.7 kWh/m²/day↝ 2.6 m/s
July🌡 27.2 °C☂ 7.8 mm/day☀ 4.6 kWh/m²/day↝ 2.7 m/s
August🌡 27.1 °C☂ 9 mm/day☀ 4.7 kWh/m²/day↝ 2.8 m/s
September🌡 26.8 °C☂ 10.9 mm/day☀ 4.6 kWh/m²/day↝ 2.6 m/s
October🌡 26.8 °C☂ 10.2 mm/day☀ 4.5 kWh/m²/day↝ 2.3 m/s
November🌡 26.8 °C☂ 7.7 mm/day☀ 4.6 kWh/m²/day↝ 2.1 m/s
December🌡 26.2 °C☂ 4.5 mm/day☀ 4.5 kWh/m²/day↝ 2.5 m/s

NASA POWER · 2001–2025 · area-wide climate averages, not a daily forecast. Rain bars show mm/day. Sun line is solar energy, not a count of sunny days.

YOUR MONTHS HERE

What are my months here like?

Select the months you expect to stay to compare their long-run climate averages.

Select one or more months.

Climate: NASA POWER, 2001–2025 area averages; solar energy is not sunny-day count. Tourism: observed months for the province, not seasonal norms or this property’s rental occupancy.

GETTING HERE

Airports and local transport

Compare nearby arrival points before choosing a route.

HKT · Phuket International≈ 15 kmairport

Distances are straight-line from the mapped project area, not driving distances or travel times. Airport positions are reference points; the transport stop is from OpenStreetMap.

TRAVEL DEMAND

Tourism in the wider destination

Phuket · September 2026

Foreign visitors812,970
All visitors1,051,080
Hotel occupancy66.3%

Visitor flow month by month

Foreign visitors and hotel room occupancy in the province

Jan1,042,90283.7% rooms
Feb936,58082.2% rooms
Mar783,43877.9% rooms
Apr827,71177.2% rooms
May795,77471.6% rooms
Jun673,16061.7% rooms
Jul895,10674.2% rooms
Aug835,62270% rooms
Sep812,97066.3% rooms
Observed months 2026-01–2026-09; not a long-run seasonal average.

What is actually nearby

Selected visitor-friendly places within 5 km

Restaurants 30Cafes 29Places to visit 4Bars 19Beach clubs 2

Thailand Ministry of Tourism and Sports · Ministry of Tourism and Sports · preliminary monthly province figures, not this property’s rental occupancy. Nearby counts are selected OpenStreetMap places, not measured foot traffic.

MARKET DYNAMICS

How housing prices have changed

Southern Thailand · published price index, historical data

Index now166.1
Last 12 months+4.6%
Since 2015+39.2%
Average per year+2.9%
1171431692015201720192021202420262026-08166.1
2019-09+16%from start
2024-04+24.4%from start

2015-01 — 2026-08 · Bank of Thailand · 2011=100. Regional housing index, not villa transaction prices or this project’s return.

LOCAL COMPARISON

Nearby projects on the map

Published sale-price references within 5 km, not rental listings or confirmed availability.

Approximate project locations and straight-line distances. Sale prices cannot be treated as comparable rent.

READ BEFORE DECIDING

What should I read about this choice?

A short route from daily-life questions to market evidence. Selected for this project’s location and stage; these pages do not verify the project itself.

Market snapshot

Prices by layout

2 bedrooms

Primary sale

10,575,000–24,700,000 THB

Advertised area 66–81 m²Price per m² 160,227–304,938 THB

2 bedrooms

Primary sale · Foreign quota

13,800,000–17,856,180 THB

Advertised area 65.26–94.57 m²Price per m² 188,814–211,462 THB

2 bedrooms

Primary sale · Local quota

19,200,000 THB

Advertised area 98.96 m²Price per m² 194,018 THB
All layouts and terms 8

3 bedrooms

Primary sale · Foreign quota

18,088,380–48,315,789 THB

Advertised area 95.64–197.81 m²Price per m² 189,130–244,254 THB

3 bedrooms

Primary sale

25,990,000–45,900,000 THB

Advertised area 147–198 m²Price per m² 159,545–231,818 THB

4 bedrooms

Primary sale

27,490,000 THB

Advertised area 169 m²Price per m² 162,663 THB

4 bedrooms

Primary sale · Leasehold

48,750,000 THB

Advertised area 289.7 m²Price per m² 168,278 THB

5 bedrooms

Primary sale

55,470,000 THB

Advertised area 349 m²Price per m² 158,940 THB

Guides based on published asking prices. Confirm availability and the price of a specific unit before purchase.

Comparable properties

Purchase prices at comparables

Matched by property type, bedrooms, size, stage and known transaction terms. Each development counts once in the median.

2 bedrooms · Primary sale
3 bedrooms · Primary sale
4 bedrooms · Primary sale

Rents at comparable properties

Asking rents at other buildings and developments.

Condo · 2 bedrooms

50,000–70,000 THB /month

Advertised area 75–87 m²Observations · 2

Price & purchase terms

  • Published price reference: From THB 10.575M on an active FazWaz listing checked on 17 Sep 2026. This is a lower market anchor: the developer's own website simultaneously advertises a starting level above THB 13M, so the exact unit price, availability, tenure and terms need to be reconfirmed before reservation.
  • Expected completion: Q4 2026

We show the lowest of the prices the brokerage boards publish: their figures for the same unit differ by a few per cent, and none of them is the developer’s price list. We ask the developer for the current price, availability and payment terms on the unit you are looking at, and go through them with you personally.

BEFORE HANDOVER

What could waiting for the keys cost me?

The card states an expected completion period, not a contractual key-handover date.

Announced completion targetQ4 2026
Currency of your expenses
3 months—
6 months—
12 months—

Same fixed Bank Indonesia reference snapshot as the catalogue and AI adviser, dated 2026-10-21. Not a live exchange quote; exchange fees and spreads are excluded.

Your own cost scenario, not a predicted delay or a project estimate. Confirm the contractual handover date and conditions for delays in the SPA; blank inputs mean unknown.

INVESTMENT

Investment return calculator

The starting amount is the published project price. Adjust the sliders to compare scenarios.

Net rent over the period
Value at exit
Total before sale costs
Test a bad rental year

Compare your current inputs with a lower occupancy and higher share of running costs. Set the changes yourself; this is a stress test, not a forecast.

Your net rent per year
Bad-year net rent
Difference per year
The property price, taxes, financing and sale are not recalculated here. A negative result is possible when expenses exceed rent.
Show the calculation by year
YearGross rentRunning costsCumulative net rentProperty valueTotal

8% potential gross rent, 65% occupancy, 20% running costs and 3% price change are editable examples, not a forecast. Taxes, financing, transaction fees and resale terms are excluded. Occupancy and costs apply to rent, not to the property value.

OWNERSHIP COSTS

What does an empty property cost?

Enter your own expenses. No market averages are assumed.

Per month from entered costs—
Per year from entered costs—

Blank fields are unknown, not zero. This is not a full ownership budget: taxes, loan payments, transaction costs and unexpected repairs are excluded unless you include them yourself.

ALTERNATIVES

What else can you compare it with?

Change rent, occupancy and costs above; public benchmarks are reference points.

Property net rental scenario4.2%
after occupancy and running costs; adjust above
US Treasury, 1 year4.5%
USD · 2026-10-21
US inflation, purchasing-power erosion-3.7%
USD · 2026-09

The property bar is net rental cash flow divided by purchase price, before tax; it excludes price growth. US Treasury yield is in USD. Inflation shows purchasing-power erosion, not a separate investable return. Risk, taxes, liquidity and currency differ. US CPI source

Under construction

Project stage — what we know

Under construction. Handover declared for 2026.

Before reserving, check the timeline, payment schedule and buyer protections in the contract.

  1. Planned
  2. Building
  3. Done
Checked by NovAsia

What we know

Verified details and questions to settle before reserving.

10confirmed key facts
7to confirm before bookingConfirm these points before reserving a unit.

10 key facts confirmed; 7 more to verify before reserving.

This is not a project rating.

At a glance

DeveloperThe Chardonnay
LocationPhuket
CategoryCondominium
SubtypeBoutique low-rise condominium with villa-style residences and integrated retail
ConstructionUnder construction
Floors6
Units77
Honest fit

Is this project right for you?

Tick what describes you — we will show whether this may be a fit. Honest, without gloss.

Likely yes if
May not suit if

→ Discuss with a consultant

Your selections are not saved anywhere. This is a decision aid, not an assessment.

Best for: An owner-occupier or long-stay buyer who wants a large home near Surin rather than a compact resort-investment unit.; A foreign buyer who likes villa-scale space but prefers a condominium structure and the possibility of foreign freehold within the available quota.; A family needing two to five bedrooms, generous living areas and, in selected upper-tier layouts, a private pool or duplex configuration.; A buyer who wants the combination of Surin and Bang Tao: immediate beach access with restaurants, retail, schools and clinics still within a short drive.; An investor prepared to underwrite the exact unit using realistic occupancy and recurring costs rather than relying on advertised high-yield claims.; may not suit: A low-budget buyer looking for a studio or inexpensive one-bedroom unit; the core product here is larger and more expensive.; Someone who only wants a fully completed property with no construction-timing exposure; as of 17 Sep 2026 the current official target remains Q4 2026.; A buyer who specifically wants a detached villa with private land title; The Petit Tycoon is legally a condominium even when certain layouts are marketed as villa-style residences..

What we confirm before booking

A short, project-specific list. We request these from the developer and go through them with you before any payment.

  • which units are free, and on which floors
  • the legal entity in the SPA and the payee’s bank details
  • the title format and what is registered against the unit
  • the selected unit’s contractual handover date in the SPA — the published date is only a reference

Disputed and unknown information

This keeps the open points in one place. A missing or disputed fact is not treated as a conclusion.

  • Local authorities ordered a 30-day construction suspension in January 2026 after a steel beam fell from a crane onto a neighbouring house. Later sources again show the project as under construction, but we did not find a separate public municipal notice stating the exact formal restart date.
  • Sources conflict on unit count: the developer's residential project profile lists 77 residences, while some aggregators show 101. The difference appears to come from adding roughly 26 Tycoon Marché commercial spaces; this record uses 77 residential units.
  • Published payment schedules conflict, ranging from a 30%/70% structure to more granular construction-stage instalments. No payment schedule is included here without the current official unit-specific price sheet and contract.

FAQ

What does a home in The Petit Tycoon cost?

From 10,575,000 THB — per broker listings. The source of each published official starting price is stated alongside it. Separate market listings are not the developer’s price list; confirm the selected unit’s price, availability and terms through its sale channel.

When is The Petit Tycoon due for completion?

Q4 2026. The contractual handover date is fixed in the SPA.

Sources9
  1. Developer's official site — Document: thechardonnay.co.th/petit-tycoon/ checked 17.09.2026
  2. Developer's official site — The Chardonnay — About Us: Joint venture structure, Boat Pattana and Finfinite Asset, THB 218M registered capital checked 17.09.2026
  3. Government / official registry — Thailand.go.th — foreign ownership of condominium units: Government explanation of the 49% foreign condominium ownership quota and transfer documentation checked 17.09.2026
  4. The Chardonnay — About Us: Joint venture structure, Boat Pattana and Finfinite Asset, THB 218M registered capital thechardonnay.co.th/about-us/ 17.09.2026
  5. Storm Phuket — The Petit Tycoon: Current Q4 2026 positioning, 77-unit residential count, approx. 65–349 sqm product range, 2–5 bedroom mix, villa-style formats and developer context stormphuket.com/projects/the-petit-tycoon/ 17.09.2026
Show allHide additional sourcesanother 4
  1. ZmyHome — The Petit Tycoon: Thai address reference: Soi Had Surin 8, Road PHK 4030, Choeng Thale, Thalang, Phuket 83110 zmyhome.com/project/V910 17.09.2026
  2. The Phuket News — Cherng Talay condo project halted: January 2026 crane incident, Soi Surin 8/3 site identification, 30-day suspension order, no reported injuries thephuketnews.com/cherng-talay-condo-project-halted-no-charges-filed-over-steel-beam-incident-98970.php 17.09.2026
  3. Khaosod English — steel rod falls from luxury condo crane: Independent confirmation of the January 2026 incident and Soi Surin 8/3 location khaosodenglish.com/news/2026/01/16/steel-rod-falls-from-luxury-condo-crane-into-phuket-home/ 17.09.2026
  4. Thailand.go.th — foreign ownership of condominium units: Government explanation of the 49% foreign condominium ownership quota and transfer documentation thailand.go.th/public/issue-focus-detail/010_013 17.09.2026

Reviewed: developer materials and public records. We publish no outbound links.

✓ Current details checked

The Petit Tycoon: Current project data checked by Mark Erometskiy — 12 September 2026

Mark ErometskiyMark ErometskiyNovAsia Thailand property specialist

Because it is a low-rise scheme with limited active stock, I did not apply one blanket completion label to every building and unit.

  • ✓ Source discrepancy
  • ✓ Construction stage
  • ✓ Handover
  • ✓ Current offer
About the expert

The source disagreement is itself decision-useful: the selected building and apartment need a current handover confirmation before reservation. At The Petit Tycoon, readiness is property-specific.

The selected property's construction stage, payment schedule and handover terms must be confirmed in the current contract package.

Read next

Related

Mark Erometskiy — Thailand property expert

Mark Erometskiy

Thailand property expert (Pattaya, Phuket and Bangkok), co-founder of Bomi Home. Will help with the unit, ownership, stage and terms before you decide.

Ask about The Petit Tycoon →

Need help with a specific project?

Send the project name, a link or a written offer. We can match the exact property, seller, title route, stage and current unit terms before you decide.

WhatsApp Telegram Contacts

Informational, not a public offer or personal investment, legal or tax advice. Price, availability, payment terms and guaranteed-return/buyback conditions are confirmed per unit with the developer and their contract.